104640-3200 ZEXEL 9 461 610 637 BOSCH FUEL-INJECTION PUMP 9461610637 1046403200


 

Information fuel-injection pump

BOSCH 9 461 610 637 9461610637
ZEXEL 104640-3200 1046403200
104640-3200 FUEL-INJECTION PUMP
Rating:
60
Buy FUEL-INJECTION PUMP 104640-3200 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104740-3410 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104640-3200 
9 461 610 637 
NP-VE4/10F2100RNP178 
   
FUEL-INJECTION PUMP
Q




Information:

1. Make a setting of the fuel injection pump timing. See REMOVE FUEL INJECTION PUMP HOUSING AND GOVERNOR for timing procedure. Tools (A) and (B) will be needed to make a setting of the timing. 2. Remove nuts (1). Remove cover (2) from the timing gear cover. Earlier automatic timing advances had only one bolt. 3. Remove bolts (3) and washer (4). Remove automatic timing advance (5).Install Automatic Timing Advance
1. Put automatic timing advance (1) in position on the drive shaft for the fuel injection pump. On earlier engines, tighten the one bolt to 15 lb. ft. (20 N m). Remove tool (A) and tighten the one bolt to a last torque of 110 10 lb. ft. (149 14 N m). 2. Install washer (2) and bolts (3). Tighten bolts (3) in the following sequence: a) Tighten bolts (3) to a torque of 25 lb. ft. (35 N m).b) Remove tool (A).c) Tighten bolts (3) to a torque of 50 lb. ft. (70 N m).d) Tighten bolts (3) to a torque of: Unit with flat retainer ... 80 5 lb. ft.(110 7 N m)Unit with step retainer ... 100 5 lb. ft.(135 7 N m)
Do not tighten the bolts to final torque until tool (A) is removed.
3. Remove the timing bolt from the flywheel.4. Turn the crankshaft two complete revolutions and check the timing to see that the timing is correct.5. Remove the timing bolt from the flywheel. Remove tool (A) and install the plug in the fuel injection pump housing. 6. Install cover (4) and the nuts that hold the cover to the timing gear cover. Disassemble Automatic Timing Advance
start by:a) remove automatic timing advance 1. Remove ring (2) and gear (1) from flange. 2. Remove springs (3) and counterweights (4) from flange.3. Remove slides from dowels on the flange.Assemble Automatic Timing Advance
1. Install slides (1) on to dowels.2. Install the counterweights (2) on the flange. 3. Install the springs (3).4. Install the gear on flange.5. Install the ring that holds gear and flange together. end by: a) install automatic timing advance

Have questions with 104640-3200?





Group cross 104640-3200 ZEXEL

104640-3200  
9 461 610 637 
NP-VE4/10F2100RNP178 
 
FUEL-INJECTION PUMP
9 461 611 053 
NP-VE4/10F2100RNP169 
 
FUEL-INJECTION PUMP
9 461 622 202 
NP-VE4/10F2100RNP231 
 
FUEL-INJECTION PUMP
9 461 611 613 
NP-VE4/10F2100RNP194 
 
FUEL-INJECTION PUMP
9 461 611 614 
NP-VE4/10F2100RNP256 
 
FUEL-INJECTION PUMP
9 461 614 845 
NP-VE4/10F2100RNP257 
 
FUEL-INJECTION PUMP
9 461 610 003 
 
FUEL-INJECTION PUMP
9 461 610 638 
NP-VE4/10F2100RNP258 
 
FUEL-INJECTION PUMP
9 461 610 639 
NP-VE4/10F2100RNP264 
 
FUEL-INJECTION PUMP
9 461 610 640 
 
FUEL-INJECTION PUMP
Back to top