Information fuel-injection pump
BOSCH
9 410 612 639
9410612639
ZEXEL
101043-9250
1010439250
ISUZU
5156100910
5156100910

Rating:
Scheme ###:
1. | [1] | 131062-6720 | PUMP HOUSING |
1/30. | [3] | 029040-6020 | STUD |
1/35A. | [1] | 131400-0100 | ADAPTOR |
1/40. | [1] | 131420-0420 | BLEEDER SCREW |
1/41. | [1] | 026512-1540 | GASKET D15.4&12.2T1.50 |
2. | [1] | 131028-6220 | COVER |
2/2. | [1] | 131011-1900 | GASKET |
3. | [2] | 131017-1000 | FLAT-HEAD SCREW |
5. | [2] | 029340-6020 | GASKET D10&6.5T1.00 |
16. | [4] | 131034-1401 | CAPSULE |
21. | [3] | 139206-0400 | UNION NUT |
23. | [1] | 029633-1010 | O-RING |
30. | [4] | 131151-8020 | PLUNGER-AND-BARREL ASSY |
36. | [4] | 131110-0320 | DELIVERY-VALVE ASSEMBLY |
37. | [4] | 131112-0300 | COILED SPRING |
40. | [4] | 131115-0200 | GASKET |
41. | [4] | 131116-6400 | FITTING |
42. | [4] | 131117-2900 | FILLER PIECE |
45. | [2] | 131122-0520 | PLATE |
55. | [4] | 131200-0220 | TAPPET |
55/2. | [1] | 131203-0200 | BEARING PIN |
55/3. | [1] | 131204-1000 | ROLLER |
55/4. | [1] | 131205-0500 | BUSHING |
55/5. | [1] | 131206-0200 | SLIDER |
56/1. | [0] | 029311-0020 | SHIM D19&10T0.30 |
56/1. | [0] | 029311-0030 | SHIM D19&10T0.40 |
56/1. | [0] | 029311-0040 | SHIM D19&10T0.50 |
56/1. | [0] | 029311-0050 | SHIM D19&10T0.6 |
56/1. | [0] | 029311-0060 | SHIM D19&10T0.7 |
56/1. | [0] | 029311-0070 | SHIM D19&10T0.8 |
56/1. | [0] | 029311-0080 | SHIM D19&10T0.9 |
56/1. | [0] | 029311-0090 | SHIM D19&10T1 |
56/1. | [0] | 029311-0110 | SHIM D19&10T1.1 |
56/1. | [0] | 029311-0120 | SHIM D19&10T1.2 |
56/1. | [0] | 029311-0130 | SHIM D19&10T1.3 |
56/1. | [0] | 029311-0140 | SHIM D19&10T1.4 |
56/1. | [0] | 029311-0270 | SHIM D19&10T0.55 |
56/1. | [0] | 029311-0280 | SHIM D19&10T0.65 |
56/1. | [0] | 029311-0290 | SHIM D19&10T0.75 |
56/1. | [0] | 029311-0310 | SHIM D19&10T0.85 |
56/1. | [0] | 029311-0320 | SHIM D19&10T0.95 |
56/1. | [0] | 029311-0330 | SHIM D19&10T1.05 |
56/1. | [0] | 029311-0340 | SHIM D19&10T1.15 |
56/1. | [0] | 029311-0350 | SHIM D19&10T1.25 |
56/1. | [0] | 029311-0490 | SHIM D19&10T1.5 |
56/1. | [0] | 029311-0500 | SHIM D19&10T1.6 |
56/1. | [0] | 029311-0580 | SHIM D19&10T0.2 |
56/1. | [0] | 029311-0590 | SHIM D19&10T0.25 |
56/1. | [0] | 029311-0600 | SHIM D19&10T0.35 |
56/1. | [0] | 029311-0610 | SHIM D19&10T0.45 |
56/1. | [0] | 029311-0620 | SHIM D19&10T1.35 |
56/1. | [0] | 029311-0630 | SHIM D19&10T1.45 |
56/1. | [0] | 029311-0710 | SHIM D19&10T1.55 |
61. | [4] | 131215-2500 | COMPRESSION SPRING |
62. | [4] | 131216-0100 | SLOTTED WASHER |
63. | [4] | 131217-0200 | SLOTTED WASHER |
67. | [1] | 131254-0500 | CONTROL RACK |
68. | [1] | 131226-0300 | FLAT-HEAD SCREW |
76. | [4] | 131240-0100 | PINION |
77. | [4] | 131241-0100 | CONTROL SLEEVE |
78. | [4] | 131242-0100 | FLAT-HEAD SCREW |
90. | [1] | 131360-0700 | CAMSHAFT |
91A. | [1] | 016630-2030 | BEARING PLATE |
91B. | [1] | 028201-7020 | BEARING PLATE |
91E. | [1] | 016630-2030 | BEARING PLATE |
91F. | [1] | 028201-7020 | BEARING PLATE |
92. | [1] | 131302-0300 | SPACER RING |
92A. | [1] | 131302-0300 | SPACER RING |
93/1. | [0] | 029311-7010 | SHIM D22&17T0.1 |
93/1. | [0] | 029311-7020 | SHIM D22&17T0.12 |
93/1. | [0] | 029311-7030 | SHIM D22&17T0.14 |
93/1. | [0] | 029311-7040 | SHIM D22&17T0.16 |
93/1. | [0] | 029311-7050 | SHIM D22&17T0.18 |
93/1. | [0] | 029311-7060 | SHIM D22&17T0.5 |
93/1. | [0] | 029311-7070 | SHIM D22&17T1.0 |
93/1. | [0] | 029311-7090 | SHIM D22&17T0.3 |
93/1. | [0] | 029311-7210 | SHIM D22&17T0.7 |
93/1. | [0] | 029311-7220 | SHIM D22&17T1.4 |
93/1. | [0] | 139417-0000 | SHIM D22&17T2.4 |
93A/1. | [0] | 029311-7010 | SHIM D22&17T0.1 |
93A/1. | [0] | 029311-7020 | SHIM D22&17T0.12 |
93A/1. | [0] | 029311-7030 | SHIM D22&17T0.14 |
93A/1. | [0] | 029311-7040 | SHIM D22&17T0.16 |
93A/1. | [0] | 029311-7050 | SHIM D22&17T0.18 |
93A/1. | [0] | 029311-7060 | SHIM D22&17T0.5 |
93A/1. | [0] | 029311-7070 | SHIM D22&17T1.0 |
93A/1. | [0] | 029311-7090 | SHIM D22&17T0.3 |
93A/1. | [0] | 029311-7210 | SHIM D22&17T0.7 |
93A/1. | [0] | 029311-7220 | SHIM D22&17T1.4 |
93A/1. | [0] | 139417-0000 | SHIM D22&17T2.4 |
101A. | [1] | 131330-2200 | COVER |
104A. | [4] | 020006-1440 | BLEEDER SCREW M6P1L14 |
112A. | [1] | 025803-1640 | WOODRUFF KEY |
117A. | [1] | 029731-4580 | EYE BOLT |
118A. | [2] | 029341-4080 | GASKET |
191. | [1] | 131459-1020 | BRACKET |
191/2. | [4] | 029041-0010 | STUD |
192. | [1] | 139768-0000 | O-RING |
194. | [4] | 014011-0140 | PLAIN WASHER D22&10.5T1.6 |
195. | [4] | 014111-0440 | LOCKING WASHER |
196. | [4] | 131465-0000 | UNION NUT |
334. | [1] | 029731-0410 | EYE BOLT |
336. | [2] | 029341-0090 | GASKET |
Cross reference number
Zexel num
Bosch num
Firm num
Name
101043-9250
9 410 612 639
5156100910 ISUZU
FUEL-INJECTION PUMP
Q
Q
Information:
start by:a) remove timing gear cover1. Remove the turbocharger return tube from the flywheel housing. 2. Remove two studs (1).3. Turn the engine with tool (A) to remove four bolts (2) from the rear balance weight gear.4. Turn the engine again with tool (A) until the "V" marks on all the timing gears are in alignment with each other.5. With the timing marks in alignment, install tooling (B) in the location of rear studs (1). Make sure the bolts [tooling (B)] are in the rear balance weight gear. Tighten the bolts [tooling (B)] evenly until the rear balance weight gear is free of the camshaft. 6. Remove bolts (3) and thrust plate (4). Pull the camshaft forward as far as possible [approximately 1/4 in. (6.4 mm)]. 7. Remove four bolts (6) and plate (7).8. Remove bolts (5) and the thrust plates that hold balance gear (8) in position. The gear must be pulled forward as bolts (5) are removed.9. After bolts (5) are all removed, remove balance gear (8). If balance gear (8) can not be removed turn the engine a small amount with tool (A) until the gear is free.10. Remove the bearing from balance gear (8) with tooling (D) and an arbor press. 11. Remove crankshaft gear (9) with tool (C).Install Timing Gears
1. Install the bearing in the front balance gear with tooling (A) and an arbor press. The bearing joint must be on a center line of the balance gear with in 20°.2. Heat crankshaft gear (3) to a maximum temperature of 400°F (204°C). Install the gear with the notch in the gear in alignment with the pin in the crankshaft. 3. Install shaft (1) in balance gear (2). Install the bolts in the shaft. Put the complete unit in position behind the camshaft gear as shown. Make sure the "V" mark on the two gears are in alignment with each other. Tighten the bolts that hold the balance gear in position. 4. Install plate (5) and the four bolts that hold the balance gear to the shaft. Make sure the groove in the plate is toward the gear.5. Push the camshaft toward the rear of the engine. Install thrust plate (4) and the bolts that hold the camshaft in position. Make sure the "V" mark on the camshaft gear is in alignment with the "V" mark on the balance gear.6. Remove tooling (C) (the two bolts) from the rear balance weight gear. Turn the engine with tool (B) to install the four bolts that hold the rear balance weight gear to the camshaft.7. Install the two studs in the flywheel housing.8. Install the turbocharger return tube assembly.end by:a) install timing gear cover
1. Install the bearing in the front balance gear with tooling (A) and an arbor press. The bearing joint must be on a center line of the balance gear with in 20°.2. Heat crankshaft gear (3) to a maximum temperature of 400°F (204°C). Install the gear with the notch in the gear in alignment with the pin in the crankshaft. 3. Install shaft (1) in balance gear (2). Install the bolts in the shaft. Put the complete unit in position behind the camshaft gear as shown. Make sure the "V" mark on the two gears are in alignment with each other. Tighten the bolts that hold the balance gear in position. 4. Install plate (5) and the four bolts that hold the balance gear to the shaft. Make sure the groove in the plate is toward the gear.5. Push the camshaft toward the rear of the engine. Install thrust plate (4) and the bolts that hold the camshaft in position. Make sure the "V" mark on the camshaft gear is in alignment with the "V" mark on the balance gear.6. Remove tooling (C) (the two bolts) from the rear balance weight gear. Turn the engine with tool (B) to install the four bolts that hold the rear balance weight gear to the camshaft.7. Install the two studs in the flywheel housing.8. Install the turbocharger return tube assembly.end by:a) install timing gear cover
Have questions with 101043-9250?
Group cross 101043-9250 ZEXEL
Isuzu
101043-9250
9 410 612 639
5156100910
FUEL-INJECTION PUMP