104190-0250 ZEXEL FUEL-INJECTION PUMP Cross 1041900250 sa0fb016a


 

Information fuel-injection pump

ZEXEL 104190-0250 1041900250
KAWASAKI-HEAVY SA0FB016A sa0fb016a
104190-0250 FUEL-INJECTION PUMP
Rating:
70
Buy FUEL-INJECTION PUMP 104190-0250 zexel genuine, new aftermarket engine parts with delivery

Components :

0. INJECTION-PUMP ASSEMBLY 104190-0250
1. _
2. FUEL INJECTION PUMP
3. NUMBER PLATE
4. _
5. CAPSULE
6. ADJUSTING DEVICE
7. NOZZLE AND HOLDER ASSY
8. Nozzle and Holder
9. Open Pre:MPa(Kqf/cm2)
10. NOZZLE-HOLDER
11. NOZZLE

Scheme ###:

1. [1] 141053-6120 PUMP HOUSING
5. [1] 141154-6920 PLUNGER-AND-BARREL ASSY
6. [2] 141133-0900 CAPSULE
6. [2] 141133-0900 CAPSULE
7. [2] 029331-8070 GASKET
7. [2] 029331-8070 GASKET
9. [1] 141482-1300 O-RING
12. [1] 141140-9620 DELIVERY-VALVE ASSEMBLY
17. [1] 141136-6300 FITTING
20. [1] 141482-1400 O-RING
22. [6] 141120-0800 BLEEDER SCREW
50. [1] 141215-4200 COMPRESSION SPRING
51. [1] 141216-3900 SLOTTED WASHER
52. [1] 141217-6100 SLOTTED WASHER
53. [1] 141221-0000 SPACER BUSHING
54. [1] 141222-0100 LOCKING WASHER
55. [1] 029615-0020 LOCKING WASHER
60. [1] 141244-8120 CONTROL RACK
62. [1] 141010-2700 COVER
63. [1] 141011-0700 GASKET
64. [4] 010208-2020 HEX-SOCKET-HEAD CAP SCREW
65. [1] 141482-3400 O-RING
66. [1] 141010-2621 COVER
67. [4] 010208-2020 HEX-SOCKET-HEAD CAP SCREW
77. [1] 141241-4500 CONTROL SLEEVE
81. [1] 141245-4600 POINTER
82. [2] 141246-2700 SHIM
83. [1] 010208-2020 HEX-SOCKET-HEAD CAP SCREW
160. [2] 141263-0800 BLEEDER SCREW
160. [2] 141263-0800 BLEEDER SCREW
161. [2] 141439-2300 UNION NUT
161. [2] 141439-2300 UNION NUT
170. [1] 141283-0400 RACK
171. [1] 141283-0300 RACK
172. [1] 013021-0020 UNION NUT
173. [1] 141231-0200 SLIDING PIECE
174. [1] 010206-2520 HEX-SOCKET-HEAD CAP SCREW
180. [1] 141405-1800 CAPSULE
204. [1] 141489-0300 GASKET
205/1. [1] 141488-4300 SPACER BUSHING T3.11
205/1. [1] 141488-4400 SPACER BUSHING T3.21
205/1. [1] 141488-4500 SPACER BUSHING T3.31
205/1. [1] 141488-4600 SPACER BUSHING T3.41
205/1. [1] 141488-4700 SPACER BUSHING T3.51
205/1. [1] 141488-4800 SPACER BUSHING T3.61
205/1. [1] 141488-4900 SPACER BUSHING T3.71
205/1. [1] 141488-5000 SPACER BUSHING T3.81
206. [2] 010206-1420 HEX-SOCKET-HEAD CAP SCREW
207. [1] 141482-0000 O-RING
209. [4] 141418-0000 BLEEDER SCREW

Include in #1:

Include in #2:

104190-0250 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
104190-0250 
 
SA0FB016A  KAWASAKI-HEAVY
FUEL-INJECTION PUMP
A K




Information:

USE FUEL CONSUMPTION, SERVICE HOURS OR TIME INTERVAL, WHICHEVER COMES FIRST. Performance of all lubrication and maintenance items in the Maintenance Schedule is the owners' responsibility.Daily
Walk-Around Inspection - Inspect for leaks and loose connections Engine Crankcase - Check oil level Cooling System - Check coolant level Air Cleaner Indicator - Test Air Starting Motor (If Equipped) - Check/fill oiler bowlEvery 11 845 L (3125 gal) of Fuel or 125 Hours*
Scheduled Oil Sampling (S O S) Analysis - Obtain sample Engine Oil & Filters - Change oil and oil filter(s) 1 Fuel System - Drain water/sediment Cooling System - Test Crankcase Breathers - Clean Engine Valve Lash (At First Oil Change Only) - Check/AdjustEvery 23 690 L (6250 gal) of Fuel or 250 Hours*
Batteries - Clean/Check electrolyte level Belts, Hoses and Clamps - Inspect/Replace if necessary Engine Air Cleaners - Replace Engine Speed Sensors - Inspect/clean magnetic pick-upEvery 94 750 L (25,000 gal) of Fuel or 1000 Hours*
Engine Protection Devices - Inspect for proper operation (Check at least twice per year) Engine Valve Lash - Check/Adjust Turbochargers - Inspect for proper operation Engine Mounts and Crankshaft Vibration Damper - Inspect/checkEvery 213 190 L (56,250 gal) of Fuel or 2250 Hours or Every Year*
Connecting Rod Bearings - Replace 2Every 284 250 L (75,000 gal) of Fuel or 3000 Hours or Two Years*
Cooling System - Clean/Flush/replace thermostats and gasketsOverhaul Every 511 650 L (135,000 gal) of Fuel or 5400 Hours*
To minimize downtime and provide you with the lowest cost and highest value, Caterpillar recommends that the engine be overhauled before failure by scheduling an overhaul with your Caterpillar dealer. Refer to the Overhaul section in this manual on page 85. Top End Overhaul After Failure Overhaul Starting Motor - Inspect for proper operation Alternator - Inspect for proper operation Engine Speed Sensors - Inspect/clean/test*First Perform Previous Service Hour Items1For ratings less than 630 hp and a 70 percent load factor approximately one half of the operating time, the oil change interval may be extended to every 250 hours.2For ratings less than 630 hp and a 70 percent load factor approximately one half of the operating time, replacing the connecting rod bearings may be extended to every 4500 hours. Caterpillar suggests that fuel consumption be used as the preferred method of determining maintenance intervals. Fuel consumption/hours will vary depending on the proper application of your engine rating and adherence to recommended maintenance procedures.

Have questions with 104190-0250?





Group cross 104190-0250 ZEXEL

 
 

 
 

9 410 618 395 
 
FUEL-INJECTION PUMP
9 410 618 396 
 
FUEL-INJECTION PUMP
 
 

Kawasaki-Heavy 

104190-0250  
 
SA0FB016A 
FUEL-INJECTION PUMP

M.Bishi.Hi.Yoko 

9 410 618 180 
B11200000537 
FUEL-INJECTION PUMP
 
 

 
 

M.Bishi.Hi.Yoko 

9 410 618 181 
D502304 
FUEL-INJECTION PUMP
 
 
FUEL-INJECTION PUMP
9 410 618 336 
 
FUEL-INJECTION PUMP
Back to top