106871-9100 ZEXEL Cross 1068719100


 

Information

ZEXEL 106871-9100 1068719100
106871-9100 None
Rating:
58
Buy None 106871-9100 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
106871-9100 
 
   





Information:

START BY:a. remove oil pump1. Check the main bearing caps for identification for their location and direction in the block. The caps must be installed in the same location and direction from which they were removed. 2. Remove No. 2 through No. 6 bearing caps (1). Remove thrust plates from the No. 4 main bearing.
If the crankshaft is turned in the wrong direction, the tab of the bearing will be pushed between the crankshaft and cylinder block. This can cause damage to either or both.
3. Remove the upper halves of the main bearings by putting tool (A) in oil hole (2) in the crankshaft. Turn the crankshaft in the direction which will push the end of the bearing with a tab out first.4. Remove the lower halves of the bearings from the caps. Install the bearings dry when the clearance checks are made. Put clean engine oil on the bearings for final assembly.5. Install the new bearings in the caps.6. Install the upper halves of the bearings in the cylinder block with tool (A). Be sure tabs (3) on the back of the bearings fit in the tab slots of the caps and cylinder block.The serviceman must be very careful to use Plastigage correctly. The following points must be remembered:...Make sure that the backs of the bearings and the bores are clean and dry....Make sure that the bearing locking tabs are properly seated in their slots....The crankshaft must be free of oil where the Plastigage touches it....If the main bearing clearances are checked with the engine upright or on its side, the crankshaft must be supported. Use a jack under an adjacent crankshaft counterweight and hold the crankshaft against the crown of the bearing. If the crankshaft is not supported, the weight of the crankshaft will cause incorrect readings....Put a piece of Plastigage on the crown of the bearing half that is in the cap. Do not allow the Plastigage to extend over the edge of the bearing....Install the bearing cap using the correct torque-turn specifications. Do not use an impact wrench. Be careful not to dislodge the bearing when the cap is installed....Do not turn the crankshaft with the Plastigage installed....Carefully remove the cap, but do not remove the Plastigage. Measure the width of the Plastigage while it is in the bearing cap or on the crankshaft journal. Do this by using the correct scale on the package. Record the measurements....Remove the Plastigage before installing the cap.When using Plastigage, the readings can sometimes be unclear. For example, all parts of the Plastigage are not the same width. Measure the major widths to make sure that they are within the specification range. Also experience has shown that when checking clearances tighter than 0.10 mm (.004") the readings may be low by 0.013 to 0.025 mm (.0005 to .0010"). Out-of-round journals can give faulty readings. Also, journal taper may be indicated when one end of the Plastigage is wider than the other.For complete details concerning measuring bearing clearances, see

Have questions with 106871-9100?





Group cross 106871-9100 ZEXEL

106871-9100  
 
 

 
 

Hyundai 

9 400 618 321 
 
INJECTION-PUMP ASSEMBLY
8DC11

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY
8DC11
F 019 Z20 262 
 
INJECTION-PUMP ASSEMBLY
F17F
F 019 Z20 263 
 
INJECTION-PUMP ASSEMBLY
P
 
 
INJECTION-PUMP ASSEMBLY
P
F 019 Z20 264 
 
INJECTION-PUMP ASSEMBLY
P
F 019 Z20 265 
 
INJECTION-PUMP ASSEMBLY
8DC9
F 019 Z20 266 
 
INJECTION-PUMP ASSEMBLY
8DC9
F 019 Z20 267 
 
INJECTION-PUMP ASSEMBLY
8DC9
Back to top