104640-6000 ZEXEL 9 461 616 063 BOSCH FUEL-INJECTION PUMP 9461616063 1046406000


 

Information fuel-injection pump

BOSCH 9 461 616 063 9461616063
ZEXEL 104640-6000 1046406000
104640-6000 FUEL-INJECTION PUMP
Rating:
23
Buy FUEL-INJECTION PUMP 104640-6000 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104740-6000 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104640-6000 
104640-6001 
9 461 616 063 
   
FUEL-INJECTION PUMP
* Q




Information:

start by:a) remove oil pan1. Turn the crankshaft until two pistons are at bottom center. Remove connecting rod caps (1) from the two connecting rods. Remove the lower half of the bearings from the caps.2. Push the connecting rods away from the crankshaft and remove the upper half of the bearings.
Be careful not to damage the crankshaft journals. Do not turn the crankshaft while any of the connecting rod caps are removed.
Install the bearings dry when the clearance checks are made. Put clean engine oil on the bearings for final assembly.3. Clean the surfaces where the bearings fit. Install the upper half of the bearing in the connecting rod. Pull the connecting rod slowly on to the crankshaft.4. Install lower half of the bearing in the cap.
When the connecting rod caps are installed, make sure that the numbers on the side of the caps are next to and respective with the number on the side of the connecting rods.
Typical Example5. Check the bearing clearance with Plastigage (A). Put Plastigage (A) on the bearing.6. Put 2P2506 Thread Lubricant on the threads of the rod bolts and seat surfaces of the nuts.
Do not use an impact wrench to tighten the nuts the additional 60 5°.
Do not turn the crankshaft when Plastigage (A) is in position. 7. Put caps (1) in position on the connecting rods and install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb.ft.). Put a mark on each nut and the end of each bolt. Tighten the nuts 60 5° more.8. Remove the cap. Measure the thickness of Plastigage (A). The rod bearing clearance must be 0.053 to 0.140 mm (.0021 to .0055 in.). The maximum permissible clearance is 0.15 mm (.006 in.).9. Put the caps in position on the connecting rods and install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb.ft.). Put a mark on each nut and the end of each bolt. Tighten the nuts 60 5° more.10. Do Steps 1 through 9 again for other bearings. end by:a) install oil pan

Have questions with 104640-6000?





Group cross 104640-6000 ZEXEL

104640-6000  

104640-6001 
9 461 616 063 
 
FUEL-INJECTION PUMP
9 461 617 482 
 
FUEL-INJECTION PUMP
9 461 616 678 
VE4/10F2200R365-2 
 
FUEL-INJECTION PUMP
9 461 620 759 
 
FUEL-INJECTION PUMP
9 461 619 134 
NP-VE4/10F2200RNP1407 
 
FUEL-INJECTION PUMP
9 461 619 335 
NP-VE4/10F2150RNP1455 
 
FUEL-INJECTION PUMP
9 461 617 483 
VE4/10F2200R365-4 
 
FUEL-INJECTION PUMP
9 461 617 484 
VE4/10F2200R365-5 
 
FUEL-INJECTION PUMP
9 461 617 485 
VE4/10F2250R554-1 
 
FUEL-INJECTION PUMP
9 461 617 486 
 
FUEL-INJECTION PUMP
9 461 626 165 
VE4/10F2200R365-3 
 
FUEL-INJECTION PUMP
9 461 617 487 
 
FUEL-INJECTION PUMP
9 461 617 488 
 
FUEL-INJECTION PUMP
9 461 616 064 
VE4/10F2250R554-2 
 
FUEL-INJECTION PUMP
9 461 617 489 
 
FUEL-INJECTION PUMP
9 461 617 490 
 
FUEL-INJECTION PUMP
9 461 616 065 
VE4/10F2250R554-3 
 
FUEL-INJECTION PUMP
Back to top