104188-3010 ZEXEL 9 410 617 403 BOSCH FUEL-INJECTION PUMP 9410617403 1041883010


 

Information fuel-injection pump

BOSCH 9 410 617 403 9410617403
ZEXEL 104188-3010 1041883010
104188-3010 FUEL-INJECTION PUMP
Rating:
46
Buy FUEL-INJECTION PUMP 104188-3010 zexel genuine, new aftermarket engine parts with delivery

Components :

0. INJECTION-PUMP ASSEMBLY 104188-3010
1. _
2. FUEL INJECTION PUMP
3. NUMBER PLATE
4. _
5. CAPSULE
6. ADJUSTING DEVICE
7. NOZZLE AND HOLDER ASSY 105196-5140
8. Nozzle and Holder
9. Open Pre:MPa(Kqf/cm2) 30.4{310}
10. NOZZLE-HOLDER 105096-9030
11. NOZZLE 105016-6550

Scheme ###:

5. [1] 141174-3420 PLUNGER-AND-BARREL ASSY
7. [2] 141133-8000 CAPSULE
7. [2] 141133-8000 CAPSULE
8. [2] 141485-3900 O-RING
8. [2] 141485-3900 O-RING
9. [4] 141285-1100 BACKUP RING
9. [4] 141285-1100 BACKUP RING
10. [12] 014111-2440 LOCKING WASHER D21.5&12.2T3
10. [12] 014111-2440 LOCKING WASHER D21.5&12.2T3
11. [12] 141269-0900 HEX-SOCKET-HEAD CAP SCREW
11. [12] 141269-0900 HEX-SOCKET-HEAD CAP SCREW
12. [1] 141145-2420 DELIVERY-VALVE ASSEMBLY
20. [1] 141485-3800 O-RING
22. [8] 141124-2900 BLEEDER SCREW
53. [1] 141293-0100 PLUNGER GUIDE
55. [2] 011210-3020 SET OF NUTS
60. [1] 141291-4000 CONTROL RACK
62. [2] 141010-5220 COVER
62. [2] 141010-5220 COVER
64. [8] 020018-3040 BLEEDER SCREW M8P1.25L30
64. [8] 020018-3040 BLEEDER SCREW M8P1.25L30
65. [1] 141291-4100 TIMING RACK
77. [1] 141292-2800 CONTROL SLEEVE
78. [1] 141292-2900 TIMING SLEEVE
79. [1] 141259-0300 SPACER RING
80. [0] 141209-4200 SHIM D167&113T0.8
80B. [0] 141209-4300 SHIM D167&113T0.3
80C. [0] 141209-4400 SHIM D167&113T0.2
81. [1] 141245-5900 POINTER
81A. [1] 141245-3200 POINTER
82/1. [0] 029310-6220 SHIM D11.5&6.5T0.10
82/1. [0] 029310-6230 SHIM D11.5&6.5T0.20
82/1. [0] 029310-6240 SHIM D11.5&6.5T0.25
82/1. [0] 029310-6250 SHIM D11.5&6.5T1.00
82/1. [0] 029310-6370 SHIM D11.5&6.5T0.30
82/1. [0] 029310-6380 SHIM D11.5&6.5T0.40
82/1. [0] 029310-6390 SHIM D11.5&6.5T0.50
82/1. [0] 029310-6400 SHIM D11.5&6.5T0.60
82/1. [0] 029310-6410 SHIM D11.5&6.5T0.70
82/1. [0] 029310-6420 SHIM D11.5&6.5T0.80
82/1. [0] 029310-6430 SHIM D11.5&6.5T0.90
82/1. [0] 139406-0500 SHIM D11.5&6.5T1.5
82/1. [0] 139406-0500 SHIM D11.5&6.5T1.5
82/1. [0] 139406-0600 SHIM D11.5&6.5T2.0
83. [1] 020006-1440 BLEEDER SCREW M6P1L14
83A. [1] 020006-2540 BLEEDER SCREW M6P1L25
160. [2] 141418-3820 SET OF NUTS
160. [2] 141418-3820 SET OF NUTS
161. [2] 150934-1400 GASKET
161. [2] 150934-1400 GASKET
178. [4] 141269-1100 HEX-SOCKET-HEAD CAP SCREW
178. [4] 141269-1100 HEX-SOCKET-HEAD CAP SCREW
179. [4] 014111-0440 LOCKING WASHER
179. [4] 014111-0440 LOCKING WASHER
180. [2] 141423-0100 GUIDE PIN
180. [2] 141423-0100 GUIDE PIN
181. [2] 141422-0100 SLIDING BLOCK
181. [2] 141422-0100 SLIDING BLOCK
182. [2] 141485-4000 O-RING
182. [2] 141485-4000 O-RING
185. [1] 141458-0400 ADAPTOR
186. [1] 016500-2050 O-RING
190. [2] 141406-1600 GASKET
190. [2] 141406-1600 GASKET

Include in #2:

104188-3010 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
104188-3010 
104188-3002 
9 410 617 403 
   
FUEL-INJECTION PUMP
* K




Information:

Replace:
Thrust, Main and Rod Bearings, Valve Rotators, Thermostat and Throttle Position SensorIn most probability, these components will not last until the second overhaul. Therefore, Caterpillar recommends the installation of these components new at each overhaul period.Inspect:
Crankshaft, Camshaft, Camshaft Followers, Vibration Damper, Spacer Block, Oil Pump and Fuel Transfer PumpThe ideal time for inspecting your crankshaft, camshaft and vibration damper is while the engine is disassembled for overhaul. Inspect each component for potential damage as follows:Crankshaft - Inspect for bend, journal damage and bearing material seized to the journal. At the same time, check the taper and profile of the crankshaft journals by interpreting your main and rod bearing wear patterns. In case of an out-of-frame overhaul, use the magnetic particle inspection process to check the crankshaft for cracks.* Camshaft - Inspect the camshaft for journal damage. In case of an out-of-frame overhaul, use the magnetic particle inspection process to check the camshaft for cracks.* Camshaft Followers - For out-of-frame overhaul, inspect the cam bearing for fatigue and wear.* Vibration Damper - Inspect the damper for rubber deterioration and movement of the outer ring relative to the inner hub.* Spacer Block - Inspect the spacer block for excessive wear or warping. For additional information regarding these components, contact your local Caterpillar dealer for assistance.Test:
Electronic Unit Injectors For additional information regarding this component, contact your local Caterpillar dealer for assistance.Clean/Test:
Oil Cooler Core and Aftercooler CoreCaterpillar recommends that the oil cooler core and the air-to-air aftercooler core be cleaned and pressure tested at each overhaul. For additional specifications and/or pressure test information, contact your local Caterpillar dealer.Cleaning Procedure for Air-to-Air Aftercooler
Caterpillar recommends that the air-to-air aftercooler core be removed, cleaned, and tested at overhaul time, if a turbocharger failure has occurred, or if at any time the turbocharger develops an oil leak.To clean the air-to-air aftercooler system:1. Remove the air-to-air aftercooler core. Turn the core upside down to remove debris from the inlet tank.
Do not use caustic cleaners to clean the air-to-air aftercooler core. Caustic cleaners will attack the internal metals of the core and cause leakage.
2. Back flush internally with a solvent to loosen foreign substances and to remove oil.Caterpillar recommends the use of Caterpillar Hydrosolv 4165 or Hydrosolv 100 Liquid Cleaners. For more information see "General Instructions and Application Guide" Form LEHQ6101 or contact your Caterpillar dealer.3. Shake the core vigorously to eliminate any trapped debris.4. Wash the core with hot, soapy water. Rinse thoroughly with clean water.
The maximum air pressure must not be above 30 psi (205 kPa) for cleaning purposes.
5. Dry the core with compressed air. Blow air in reverse direction of normal flow. Use all necessary safety equipment while using compressed air.6. Inspect the system to ensure cleanliness and install the air-to-air aftercooler core.Caterpillar Recommendation
The "repair before failure" concept makes sense. It saves money, lowers operating costs and minimizes downtime.As previously illustrated, it is not cheaper to operate the truck until an engine component fails, since failing components may increase fuel costs and upon failure, could

Have questions with 104188-3010?





Group cross 104188-3010 ZEXEL

 
 

 
 

 
 

104188-3010  

104188-3002 
9 410 617 403 
 
FUEL-INJECTION PUMP
9 410 617 404 
 
FUEL-INJECTION PUMP
 
 
FUEL-INJECTION PUMP
Back to top