101060-2110 ZEXEL FUEL-INJECTION PUMP Cross 1010602110 1156100960


 

Information fuel-injection pump

ZEXEL 101060-2110 1010602110
ISUZU 1156100960 1156100960
101060-2110 FUEL-INJECTION PUMP
Rating:
8
Buy FUEL-INJECTION PUMP 101060-2110 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101060-2110 
101060-2631 
 
1156100960  ISUZU
FUEL-INJECTION PUMP
* Q




Information:

1. Install the turbocharger on tool (A) as shown.2. Put alignment marks on three housings of the turbocharger for correct alignment during assembly. Loosen clamp (2), and remove the clamp and housing (1) from housing assembly (3). 3. Loosen clamp (4), and remove housing assembly (3) from housing (5). 4. Put the cartridge group in position in tool (B) as shown.
When the nut is loosened, do not put a side force on the shaft. This can result in a bent shaft.
5. Use a 5S9566 Sliding T-Wrench and a universal socket (6) to remove the nut that holds the compressor wheel to the wheel assembly.6. Remove compressor wheel (7) and the shims from wheel assembly (8).7. Remove housing assembly (3) from wheel assembly (8). 8. Remove ring (9) and backplate (10) from wheel assembly (8). 9. Use tool (C), and remove snap ring (11) from housing assembly (3). 10. Remove insert (12) and sleeve (13) from housing assembly (3). 11. Remove ring (14) from sleeve (13). 12. Remove two screws (15) and deflector (16) from housing assembly (3). 13. Remove ring (18) and bearing assembly (17) from the housing assembly. 14. Remove sleeve (19) and ring (20) from the housing assembly. 15. Remove O-ring seal (23) from the housing assembly.16. Use tool (D), and remove snap ring (22) from the housing assembly.17. Remove bearing (21). Remove the snap ring behind the bearing with tool (D). 18. Use tool (D), and remove snap ring (25) from the housing assembly.19. Remove bearing (24). Remove the snap ring behind the bearing with tool (D).20. Check all the parts of the turbocharger for damage. If the parts are damaged, use new parts for replacement. See Special Instruction, Form No. SMHS6854 for Turbocharger Reconditioning. Also see Guidelines For Reusable Parts, Form No. SEBF8018.Assemble Turbocharger
1. Make sure that all of the oil passages in the turbocharger cartridge housing are clean and free of dirt and foreign material. Do not put oil on any parts of the turbocharger until after the compressor wheel has been installed. After the turbocharger has been assembled, pour clean engine oil into the oil inlet of the turbocharger.
Make sure that the snap rings that hold bearings (24) and (21) in position in housing assembly (3) are installed with the round edge of the outside diameter toward the bearing.
2. Install the snap ring behind bearing (24) with tool (D).3. Install bearing (24) in housing assembly (3).4. Use tool (D), and install snap ring (25) in the housing assembly. 5. Install the snap ring behind bearing (21) with tool (D).6. Install bearing (21) in the housing assembly.7. Use tool (D), and install snap ring (22) in the housing assembly. 8. Put wheel assembly (8) in position on tool (B) as shown.9. Put backplate (10) in position on the wheel assembly. Put 6V2055 High Vacuum Grease in the groove for seal ring (9) at assembly to one half or more of the depth of the groove all the way around.10. Install ring (9) in

Have questions with 101060-2110?





Group cross 101060-2110 ZEXEL

Mitsubishi 

 
ME056125 
FUEL-INJECTION PUMP

Isuzu 

101060-2110  

101060-2631 
 
1156100960 
FUEL-INJECTION PUMP
9 410 610 016 
NP-PE6A95C412RS2000NP728 
5156100290 
FUEL-INJECTION PUMP
9 410 612 722 
NP-PE6A95C412RS2000NP736 
 
FUEL-INJECTION PUMP

Isuzu 

9 410 610 076 
NP-PE6A95C412RS2000NP738 
1156101540 
FUEL-INJECTION PUMP
9 410 610 076 
NP-PE6A95C412RS2000NP738 
1156101930 
FUEL-INJECTION PUMP
9 410 610 762 
NP-PE6A95C410RS2000NP743 
5156100920 
FUEL-INJECTION PUMP
Back to top