Information fuel-injection pump
BOSCH
9 410 618 180
9410618180
ZEXEL
104190-0260
1041900260
M.BISHI.HI.YOKO
B11200000537
b11200000537
Rating:
Include in #1:
101401-1841
as _
Cross reference number
Zexel num
Bosch num
Firm num
Name
104190-0260
9 410 618 180
B11200000537 M.BISHI.HI.YOKO
FUEL-INJECTION PUMP
K 24MD FUEL INJECTION PUMP PF-MAN 52/55A PF
K 24MD FUEL INJECTION PUMP PF-MAN 52/55A PF
Information:
USE FUEL CONSUMPTION, SERVICE HOURS OR TIME INTERVAL, WHICHEVER OCCURS FIRST. Performance of all lubrication and maintenance items in the Maintenance Schedule is the owners' responsibility.Daily
Walk-Around Inspection - Inspect for leaks and loose connections Engine Crankcase - Check oil level Cooling System - Check coolant level Air Cleaner Indicator - Test Air Starting Motor (If Equipped) - Check/fill oiler bowlEvery 18 950 L (5000 gal) of Fuel or 125 Hours*
Scheduled Oil Sampling (S O S) Analysis - Obtain sample Engine Oil & Filters - Change oil and oil filter(s) Fuel System - Drain water/sediment Cooling System - Test Crankcase Breathers - Clean Engine Valve Lash (At First Oil Change Only) - Check/AdjustEvery 37 900 L (10,000 gal) of Fuel or 250 Hours*
Batteries - Clean/Check electrolyte level Belts, Hoses and Clamps - Inspect/Replace if necessary Engine Air Cleaners - Replace Engine Speed Sensors - Inspect/clean magnetic pick-upEvery 151 600 L (40,000 gal) of Fuel or 1000 Hours*
Engine Protection Devices - Inspect for proper operation (Check at least twice per year) Engine Valve Lash - Check/Adjust Turbochargers - Inspect for proper operation Engine Mounts and Crankshaft Vibration Damper - Inspect/checkEvery 341 100 L (90,000 gal) of Fuel or 2250 Hours*
Connecting Rod Bearings - ReplaceEvery 454 800 L (120,000 gal) of Fuel or 3000 Hours or Two Years*
Cooling System - Clean/Flush/replace thermostats and gasketsOverhaul Every 511 650 L (135,000 gal) of Fuel or 5400 Hours*
To minimize downtime and provide you with the lowest cost and highest value, Caterpillar recommends that the engine be overhauled before failure by scheduling an overhaul with your Caterpillar dealer. Refer to the Overhaul section in this manual on page 85. Top End Overhaul After Failure Overhaul Starting Motor - Inspect for proper operation Alternator - Inspect for proper operation Engine Speed Sensors - Inspect/clean/test*First Perform Previous Service Hour Items Caterpillar suggests that fuel consumption be used as the preferred method of determining maintenance intervals. Fuel consumption/hours will vary depending on the proper application of your engine rating and adherence to recommended maintenance procedures.
Walk-Around Inspection - Inspect for leaks and loose connections Engine Crankcase - Check oil level Cooling System - Check coolant level Air Cleaner Indicator - Test Air Starting Motor (If Equipped) - Check/fill oiler bowlEvery 18 950 L (5000 gal) of Fuel or 125 Hours*
Scheduled Oil Sampling (S O S) Analysis - Obtain sample Engine Oil & Filters - Change oil and oil filter(s) Fuel System - Drain water/sediment Cooling System - Test Crankcase Breathers - Clean Engine Valve Lash (At First Oil Change Only) - Check/AdjustEvery 37 900 L (10,000 gal) of Fuel or 250 Hours*
Batteries - Clean/Check electrolyte level Belts, Hoses and Clamps - Inspect/Replace if necessary Engine Air Cleaners - Replace Engine Speed Sensors - Inspect/clean magnetic pick-upEvery 151 600 L (40,000 gal) of Fuel or 1000 Hours*
Engine Protection Devices - Inspect for proper operation (Check at least twice per year) Engine Valve Lash - Check/Adjust Turbochargers - Inspect for proper operation Engine Mounts and Crankshaft Vibration Damper - Inspect/checkEvery 341 100 L (90,000 gal) of Fuel or 2250 Hours*
Connecting Rod Bearings - ReplaceEvery 454 800 L (120,000 gal) of Fuel or 3000 Hours or Two Years*
Cooling System - Clean/Flush/replace thermostats and gasketsOverhaul Every 511 650 L (135,000 gal) of Fuel or 5400 Hours*
To minimize downtime and provide you with the lowest cost and highest value, Caterpillar recommends that the engine be overhauled before failure by scheduling an overhaul with your Caterpillar dealer. Refer to the Overhaul section in this manual on page 85. Top End Overhaul After Failure Overhaul Starting Motor - Inspect for proper operation Alternator - Inspect for proper operation Engine Speed Sensors - Inspect/clean/test*First Perform Previous Service Hour Items Caterpillar suggests that fuel consumption be used as the preferred method of determining maintenance intervals. Fuel consumption/hours will vary depending on the proper application of your engine rating and adherence to recommended maintenance procedures.
Have questions with 104190-0260?
Group cross 104190-0260 ZEXEL
Kawasaki-Heavy
M.Bishi.Hi.Yoko
104190-0260
9 410 618 180
B11200000537
FUEL-INJECTION PUMP