Information flyweight
BOSCH
9 423 610 081
9423610081
ZEXEL
156205-2200
1562052200
ISUZU
5157430060
5157430060

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
156205-2200
9 423 610 081
5157430060 ISUZU
FLYWEIGHT
C 14GQ FLYWEIGHT TIMER
C 14GQ FLYWEIGHT TIMER
Information:
1. Remove bolts (1) and (2) from engine oil pump manifold (3). 2. Remove four bolts (4) and remove oil pump. The following steps are for the installation of the engine oil pump.3. With O-ring seal in place, on oil pump flange, position the oil pump and install four bolts (4). Tighten bolts (4) evenly to pull oil pump into place.4. Position gaskets and install bolts (1) and (2) to hold manifold.End By:a. install oil filterDisassemble & Assemble Engine Oil Pump
Start By:a. remove oil pump 1. Remove manifold (1). Remove four bolts (2) and remove cover (3). 2. Remove O-ring seal (4) and gear (5).3. Use Tooling (A) and remove driver gear (6).
Before removing input shaft and gear (7) from pump housing, be sure no burrs exist on the input shaft. If the shaft has burrs it could scratch the pump housing and damage it.
4. Remove input shaft and gear (7) from pump housing. The following steps are for the assembly of the engine oil pump.5. Position input shaft and gear (7) in pump housing. Press drive gear (6) onto input shaft until it is flush with the end of the shaft.6. Install gear (6). Install O-ring (4) in cover (3), then install cover and bolts (2). 7. With O-rings in place, install manifold (1).End By:a. install engine oil pump
Start By:a. remove oil pump 1. Remove manifold (1). Remove four bolts (2) and remove cover (3). 2. Remove O-ring seal (4) and gear (5).3. Use Tooling (A) and remove driver gear (6).
Before removing input shaft and gear (7) from pump housing, be sure no burrs exist on the input shaft. If the shaft has burrs it could scratch the pump housing and damage it.
4. Remove input shaft and gear (7) from pump housing. The following steps are for the assembly of the engine oil pump.5. Position input shaft and gear (7) in pump housing. Press drive gear (6) onto input shaft until it is flush with the end of the shaft.6. Install gear (6). Install O-ring (4) in cover (3), then install cover and bolts (2). 7. With O-rings in place, install manifold (1).End By:a. install engine oil pump
Have questions with 156205-2200?
Group cross 156205-2200 ZEXEL
Isuzu
156205-2200
9 423 610 081
5157430060
FLYWEIGHT