101061-8310 ZEXEL FUEL-INJECTION PUMP Cross 1010618310 me727224


 

Information fuel-injection pump

ZEXEL 101061-8310 1010618310
MITSUBISHI ME727224 me727224
101061-8310 FUEL-INJECTION PUMP
Rating:
83
Buy FUEL-INJECTION PUMP 101061-8310 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101061-8310 
 
ME727224  MITSUBISHI
FUEL-INJECTION PUMP
* Q




Information:

2. Turn the crankshaft until two pistons are at bottom center.3. Remove nuts (1) and the bearing caps. Push the rods and pistons up until the rings are out of the cylinder liners. 4. Remove pistons (2) and connecting rods from the cylinder liners.5. Do Steps 1 through 4 for the remainder of the pistons and connecting rods.Install Pistons And Connecting Rod Assemblies
1. Put clean engine oil on piston rings, connecting rod bearings and cylinder liners. 2. Use tool (A), and install piston (2) and the connecting rod in the cylinder liner. Be sure the number on the tab groove side of the connecting rod is on the opposite side from the camshaft.3. Install the bearing cap on the connecting rod with the number on the side of the bearing cap on the same side and same number as on the connecting rod.4a. For connecting rods with bolts and nuts, use the following torque procedure: Apply clean engine oil to the bolt threads, nuts, and seating faces of the bearing cap. Tighten each nut to a torque of 80 5 N m (60 4 lb.ft.). Tighten each nut an additional 120° 5°.4b. For connecting rods with only bolts, use the following torque procedure: Apply Molylube to the threads of the bolts and to the seating faces of the bearing cap and the bolt. Tighten each bolt to a torque of 90 8 N m (66 6 lb.ft.). Tighten each bolt an additional 90° 5°.5. Do Steps 1 through 4 for the remainder of the pistons and connecting rods.End By:a. install oil pumpb. install cylinder head assembly.Disassemble And Assemble Pistons And Connecting Rod Assemblies
Start By:a. remove pistons and connecting rod assemblies 1. Remove bearings (3) from the connecting rod and connecting rod cap.2. Remove retainer ring (1) and tool (A).3. Remove pin (2) and connecting rod (4) from the piston. 4. Remove piston rings (5) from the piston with tool (B). Clean the piston ring grooves on the pistons with an acceptable ring groove cleaning tool. See, Use Of Piston Pin Bearing Removal And Installation Tools, Special Instructions, Form No. SMHS7295.5. Heat connecting rod (4) in an oven to a temperature of 177° to 260° C (350° to 500° F). Never use a direct flame to heat a connecting rod. 6. Put connecting rod (4) in position on the base plate of tooling (C). Put a new rod pin bearing (6) on the adapter part of tooling (C). The old bearing is pushed out by tooling (C) as the new bearing is installed.7. Use tooling (C) to push the new bearing into the connecting rod until the push adapter of tooling (C) makes full contact with the connecting rod surface.8. Use a pin boring machine to make the rod pin bearing the correct size. The bore in the new rod pin bearing must be 50.830 0.008 mm (2.0012 .0003 in.).9. Check the clearance between the ends of the piston rings. See

Have questions with 101061-8310?





Group cross 101061-8310 ZEXEL

Isuzu 

9 410 611 410 
NP-PES6A95C410RS2000 
1156011420 
FUEL-INJECTION PUMP

Mitsubishi 

101061-8310  
 
ME727224 
FUEL-INJECTION PUMP

Isuzu 

9 410 610 792 
NP-PES6A95C410RS2000 
1156102890 
FUEL-INJECTION PUMP
9 410 610 792 
NP-PES6A95C410RS2000 
1156111320 
FUEL-INJECTION PUMP

Mitsubishi 

9 410 612 178 
NP-PES6AD105B412L 
ME727216 
FUEL-INJECTION PUMP
9 410 614 148 
NP-PES6AD105B412L 
ME727217 
FUEL-INJECTION PUMP
9 410 611 221 
NP-PES6AD105B412L 
ME727229 
FUEL-INJECTION PUMP
 
ME727248 
FUEL-INJECTION PUMP
9 410 611 691 
 
FUEL-INJECTION PUMP
9 410 610 569 
NP-PES6AD100B410R 
 
FUEL-INJECTION PUMP

Mitsubishi 

9 410 612 308 
ME727994 
FUEL-INJECTION PUMP
9 410 610 340 
NP-PES6AD105B412L 
ME730375 
FUEL-INJECTION PUMP
Back to top