104640-7250 ZEXEL 9 461 622 618 BOSCH FUEL-INJECTION PUMP 9461622618 1046407250


 

Information fuel-injection pump

BOSCH 9 461 622 618 9461622618
ZEXEL 104640-7250 1046407250
104640-7250 FUEL-INJECTION PUMP
Rating:
54
Buy FUEL-INJECTION PUMP 104640-7250 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104740-7250 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104640-7250 
9 461 622 618 
NP-VE4/10F2150RNP805 
   
FUEL-INJECTION PUMP
Q




Information:

Remove Rocker Shaft Assemblies And Push Rods
START BY:a. remove valve covers 1. Remove four bolts (1) from the turbocharger tube adapter to the aftercooler housing. Loosen the turbocharger compressor housing clamp, and rotate turbocharger tube (2) out of the way of the cylinder head assembly. 2. Remove bolts (3) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (4).
To prevent damage to the fuel injection nozzle, hold adapter assembly (5) in position at the top of injection nozzle (6) when fuel line nut (7) is loosened or tightened.
3. Use tool (A) and a 5P328 crowfoot wrench (7/8") to loosen the fuel injection line nut at the nozzle end. 4. Use tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (8). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 5. Remove bolts (9) that hold the rocker shaft assemblies to the cylinder head assembly.6. Remove rocker shaft assemblies (10). 7. Put identification marks on the push rods as to their location in the engine. Remove push rods (11). 8. Put identification marks on the bridges as to their location in the engine. Remove bridges (12) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies And Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (1) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb.) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20° to 30° (1/3 to 1/2 of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position, and tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.). Install original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (2). 4. Put rocker shaft assemblies (3) in position on the cylinder head assembly.5. Put 5P3931 Anti-Seize Compound on the threads of the bolts that hold the rocker shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb.ft.). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb.ft.). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb.ft.).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (4). Tighten the fuel injection line adapter nuts (5) to a torque of 40 7 N m (30 5 lb.ft.)

Have questions with 104640-7250?





Group cross 104640-7250 ZEXEL

9 461 614 961 
NP-VE4/10F2150RNP796 
 
FUEL-INJECTION PUMP
9 461 614 054 
NP-VE4/10F2150RNP797 
 
FUEL-INJECTION PUMP
9 461 614 962 
NP-VE4/10F2150RNP798 
 
FUEL-INJECTION PUMP
9 461 613 662 
 
FUEL-INJECTION PUMP
9 461 613 663 
 
FUEL-INJECTION PUMP
104640-7250  
9 461 622 618 
NP-VE4/10F2150RNP805 
 
FUEL-INJECTION PUMP
9 461 614 134 
 
FUEL-INJECTION PUMP
9 461 618 309 
 
FUEL-INJECTION PUMP
9 461 622 619 
NP-VE4/10F1300RNP826 
 
FUEL-INJECTION PUMP
9 461 622 620 
 
FUEL-INJECTION PUMP
Back to top