101060-2900 ZEXEL 9 410 611 663 BOSCH FUEL-INJECTION PUMP 9410611663 1010602900 1156102770


 

Information fuel-injection pump

BOSCH 9 410 611 663 9410611663
ZEXEL 101060-2900 1010602900
ISUZU 1156102770 1156102770
101060-2900 FUEL-INJECTION PUMP
Rating:
34
Buy FUEL-INJECTION PUMP 101060-2900 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

1. [1] 131071-4920 PUMP HOUSING
1/30. [3] 029040-6020 STUD
1/35A. [1] 131400-0100 ADAPTOR
1/40. [1] 131423-0800 ADAPTOR
1/40A. [1] 131420-0420 BLEEDER SCREW
1/41A. [1] 026512-1540 GASKET D15.4&12.2T1.50
2. [1] 131028-6020 COVER
2/2. [1] 131011-0800 GASKET
3. [2] 131017-1000 FLAT-HEAD SCREW
5. [2] 029340-6020 GASKET D10&6.5T1.00
16. [6] 131034-1401 CAPSULE
21. [3] 139206-0400 UNION NUT
23. [1] 029633-1010 O-RING
30. [6] 131152-3520 PLUNGER-AND-BARREL ASSY
36. [6] 131110-9420 DELIVERY-VALVE ASSEMBLY
37. [6] 131112-3500 COMPRESSION SPRING
40. [6] 131115-1600 GASKET
41. [6] 131116-5220 FITTING
45. [3] 131122-0520 PLATE
49. [6] 029632-0030 O-RING
55. [6] 131200-2820 TAPPET
55/2. [1] 131203-0800 BEARING PIN
55/3. [1] 131204-1000 ROLLER
55/4. [1] 131205-0500 BUSHING
55/5. [1] 131206-0200 SLIDER
56/1. [0] 029311-0020 SHIM D19&10T0.30
56/1. [0] 029311-0030 SHIM D19&10T0.40
56/1. [0] 029311-0040 SHIM D19&10T0.50
56/1. [0] 029311-0050 SHIM D19&10T0.6
56/1. [0] 029311-0060 SHIM D19&10T0.7
56/1. [0] 029311-0070 SHIM D19&10T0.8
56/1. [0] 029311-0080 SHIM D19&10T0.9
56/1. [0] 029311-0090 SHIM D19&10T1
56/1. [0] 029311-0110 SHIM D19&10T1.1
56/1. [0] 029311-0120 SHIM D19&10T1.2
56/1. [0] 029311-0130 SHIM D19&10T1.3
56/1. [0] 029311-0140 SHIM D19&10T1.4
56/1. [0] 029311-0270 SHIM D19&10T0.55
56/1. [0] 029311-0280 SHIM D19&10T0.65
56/1. [0] 029311-0290 SHIM D19&10T0.75
56/1. [0] 029311-0310 SHIM D19&10T0.85
56/1. [0] 029311-0320 SHIM D19&10T0.95
56/1. [0] 029311-0330 SHIM D19&10T1.05
56/1. [0] 029311-0340 SHIM D19&10T1.15
56/1. [0] 029311-0350 SHIM D19&10T1.25
56/1. [0] 029311-0490 SHIM D19&10T1.5
56/1. [0] 029311-0500 SHIM D19&10T1.6
56/1. [0] 029311-0580 SHIM D19&10T0.2
56/1. [0] 029311-0590 SHIM D19&10T0.25
56/1. [0] 029311-0600 SHIM D19&10T0.35
56/1. [0] 029311-0610 SHIM D19&10T0.45
56/1. [0] 029311-0620 SHIM D19&10T1.35
56/1. [0] 029311-0630 SHIM D19&10T1.45
56/1. [0] 029311-0710 SHIM D19&10T1.55
61. [6] 131215-2300 COMPRESSION SPRING
62. [6] 131216-0100 SLOTTED WASHER
63. [6] 131217-0200 SLOTTED WASHER
67. [1] 131256-0000 CONTROL RACK
68. [1] 131226-0300 FLAT-HEAD SCREW
76. [6] 131240-0100 PINION
77. [6] 131241-0100 CONTROL SLEEVE
78. [6] 131242-0100 FLAT-HEAD SCREW
90. [1] 131371-1900 CAMSHAFT
91A. [1] 016640-2030 BEARING PLATE
91B. [1] 028202-0020 BEARING PLATE
91E. [1] 016630-2030 BEARING PLATE
91F. [1] 028201-7020 BEARING PLATE
92. [1] 131302-1700 SPACER RING
92A. [1] 131302-1300 SPACER RING
93/1. [0] 029311-7010 SHIM D22&17T0.1
93/1. [0] 029311-7020 SHIM D22&17T0.12
93/1. [0] 029311-7030 SHIM D22&17T0.14
93/1. [0] 029311-7040 SHIM D22&17T0.16
93/1. [0] 029311-7050 SHIM D22&17T0.18
93/1. [0] 029311-7060 SHIM D22&17T0.5
93/1. [0] 029311-7070 SHIM D22&17T1.0
93/1. [0] 029311-7090 SHIM D22&17T0.3
93/1. [0] 029311-7210 SHIM D22&17T0.7
93/1. [0] 029311-7220 SHIM D22&17T1.4
93/1. [0] 139417-0000 SHIM D22&17T2.4
93A/1. [0] 029312-0310 SHIM D24&20T0.10
93A/1. [0] 029312-0320 SHIM D24&20T0.12
93A/1. [0] 029312-0330 SHIM D24&20T0.14
93A/1. [0] 029312-0340 SHIM D24&20T0.16
93A/1. [0] 029312-0350 SHIM D24&20T0.18
93A/1. [0] 029312-0360 SHIM D24&20T0.3
93A/1. [0] 029312-0370 SHIM D24&20T0.5
93A/1. [0] 029312-0380 SHIM D24&20T1.0
95. [1] 131306-1000 BEARING SHELL
96. [2] 029050-5010 FLAT-HEAD SCREW M5P0.8L32
97. [2] 026505-0940 GASKET
100A. [1] 029622-0190 PACKING RING
101A. [1] 131316-2000 COVER
104A. [4] 020006-1440 BLEEDER SCREW M6P1L14
106A. [1] 029635-0050 O-RING
112A. [1] 025804-1610 WOODRUFF KEY
117A. [1] 139814-0000 EYE BOLT
118A. [2] 139514-0000 GASKET D19.2&14.2T1.0
152. [1] 139812-0100 EYE BOLT
154. [2] 139512-0000 GASKET D17.2&12.2T1.0
334. [1] 139810-0000 EYE BOLT
336. [2] 139510-0000 GASKET D15.2&10.2T1.0
360A. [1] 131496-0300 POINTER
361A. [2] 029010-6680 BLEEDER SCREW

Cross reference number

Zexel num
Bosch num
Firm num
Name
101060-2900 
9 410 611 663 
NP-PE6A95C412RS2S 
1156102770  ISUZU
FUEL-INJECTION PUMP
Q




Information:

Tachometer Drive
Use a short fiber grease, No. 2 Grade for most temperatures, or No. 0 or No. 1 for extremely low temperatures. Wipe surrounding area with a clean rag before removing plug. Remove plug. Install grease fitting. Apply two strokes of lubricant through the fitting. Remove grease fitting. Replace plug.Governor Control Cross Shaft Bearings (1673)
Engines Before 69D3625)
Use a short fiber grease No. 2 Grade for most temperatures, or No. 0 or No. 1 for extremely low temperatures. Apply 1 stroke of lubricant through fitting at each end of shaft.Valve Adjustment
1673C
Make valve adjustment with engine stopped and cold. Remove the flywheel timing cover and rotate flywheel in direction of engine rotation until "TC 1-6 cyl" mark aligns with timing pointer. Remove valve cover and observe position of valves to determine if No. 1 or No. 6 piston is on compression stroke. Both the inlet and exhaust valves will be closed on compression stroke.1. With No. 1 piston at TDC on compression, check lash on exhaust valves for cylinders 1, 3 and 5, and inlet valves for cylinders 1, 2 and 4.2. To adjust, loosen valve adjusting locknut and turn adjusting screw to allow feeler gauge to pass between top of valve stem and the valve rocker arm.3. Set lash at .015" (0.38 mm) for inlet and .025" (0.63 mm) for exhaust valves.4. Tighten adjusting screw locknut and check lash clearance.5. Turn flywheel 360° in direction of engine rotation. Align flywheel timing mark with pointer. No. 6 cylinder will be at TDC compression stroke (valves closed).6. Check lash on exhaust valves for cylinders 2, 4 and 6, and inlet valves for cylinders 3, 5 and 6. Adjust valves if necessary.1674
Make valve lash adjustment with engine stopped. TDC of the No. 1 piston on the compression stroke is the reference point. The No. 1 piston will be at TDC when the No. 1 and No. 6 flywheel timing mark aligns with the timing pointer. Compression stroke is when all the No. 1 piston valves are closed.1. With No. 1 piston at TDC compression stroke, adjust lash on 1, 3 and 5 exhaust and 1, 2 and 4 inlet valves.2. Turn adjusting screw counterclockwise 2 clicks or more to provide clearance between rocker assembly and valve.3. Turn adjusting screw clockwise to obtain zero lash. There should be no free rocker movement or adjusting screw button lateral movement. The adjusting screw button can still be rotated by finger pressure even when it is in contact with valve stem and clearance is zero. Turning the adjusting screw clockwise beyond this point will force the valve off its seat, and final lash setting will be incorrect.4. To adjust, turn adjustment screw counterclockwise 10 clicks (.020") (0.51 mm) for the exhaust valves and 4 clicks (.008") (0.20 mm) for the inlet valves. (One click is equal to .002") (0.05 mm).5. Turn crankshaft 360° clockwise, (direction of normal rotation) viewing from front. Align flywheel timing mark with timing pointer. a) Adjust 2, 4 and 6 exhaust

Have questions with 101060-2900?





Group cross 101060-2900 ZEXEL

Isuzu 

101060-2900  
9 410 611 663 
NP-PE6A95C412RS2S 
1156102770 
FUEL-INJECTION PUMP
9 410 610 187 
NP-PE6AD100B412R 
 
FUEL-INJECTION PUMP
9 410 613 829 
NP-PE6A95C410RS2000 
 
FUEL-INJECTION PUMP
9 410 614 490 
 
FUEL-INJECTION PUMP
9 410 614 491 
NP-PE6AD100B412R 
 
FUEL-INJECTION PUMP
9 410 614 492 
 
FUEL-INJECTION PUMP

Isuzu 

9 410 611 664 
NP-PE6A95C412RS2000 
1156102490 
FUEL-INJECTION PUMP
Back to top