104206-1030 ZEXEL FUEL-INJECTION PUMP Cross 1042061030


 

Information fuel-injection pump

ZEXEL 104206-1030 1042061030
104206-1030 FUEL-INJECTION PUMP
Rating:
73
Buy FUEL-INJECTION PUMP 104206-1030 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
104206-1030 
 
   
FUEL-INJECTION PUMP




Information:

Start By:a. remove valve covers 1. Remove bolts (1) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (2). 2. Use tool (A) to loosen fuel injection line (3) from fuel injection nozzle (4). 3. Use tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (3). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (5) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (6). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (7). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (8) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies And Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (8) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb.) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20° to 30° (1/3 to 1/2 of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position, and tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.). Install original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (7). 4. Put rocker shaft assemblies (6) in position on the cylinder head assembly.5. Put clean engine oil on the threads of bolts (5) that hold the shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb.ft.). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb.ft.). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb.ft.).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (3). Tighten the fuel injection line adapter nuts (9) to a torque of 40 7 N m (30 5 lb.ft.) with tool (B).7. Tighten fuel injection line nut (10) to a torque of 40 7 N m (30 5 lb.ft.) with tool (A).8. Make adjustments to the valves until the intake valve clearance is 0.38 mm (.015 in.) and the exhaust valve clearance is 0.76 mm (.030 in.). See Valve Clearance Setting in Testing And Adjusting. Tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.) and

Have questions with 104206-1030?





Group cross 104206-1030 ZEXEL

 
 

Fuji-Heavy 

 
2436310200 
FUEL-INJECTION PUMP
 
 

104206-1030  
 
 
FUEL-INJECTION PUMP

Fuji-Heavy 

9 410 617 085 
NP-PFR1MD55/2NP4 
2436310120 
FUEL-INJECTION PUMP
9 410 618 115 
NP-PFR1MD55/2NP4 
2436310130 
FUEL-INJECTION PUMP
 
 
FUEL-INJECTION PUMP

Fuji-Heavy 

9 410 617 185 
NP-PFR1MD55/2NP5 
2556310200 
FUEL-INJECTION PUMP
9 410 618 116 
NP-PFR1MD55/2NP5 
2556310210 
FUEL-INJECTION PUMP
9 410 617 117 
NP-PFR1MD55/2NP6 
2556310300 
FUEL-INJECTION PUMP
9 410 618 117 
NP-PFR1MD55/2NP6 
2556310310 
FUEL-INJECTION PUMP
Back to top