104640-3951 ZEXEL 9 461 615 081 BOSCH FUEL-INJECTION PUMP 9461615081 1046403951


 

Information fuel-injection pump

BOSCH 9 461 615 081 9461615081
ZEXEL 104640-3951 1046403951
104640-3951 FUEL-INJECTION PUMP
Rating:
35
Buy FUEL-INJECTION PUMP 104640-3951 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104740-3951 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104640-3951 
9 461 615 081 
NP-VE4/10F2100RNP462 
   
FUEL-INJECTION PUMP
Q




Information:


CRANKSHAFT
1. Bolts and washers (ten each). 2. Main bearing caps (five). 3. Crankshaft.2. Remove the main bearing caps (2) and lower halves of crankshaft main bearings.3. Attach a hoist and sling to the crankshaft (3). Remove the crankshaft, the weight is approx. 102 lbs. (46.3 kg).
REMOVING CRANKSHAFT4. Remove the upper halves of crankshaft main bearings.Install Crankshaft
1. Install the upper halves of main bearings. Lubricate the upper halves with clean engine oil (SAE 30).2. Attach a hoist and sling to the crankshaft. Position crankshaft in cylinder block. If camshaft is in the cylinder block, align timing mark on crankshaft gear with timing mark on camshaft gear.3. Lubricate lower halves of main bearings with clean engine oil (SAE 30). Install main bearing caps so number on cap corresponds with number on saddle of cylinder block. Both numbers must be on same side of cylinder block.4. Put engine oil on the threads of the bolts and the face of the washers and install the bolts into the cylinder block.
Do not rotate the crankshaft until all main bearing cap bolts have been tightened.
5. For 1140 (36B1-36B1923), 1145 (97B1-97B6154), 1150 (96B1-96B6580), 1160 (95B1-95B13691) Engines, tighten the bolts for the main bearing caps in the number sequence shown to a first torque of 60 15 lb. ft. (8.3 2.1 mkg). Tighten all bolts in the number sequence shown (hand torque only) to a last torque of 175 10 lb. ft. (24.2 1.4 mkg).6. For 1140 (36B1924-Up), 1145 (97B6155-Up), 1150 (96B6581-Up), 1160 (95B13692-Up) Engines, tighten the bolts for the main bearing caps in the number sequence shown to a first torque of 30 3 lb. ft. (4.1 0.4 mkg). Put a mark on each bolt and cap and tighten, in the number sequence shown, an added 120° 5° from the mark.
BOLT TIGHTENING SEQUENCE7. Check crankshaft end play. End play with new bearings should be .006 .003 in. (0.15 0.08 mm). Maximum allowable end play is .012 in. (0.30 mm).

Have questions with 104640-3951?





Group cross 104640-3951 ZEXEL

9 461 614 156 
NP-VE4/10F2100RNP823 
 
FUEL-INJECTION PUMP
9 461 622 213 
 
FUEL-INJECTION PUMP
9 461 625 020 
NP-VE4/10F2100RNP863 
 
FUEL-INJECTION PUMP
9 461 622 214 
NP-VE4/10F2100RNP731 
 
FUEL-INJECTION PUMP
9 461 614 307 
 
FUEL-INJECTION PUMP
104640-3951  
9 461 615 081 
NP-VE4/10F2100RNP462 
 
FUEL-INJECTION PUMP
9 461 614 308 
 
FUEL-INJECTION PUMP
9 461 614 309 
 
FUEL-INJECTION PUMP
9 461 616 061 
 
FUEL-INJECTION PUMP
9 461 615 083 
NP-VE4/10F2100RNP460 
 
FUEL-INJECTION PUMP
9 461 614 157 
 
FUEL-INJECTION PUMP
9 461 616 062 
NP-VE4/10F2100RNP824 
 
FUEL-INJECTION PUMP
Back to top