104183-6111 ZEXEL 9 410 617 672 BOSCH FUEL-INJECTION PUMP 9410617672 1041836111


 

Information fuel-injection pump

BOSCH 9 410 617 672 9410617672
ZEXEL 104183-6111 1041836111
104183-6111 FUEL-INJECTION PUMP
Rating:
8
Buy FUEL-INJECTION PUMP 104183-6111 zexel genuine, new aftermarket engine parts with delivery

Components :

0. INJECTION-PUMP ASSEMBLY 104183-6111
1. _
2. FUEL INJECTION PUMP
3. NUMBER PLATE
4. _
5. CAPSULE
6. ADJUSTING DEVICE
7. NOZZLE AND HOLDER ASSY
8. Nozzle and Holder
9. Open Pre:MPa(Kqf/cm2)
10. NOZZLE-HOLDER
11. NOZZLE

Scheme ###:

5. [1] 141173-9220 PLUNGER-AND-BARREL ASSY
7. [1] 141106-4600 CAPSULE
8. [1] 029333-1010 GASKET
12. [1] 141140-0020 DELIVERY-VALVE ASSEMBLY
13. [1] 141144-0400 COMPRESSION SPRING
17. [1] 141126-9520 FITTING
20. [1] 141118-2800 O-RING
21. [1] 141119-2400 FLANGE BUSHING
22. [6] 141438-1400 STUD
23. [6] 141439-1200 UNION NUT
25. [1] 141485-0600 O-RING
50. [1] 141215-2400 COMPRESSION SPRING
51. [1] 141216-1600 SLOTTED WASHER
52. [1] 141217-1700 SLOTTED WASHER
53. [1] 141218-6420 GUIDE
54. [1] 141219-0800 SPACER RING
55. [1] 141220-1000 LOCKING WASHER
56. [1] 141261-0400 SPACER BUSHING
57. [1] 016110-5210 LOCKING WASHER
60. [1] 141243-9900 CONTROL RACK
77. [1] 141241-5500 CONTROL SLEEVE
81. [1] 141245-3200 POINTER
82/1. [0] 029310-6220 SHIM D11.5&6.5T0.10
82/1. [0] 029310-6230 SHIM D11.5&6.5T0.20
82/1. [0] 029310-6240 SHIM D11.5&6.5T0.25
82/1. [0] 029310-6250 SHIM D11.5&6.5T1.00
82/1. [0] 029310-6370 SHIM D11.5&6.5T0.30
82/1. [0] 029310-6380 SHIM D11.5&6.5T0.40
82/1. [0] 029310-6390 SHIM D11.5&6.5T0.50
82/1. [0] 029310-6400 SHIM D11.5&6.5T0.60
82/1. [0] 029310-6410 SHIM D11.5&6.5T0.70
82/1. [0] 029310-6420 SHIM D11.5&6.5T0.80
82/1. [0] 029310-6430 SHIM D11.5&6.5T0.90
82/1. [0] 139406-0500 SHIM D11.5&6.5T1.5
82/1. [0] 139406-0600 SHIM D11.5&6.5T2.0
83. [1] 020006-1440 BLEEDER SCREW M6P1L14
92. [2] 141401-2100 INLET UNION
92. [2] 141401-2100 INLET UNION
93. [2] 141402-0701 EYE BOLT
93. [2] 141402-0701 EYE BOLT
94. [4] 141403-2200 O-RING
94. [4] 141403-2200 O-RING
94. [4] 141403-2200 O-RING
140. [1] 141106-7600 CAPSULE
141. [1] 029333-3020 GASKET
163. [1] 373658-1400 CAPSULE
164. [1] 141107-0500 GASKET

Include in #2:

104183-6111 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
104183-6111 
9 410 617 672 
NP-PF1HD460A00N25 
   
FUEL-INJECTION PUMP
K 24PA FUEL INJECTION PUMP PF-HD PF




Information:

Stand By:a. remove engineb. remove timing gear coverc. remove flywheel housingd. remove pistons and connecting rods
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Turn the crankshaft until the timing mark (C) on the crankshaft gear (1) is in alignment with the timing mark (C) on camshaft gear (2).2. Make a mark on the teeth of the fuel pump drive gear and the idler gear in their engaged position at location (X). Make a mark on the engaged teeth of idler gear and camshaft gear at location (Y). This will give assistance in the correct timing of the camshaft for the fuel injection pump during crankshaft installation. 3. Fasten a hoist to the crankshaft.4. Remove the caps for the main bearings.5. Remove the crankshaft. Weight of the crankshaft is 95 kg (210 lb.).6. Remove the main bearings from the main bearing caps. Remove the crankshaft main bearings from the cylinder block. 7. Use tool (A) to remove the crankshaft gear and the oil seal wear sleeve.Install Crankshaft
Install the bearings dry when the clearance checks are made. Put clean engine oil on the main bearings for final assembly.
Make sure the upper and lower halves of the main bearings are installed so the bearing tabs fit into the notch in the cylinder block and main bearing caps.
1. Clean the bearing surfaces in the cylinder block. Install the upper halves of the main bearings in the block.2. Heat the crankshaft gear to a maximum temperature of 315° C (600° F). Install the gear on the crankshaft. Fasten a hoist to the crankshaft and put the crankshaft in position in the cylinder block with all timing marks in alignment.3. Clean the bearing surfaces of the main bearing caps. Install the lower halves of the main bearings in the caps. When the bearing clearance is checked and the engine is in a vertical position, such as in the vehicle, the crankshaft will have to be lifted up and held against the upper halves of the main bearings to get a correct measurement with the Plastigage. The Plastigage will not hold the weight of the crankshaft and give a correct indication. If the engine is in a horizontal position, it is not necessary to hold the crankshaft up. Do not turn the crankshaft when the Plastigage is in position to check clearances. 4. Check the main bearing clearances with Plastigage (B) as follows:a. Put a piece of Plastigage (B) in position as shown.
Make sure the part number on the main bearing cap is toward the front of the engine and the number on the main bearing cap is the same as the number on the cylinder block on the left side of each main bearing cap.
Do not turn the crankshaft when Plastigage (B) is in position.b. Install the main bearing caps. Put 2P2506 Thread Lubricant on the bolt threads and the face of the washers and install the bolts. Tighten the bolts to a

Have questions with 104183-6111?





Group cross 104183-6111 ZEXEL

 
 

104183-6111  
9 410 617 672 
NP-PF1HD460A00N25 
 
FUEL-INJECTION PUMP
Back to top