101043-9250 ZEXEL 9 410 612 639 BOSCH FUEL-INJECTION PUMP 9410612639 1010439250 5156100910


 

Information fuel-injection pump

BOSCH 9 410 612 639 9410612639
ZEXEL 101043-9250 1010439250
ISUZU 5156100910 5156100910
101043-9250 FUEL-INJECTION PUMP
Rating:
70
Buy FUEL-INJECTION PUMP 101043-9250 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

1. [1] 131062-6720 PUMP HOUSING
1/30. [3] 029040-6020 STUD
1/35A. [1] 131400-0100 ADAPTOR
1/40. [1] 131420-0420 BLEEDER SCREW
1/41. [1] 026512-1540 GASKET D15.4&12.2T1.50
2. [1] 131028-6220 COVER
2/2. [1] 131011-1900 GASKET
3. [2] 131017-1000 FLAT-HEAD SCREW
5. [2] 029340-6020 GASKET D10&6.5T1.00
16. [4] 131034-1401 CAPSULE
21. [3] 139206-0400 UNION NUT
23. [1] 029633-1010 O-RING
30. [4] 131151-8020 PLUNGER-AND-BARREL ASSY
36. [4] 131110-0320 DELIVERY-VALVE ASSEMBLY
37. [4] 131112-0300 COILED SPRING
40. [4] 131115-0200 GASKET
41. [4] 131116-6400 FITTING
42. [4] 131117-2900 FILLER PIECE
45. [2] 131122-0520 PLATE
55. [4] 131200-0220 TAPPET
55/2. [1] 131203-0200 BEARING PIN
55/3. [1] 131204-1000 ROLLER
55/4. [1] 131205-0500 BUSHING
55/5. [1] 131206-0200 SLIDER
56/1. [0] 029311-0020 SHIM D19&10T0.30
56/1. [0] 029311-0030 SHIM D19&10T0.40
56/1. [0] 029311-0040 SHIM D19&10T0.50
56/1. [0] 029311-0050 SHIM D19&10T0.6
56/1. [0] 029311-0060 SHIM D19&10T0.7
56/1. [0] 029311-0070 SHIM D19&10T0.8
56/1. [0] 029311-0080 SHIM D19&10T0.9
56/1. [0] 029311-0090 SHIM D19&10T1
56/1. [0] 029311-0110 SHIM D19&10T1.1
56/1. [0] 029311-0120 SHIM D19&10T1.2
56/1. [0] 029311-0130 SHIM D19&10T1.3
56/1. [0] 029311-0140 SHIM D19&10T1.4
56/1. [0] 029311-0270 SHIM D19&10T0.55
56/1. [0] 029311-0280 SHIM D19&10T0.65
56/1. [0] 029311-0290 SHIM D19&10T0.75
56/1. [0] 029311-0310 SHIM D19&10T0.85
56/1. [0] 029311-0320 SHIM D19&10T0.95
56/1. [0] 029311-0330 SHIM D19&10T1.05
56/1. [0] 029311-0340 SHIM D19&10T1.15
56/1. [0] 029311-0350 SHIM D19&10T1.25
56/1. [0] 029311-0490 SHIM D19&10T1.5
56/1. [0] 029311-0500 SHIM D19&10T1.6
56/1. [0] 029311-0580 SHIM D19&10T0.2
56/1. [0] 029311-0590 SHIM D19&10T0.25
56/1. [0] 029311-0600 SHIM D19&10T0.35
56/1. [0] 029311-0610 SHIM D19&10T0.45
56/1. [0] 029311-0620 SHIM D19&10T1.35
56/1. [0] 029311-0630 SHIM D19&10T1.45
56/1. [0] 029311-0710 SHIM D19&10T1.55
61. [4] 131215-2500 COMPRESSION SPRING
62. [4] 131216-0100 SLOTTED WASHER
63. [4] 131217-0200 SLOTTED WASHER
67. [1] 131254-0500 CONTROL RACK
68. [1] 131226-0300 FLAT-HEAD SCREW
76. [4] 131240-0100 PINION
77. [4] 131241-0100 CONTROL SLEEVE
78. [4] 131242-0100 FLAT-HEAD SCREW
90. [1] 131360-0700 CAMSHAFT
91A. [1] 016630-2030 BEARING PLATE
91B. [1] 028201-7020 BEARING PLATE
91E. [1] 016630-2030 BEARING PLATE
91F. [1] 028201-7020 BEARING PLATE
92. [1] 131302-0300 SPACER RING
92A. [1] 131302-0300 SPACER RING
93/1. [0] 029311-7010 SHIM D22&17T0.1
93/1. [0] 029311-7020 SHIM D22&17T0.12
93/1. [0] 029311-7030 SHIM D22&17T0.14
93/1. [0] 029311-7040 SHIM D22&17T0.16
93/1. [0] 029311-7050 SHIM D22&17T0.18
93/1. [0] 029311-7060 SHIM D22&17T0.5
93/1. [0] 029311-7070 SHIM D22&17T1.0
93/1. [0] 029311-7090 SHIM D22&17T0.3
93/1. [0] 029311-7210 SHIM D22&17T0.7
93/1. [0] 029311-7220 SHIM D22&17T1.4
93/1. [0] 139417-0000 SHIM D22&17T2.4
93A/1. [0] 029311-7010 SHIM D22&17T0.1
93A/1. [0] 029311-7020 SHIM D22&17T0.12
93A/1. [0] 029311-7030 SHIM D22&17T0.14
93A/1. [0] 029311-7040 SHIM D22&17T0.16
93A/1. [0] 029311-7050 SHIM D22&17T0.18
93A/1. [0] 029311-7060 SHIM D22&17T0.5
93A/1. [0] 029311-7070 SHIM D22&17T1.0
93A/1. [0] 029311-7090 SHIM D22&17T0.3
93A/1. [0] 029311-7210 SHIM D22&17T0.7
93A/1. [0] 029311-7220 SHIM D22&17T1.4
93A/1. [0] 139417-0000 SHIM D22&17T2.4
101A. [1] 131330-2200 COVER
104A. [4] 020006-1440 BLEEDER SCREW M6P1L14
112A. [1] 025803-1640 WOODRUFF KEY
117A. [1] 029731-4580 EYE BOLT
118A. [2] 029341-4080 GASKET
191. [1] 131459-1020 BRACKET
191/2. [4] 029041-0010 STUD
192. [1] 139768-0000 O-RING
194. [4] 014011-0140 PLAIN WASHER D22&10.5T1.6
195. [4] 014111-0440 LOCKING WASHER
196. [4] 131465-0000 UNION NUT
334. [1] 029731-0410 EYE BOLT
336. [2] 029341-0090 GASKET

Include in #1:

101431-0721 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
101043-9250 
9 410 612 639 
5156100910  ISUZU
FUEL-INJECTION PUMP
Q




Information:

start by:a) remove timing gear cover1. Remove the turbocharger return tube from the flywheel housing. 2. Remove two studs (1).3. Turn the engine with tool (A) to remove four bolts (2) from the rear balance weight gear.4. Turn the engine again with tool (A) until the "V" marks on all the timing gears are in alignment with each other.5. With the timing marks in alignment, install tooling (B) in the location of rear studs (1). Make sure the bolts [tooling (B)] are in the rear balance weight gear. Tighten the bolts [tooling (B)] evenly until the rear balance weight gear is free of the camshaft. 6. Remove bolts (3) and thrust plate (4). Pull the camshaft forward as far as possible [approximately 1/4 in. (6.4 mm)]. 7. Remove four bolts (6) and plate (7).8. Remove bolts (5) and the thrust plates that hold balance gear (8) in position. The gear must be pulled forward as bolts (5) are removed.9. After bolts (5) are all removed, remove balance gear (8). If balance gear (8) can not be removed turn the engine a small amount with tool (A) until the gear is free.10. Remove the bearing from balance gear (8) with tooling (D) and an arbor press. 11. Remove crankshaft gear (9) with tool (C).Install Timing Gears
1. Install the bearing in the front balance gear with tooling (A) and an arbor press. The bearing joint must be on a center line of the balance gear with in 20°.2. Heat crankshaft gear (3) to a maximum temperature of 400°F (204°C). Install the gear with the notch in the gear in alignment with the pin in the crankshaft. 3. Install shaft (1) in balance gear (2). Install the bolts in the shaft. Put the complete unit in position behind the camshaft gear as shown. Make sure the "V" mark on the two gears are in alignment with each other. Tighten the bolts that hold the balance gear in position. 4. Install plate (5) and the four bolts that hold the balance gear to the shaft. Make sure the groove in the plate is toward the gear.5. Push the camshaft toward the rear of the engine. Install thrust plate (4) and the bolts that hold the camshaft in position. Make sure the "V" mark on the camshaft gear is in alignment with the "V" mark on the balance gear.6. Remove tooling (C) (the two bolts) from the rear balance weight gear. Turn the engine with tool (B) to install the four bolts that hold the rear balance weight gear to the camshaft.7. Install the two studs in the flywheel housing.8. Install the turbocharger return tube assembly.end by:a) install timing gear cover

Have questions with 101043-9250?





Group cross 101043-9250 ZEXEL

9 410 610 745 
 
FUEL-INJECTION PUMP

Isuzu 

9 410 612 638 
NP-PES4A60C312LS2000NP555 
5156100750 
FUEL-INJECTION PUMP
101043-9250  
9 410 612 639 
5156100910 
FUEL-INJECTION PUMP
9 410 612 640 
NP-PES4A60C312LS2000NP746 
5156101140 
FUEL-INJECTION PUMP
9 410 612 641 
NP-PES4A60C312LS2000NP747 
5156101170 
FUEL-INJECTION PUMP
9 410 612 642 
NP-PES4A60C312LS2000 
8944165900 
FUEL-INJECTION PUMP
Back to top