104640-2302 ZEXEL 9 461 622 562 BOSCH FUEL-INJECTION PUMP 9461622562 1046402302


 

Information fuel-injection pump

BOSCH 9 461 622 562 9461622562
ZEXEL 104640-2302 1046402302
104640-2302 FUEL-INJECTION PUMP
Rating:
48
Buy FUEL-INJECTION PUMP 104640-2302 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104740-2303 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104640-2302 
9 461 622 562 
   
FUEL-INJECTION PUMP
* Q




Information:

start by:a) remove pistons1. Remove the bearings from the connecting rod and connecting rod cap. 2. Remove retainer ring (1) with tool (C).3. Remove pin (2) and the connecting rod (4) from the piston (3). 4. Remove the piston rings from the piston with tool (A). Clean the piston ring grooves on the pistons with an acceptable ring groove cleaning tool. See USE OF PISTON PIN BEARING REMOVAL AND INSTALLATION TOOLS, SPECIAL INSTRUCTION, Form No. SMHS7295.5. Heat the connecting rod in an oven to a temperature of 350°-500°F (177°-260°C). Never use a direct flame to heat a connecting rod. 6. Put connecting rod (4) in position on the base plate of tooling (B). Put a new rod pin bearing (5) on the adapter part of tooling (B). Make sure that the joint in the rod pin bearing is 90° from a center line through the crankshaft and pin bearing bores. 7. Install the pusher adapter (7) and pusher (8) part of tooling (B) on the adapter. The old bearing is pushed out by tooling (B) as the new bearing is installed.8. Use tooling (B) to push the new bearing into the connecting rod until the push adapter of tooling (B) makes full contact with the connecting rod surface.9. Use a pin boring machine to make the rod pin bearing the correct size. The bore in the new rod pin bearing must be 2.0012 .0003 in. (50.830 0.008 mm).10. Check the clearance between the ends of the piston rings. See PISTONS AND RINGS in SPECIFICATIONS.11. Install the oil ring spring in the oil ring groove of the piston. The oil ring is to be installed over the spring with the oil ring end gap 180° from the oil ring spring joint. 12. Install the oil ring on the piston with tool (A).13. Install the second (intermediate) piston ring with the side that has the identification "UP-2" toward the top of the piston with tool (A).14. Install the first (top) piston ring with the side that has the identification "UP-1" toward the top of the piston with tool (A). After the installation of all three piston rings, put the piston ring in position so the end gaps are 120° apart. 15. Put piston (3) in position on connecting rod (4). Put clean engine oil on pin (2) and install the pin. Install retainer rings (1) with tool (C). Make sure the retainer rings are in the grooves of the piston.16. Install the bearings in the connecting rod and connecting rod cap.end by:a) install pistons

Have questions with 104640-2302?





Group cross 104640-2302 ZEXEL

9 461 622 561 
 
FUEL-INJECTION PUMP
104640-2302  
9 461 622 562 
 
FUEL-INJECTION PUMP
9 461 622 563 
 
FUEL-INJECTION PUMP
9 461 622 564 
 
FUEL-INJECTION PUMP
9 461 622 565 
 
FUEL-INJECTION PUMP
9 461 619 953 
NP-VE4/10F2500LNP973 
 
FUEL-INJECTION PUMP
9 461 622 566 
 
FUEL-INJECTION PUMP
9 461 622 567 
 
FUEL-INJECTION PUMP
9 461 622 568 
 
FUEL-INJECTION PUMP
9 461 622 569 
 
FUEL-INJECTION PUMP
9 461 622 570 
 
FUEL-INJECTION PUMP
9 461 625 009 
 
FUEL-INJECTION PUMP
9 461 622 571 
 
FUEL-INJECTION PUMP
9 461 622 572 
 
FUEL-INJECTION PUMP
9 461 625 010 
 
FUEL-INJECTION PUMP
9 461 619 954 
NP-VE4/10F2400LNP975 
 
FUEL-INJECTION PUMP
9 461 622 573 
 
FUEL-INJECTION PUMP
9 461 622 574 
 
FUEL-INJECTION PUMP
9 461 622 575 
NP-VE4/10F2500LNP979 
 
FUEL-INJECTION PUMP
9 461 622 576 
 
FUEL-INJECTION PUMP
9 461 616 967 
 
FUEL-INJECTION PUMP
9 461 618 343 
NP-VE4/10F2500LNP980 
 
FUEL-INJECTION PUMP
Back to top