107692-5122 ZEXEL Calibration Data 1076925122


 

Information

ZEXEL 107692-5122 1076925122
107692-5122 None
Rating:
69
Buy None 107692-5122 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 107692-5122 1076925122


Zexel num
Bosch num
Firm num
Name
107692-5122 
 
   

FE6TA

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131425-0520
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
PS/ACT control unit part no.   407910-3 03*
Selector switch no.   01
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   15
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   5.1 5.07 5.13
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   -
Rack position   14.7
Pump speed r/min   1300 1300 1300
Average injection quantity mm3/st.   110.5 108.5 112.5
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the rack   *
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.1+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.1+-0.0 5
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   8.4+-0.5
Pump speed r/min   545 545 545
Average injection quantity mm3/st.   22.5 20.7 24.3
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
PS407980-224* V   V1+0.05+ -0.01
PS407980-224* mm   5+-0.03
PS407910-303* V   V1+0.05+ -0.01
PS407910-303* mm   5+-0.03
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Refer to items regarding the pre-stroke actuator
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(14.7)
Pump speed r/min   1300 1300 1300
Average injection quantity mm3/st.   110.5 109.5 111.5
Basic   *
Fixing the lever   *
Boost pressure kPa   28 28
Boost pressure mmHg   210 210
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.1+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.1+-0.0 5
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-2.05
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   101.5 97.5 105.5
Fixing the lever   *
Boost pressure kPa   28 28
Boost pressure mmHg   210 210
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.1+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.1+-0.0 5
Injection quantity adjustment_05
Adjusting point   C
Rack position   (R2-0.7)
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   47.7 45.7 49.7
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.1+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.1+-0.0 5
Boost compensator adjustment
Pump speed r/min   350 350 350
Rack position   (R2-0.7)
Boost pressure kPa   6.7 5.4 8
Boost pressure mmHg   50 40 60
Boost compensator adjustment_02
Pump speed r/min   350 350 350
Rack position   R2(R1-3. 95)
Boost pressure kPa   14.7 14.7 14.7
Boost pressure mmHg   110 110 110
0000001601
CU407980-224*   *
Actuator retarding type   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2 1.95 2.05
Output voltage V   2.83 2.82 2.84
Adjustment   *
_02
CU407980-224*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.1 5.07 5.13
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_03
CU407980-224*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *
_04
CU407910-303*   *
Actuator retarding type   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2 1.95 2.05
Output voltage V   2.83 2.82 2.84
Adjustment   *
_05
CU407910-303*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.1 5.07 5.13
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_06
CU407910-303*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Governor adjustment

Test data 107692-5122
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator stroke: BCL
----------
T1=AF93 BCL=(0.7)mm
----------

Speed control lever angle

Test data 107692-5122
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=93.5mm
----------
a=17deg+-5deg b=(37deg)+-3deg

Stop lever angle

Test data 107692-5122
N:Pump normal S:Stop the pump. (1)Use the pin at R = aa (2)Set the stopper bolt at rack position = bb (non-injection rack position), (speed = cc)
----------
aa=37mm bb=1.5+-0.3mm cc=0r/min
----------
a=20deg+-5deg b=45deg+-5deg

0000001301

Test data 107692-5122
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)Pre-stroke: aa (4)-
----------
aa=5.1+-0.03mm
----------
a=(20deg)

0000001401

Test data 107692-5122
(1)Pointer (2)Injection timing aligning mark (3)Fly weight (4)The actual shape and direction may be different from this illustration. Operation sequence 1. Turn the prestroke actuator OFF. 2. Turn the camshaft as far as the No.1 cylinder's beginning of injection position. 3. Check that the pointer alignment mark of the injection pump and the alignment mark of the flywheel are matching. 4. If they are not matching, erase the alignment mark on the flywheel side, and stamp an alignment mark on the flywheel position that matches with the pointer side alignment mark. 5. Check again that the coupling's key groove position is in the No.1 cylinder's beginning of injection position.
----------

----------

0000001701

Test data 107692-5122
A : Stopper pin B: Connector
----------

----------

0000001801

Test data 107692-5122
C:Shim
----------

----------

0000001901

Test data 107692-5122
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000002201 RACK SENSOR

Test data 107692-5122
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1300r/min Ra=R1(14.7)mm
----------




Information:

For all marine transmission lubrication and maintenance activities, refer to your marine transmission or vessel OEM literature.Use fuel consumption, service hours, or calendar time, whichever occurs first, to determine maintenance intervals. Experience has shown that maintenance intervals are most accurately scheduled on the basis of fuel consumed rather than service hours.Daily
Walk-Around Inspection - Inspect engine for leaks and loose connections Engine Crankcase - Check oil level Cooling System - Check coolant level Air Cleaner - Check service indicator/Service air cleaner when needed Air Starter (If Equipped) - Check lubricator oil level Clutch (If Equipped) - Check/Adjust/Lubricate Marine Transmission - Check oil levelEvery 2550 L (675 gal) of Fuel or 50 Hours
Zinc Rods - Inspect/ReplaceFirst 12,750 L (3375 gal) of Fuel or 250 Hours
1 Valve Lash - Check/Adjust (at the first oil change interval)Every 12,750 L (3375 gal) of Fuel or 250 Hours or Yearly
1 Scheduled Oil Sampling (S O S) - Obtain Sample and analysis1 Engine Crankcase - Replace oil and filter(s)1 Crankcase Breathers - Clean Fuel System - Clean primary fuel filter (if equipped)/Replace final fuel filter Fuel Tank - Drain water and sediment Cooling System (Conventional HD Coolant Only) - Test for SCA concentration OR obtain Level I coolant analysis/Add SCA if necessary Air Cleaner - Clean/Replace air filter elements Belts - Check/Adjust/Replace Hoses and Clamps - Inspect/Replace Batteries - Clean/Check (if required)Every 51,000 L (13,500 gal) Of Fuel Or 1000 Hours
Engine Protection Devices - Inspect/Check Magnetic Pickup - Inspect/AdjustEvery 153,500 L (40,500 gal) Of Fuel Or 3000 Hours
Water Temperature Regulators (Thermostats) - Replace Cooling System (Extended Life Coolant Only) - Add Extender2 Cooling System (Conventional HD Coolant Only) - Drain/Clean/Replace coolant Engine Mounts - Inspect Crankshaft Vibration Damper - Inspect Valve Lash, Valve Rotators - Check/Adjust Fuel Ratio Control, Set Point, and Low Idle - Check/Adjust PAR Analysis - ObtainEvery 256,000 L (67,500 gal) Of Fuel Or 5000 Hours
Fuel Injection Nozzles - Test/Exchange Jacket Water Pump - Inspect/Rebuild or Exchange Raw/Sea Water Pump - Inspect/Rebuild or Exchange Alternator - Inspect/Rebuild or Exchange Starting Motor - Inspect/Rebuild or Exchange Air Compressor (If Equipped) - Inspect/Rebuild or Exchange Turbocharger - Clean/Inspect/CheckEvery 6000 Hours Or Four Years
Cooling System (Extended Life Coolant Only) - Drain/Flush/Replace CoolantOverhaul
Overhaul Considerations13408 Marine Engines that are equipped with the deep oil sump [87 L (92 qt)] may perform this maintenance after 25,500 L (6750 gal) of fuel or 500 Hours.2If a commercial HD coolant/antifreeze meeting ASTM D4985 specifications is used, or if a mixture of commercial SCA and water is used, this maintenance should be performed at a maximum of One Year.

Have questions with 107692-5122?





Group cross 107692-5122 ZEXEL

Nissan-Diesel 

9 400 619 067 
16714Z5573 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 619 068 
16714Z5574 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 

 
 

FE6TA
107692-5122  
 
 

FE6TA
 
 

 
 

FE6TA
 
 

FE6TA
 
 
INJECTION-PUMP ASSEMBLY
FE6TC

Nissan-Diesel 

9 400 619 069 
16801Z5579 
INJECTION-PUMP ASSEMBLY
FE6TC
9 400 611 731 
16714Z5660 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 611 364 
16714Z5661 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 612 146 
16714Z5662 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 612 239 
16714Z5663 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 612 147 
16714Z5664 
INJECTION-PUMP ASSEMBLY
FE6TA
Back to top