105614-3280 ZEXEL Cross 1056143280


 

Information

ZEXEL 105614-3280 1056143280
105614-3280 None
Rating:
21
Buy None 105614-3280 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105614-3280 
 
   





Information:

Start By:a. remove valve covers
Typical Example1. Use Tool (A) to loosen the nuts and remove fuel lines (2).2. Disconnect fuel lines (1) from the valve cover base adapters.
Put protection caps (5F-2807) and plugs (2F-2990) on the fuel line openings to keep dirt and foreign material out of the fuel system.
3. Remove locks (3) and fuel line adapters (4) from the valve cover bases for clearance to remove the rocker shaft bolts. 4. Remove bolts (5) and rocker shaft assemblies (6) from the cylinder head. 5. Remove push rods (7) from the cylinder heads.6. Put identification on each valve bridge as to its location. Remove valve bridges (8) from the cylinder heads.Install Rocker Shaft Assemblies
1. Put clean engine oil on the bridge dowels, push rods (2) and inside bridges (1). Install bridges (1) and push rods (2) in the correct positions. 2. Push straight down on the top contact surface of valve bridge (1) with a force of 4 to 45 N (1 to 10 lb). Turn the adjustment screw clockwise until contact is made with the valve stem. Turn the adjustment screw 20 to 30 degrees more to keep bridge (1) straight on the dowel. Hold the adjustment screw in this position and tighten the locknut to a torque of 28 4 N m (22 3 lb ft). 3. Put rocker shaft assembly (3) in position on the cylinder head. Make sure the adjustment screws in the rocker arms are correctly engaged with the push rods. 4. Put clean engine oil on the threads of the bolts and install the bolts to hold rocker shaft assembly. Tighten the bolts as follows:a. Tighten bolts 1 through 6 in number sequence shown to a torque of 270 25 N m (200 20 lb ft).b. Tighten bolts 1 through 6 in number sequence shown to a torque of 447 20 N m (330 15 lb ft).c. Tighten bolts 1 through 6 in number sequence shown again to a torque of 447 20 N m (330 15 lb ft). 5. Put clean engine oil on the O-ring seals and install fuel line adapters (5), the washers, spaces, locks and nuts (4). Tighten nuts (4) to a torque of 14 3 N m (10 2 lb ft) 6. Install fuel lines (7) and connect fuel lines (6) to the fuel line adapters. Use Tool (A) and tighten the nuts for fuel lines (7). Tighten all fuel line nuts to a torque of 40 7 N m (30 5 lb ft).7. Make an adjustment of the valves to have a clearance of 0.38 mm (.015 in) for intake and 0.76 mm (.030 in) for exhaust. See Valve Clearance Setting in Testing And Adjusting.End By:a. install valve covers Disassemble Rocker Shaft Assemblies
Start By:a. remove rocker shaft assemblies 1. Remove retainer (1) from the end of the shaft.2. Remove the washers and rocker arm (2). 3. Use Tool (A) to remove the pin that

Have questions with 105614-3280?





Group cross 105614-3280 ZEXEL

Isuzu 

9 420 615 668 
NP-EP/SA500-1500B4R 
1157402160 
AUTOM. ADVANCE MECHANISM
9 420 615 668 
NP-EP/SA500-1500B4R 
1157402220 
AUTOM. ADVANCE MECHANISM
9 420 615 668 
NP-EP/SA500-1500B4R 
1157402460 
AUTOM. ADVANCE MECHANISM

Nissan-Diesel 

9 420 615 482 
NP-EP/SA1140-1500B4R 
16810Z5519 
AUTOM. ADVANCE MECHANISM
9 420 616 754 
NP-EP/SA1230-1500B4R 
16810Z5562 
AUTOM. ADVANCE MECHANISM
9 420 616 754 
NP-EP/SA1230-1500B4R 
16810Z5510 
AUTOM. ADVANCE MECHANISM

Isuzu 

9 420 616 755 
NP-EP/SA900-1100B2.5R 
1157401990 
AUTOM. ADVANCE MECHANISM

Hino 

9 420 616 370 
NP-EP/SA1070-1750B5R 
225001940A 
AUTOM. ADVANCE MECHANISM

Nissan-Diesel 

9 420 616 099 
NP-EP/SA870-1400B1R 
1685195012 
AUTOM. ADVANCE MECHANISM
9 420 617 096 
 
AUTOM. ADVANCE MECHANISM
 
 

105614-3280  
 
 

Nissan-Diesel 

9 420 615 032 
NP-EP/SA800-1400B2R 
16810Z5563 
AUTOM. ADVANCE MECHANISM
Back to top