101060-2040 ZEXEL FUEL-INJECTION PUMP Cross 1010602040 1156100860


 

Information fuel-injection pump

ZEXEL 101060-2040 1010602040
ISUZU 1156100860 1156100860
101060-2040 FUEL-INJECTION PUMP
Rating:
83
Buy FUEL-INJECTION PUMP 101060-2040 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101060-2040 
101060-4211 
 
1156100860  ISUZU
FUEL-INJECTION PUMP
* Q




Information:

1. Remove nuts (1), cover (2), and the gasket. 2. Put No. 1 piston at the top center compression position (TDC) with the following procedure:a. Remove plug (3), two bolts and cover (2) from the flywheel housing. b. Install tool (B) in the flywheel housing. Use tool (B) to slowly rotate the engine in the direction of normal rotation, (counterclockwise as seen from the flywheel end of the engine), until timing bolt (4) can be installed in the flywheel housing and into the hole in the flywheel. c. Remove the valve cover from the valve cover base. Check to see if both rocker arms (5) for the No. 1 cylinder can be moved backward and forward. The No. 1 piston is at the top center compression position (TDC) when the timing bolt is installed in the flywheel and both rocker arms for the No. 1 cylinder can be moved backward and forward. If both rocker arms cannot be moved, the No. 1 piston is not at the top center compression position (TDC). Remove the timing bolt from the flywheel and rotate the engine in the direction of normal rotation, (counterclockwise as seen from the flywheel end of the engine one full turn 360°, and install the timing bolt again.3. Remove the timing bolt, and use tool (B) to rotate the engine in the opposite direction of normal rotation (clockwise as seen from the flywheel end of the engine) a minimum of 30°. The timing is correct if tool (A) and the timing bolt can be installed at the same time. The timing procedure in the Testing and Adjustment Manual must be done again if the timing bolt and tool (A) can not be installed at the same time.4. Remove the plug from the timing pin hole in the fuel injection pump housing, and install tool (A) in the timing pin hole. 5. Remove eight bolts (6) and automatic timing advance (7). 6. Remove gear (9) from fuel injection pump camshaft (8).The following steps are for the installation procedure.7. Install gear (9) on fuel injection pump camshaft (8). 8. Install two 3/8 in. - 16 NC × 6 in. (152.4 mm) long guide bolts (10). Space the guide bolts evenly.
There is a light spring located beneath the flyweight cover (12). Hold cover (12) while removing last nut (11). Slowly remove flyweight cover (12) to avoid dropping the spring.
9. Remove four nuts (11) and remove flyweight cover (12). 10. Put automatic timing advance (13) in position on the fuel injection pump camshaft, and install four bolts (14). Tighten bolts (14) just past finger tight. Remove guide bolts (15). 11. Install four nuts (16) standard torque. Install tool (C). 12. Tighten four knurled nuts (17) finger tight.
Do not use any tools to tighten the knurled nuts.
13. Install all mounting bolts (14) and tighten to a torque of 3 N m (27 lb.in.).14. Loosen knurled nuts (17). Remove four nuts (16) and remove tool (C).15. Install the spring and flyweight cover

Have questions with 101060-2040?





Group cross 101060-2040 ZEXEL

Isuzu 

 
1156100850 
FUEL-INJECTION PUMP
 
1156100840 
FUEL-INJECTION PUMP
101060-2040  

101060-4211 
 
1156100860 
FUEL-INJECTION PUMP
9 410 611 382 
NP-PE6A95C410RS2000NP690 
1156100950 
FUEL-INJECTION PUMP
9 410 613 804 
NP-PE6A95C412RS2000NP708 
1156101070 
FUEL-INJECTION PUMP

Mitsubishi 

 
ME056126 
FUEL-INJECTION PUMP
Back to top