09640-60000 SHIM, PLUNGER ADJU Denso Cross


 

Information shim, plunger adju

09640-60000 SHIM, PLUNGER ADJU
Rating:
7
Buy SHIM, PLUNGER ADJU 09640-60000 genuine, new aftermarket engine parts with delivery

Include in #3:

Number on scheme 000
SHIM, PLUNGER ADJU
09640-60020 as SHIM, PLUNGER ADJU

Cross reference number



Part num Firm num Firm Name
09640-60000    SHIM, PLUNGER ADJU




Information:

785 ( 8GB1-417),
789 ( 9ZC1-439)Introduction
The Automatic Ether Injection System (AEIS) controls the amount of ether to be injected into the engine intake manifold during cold weather starting. Correct operation of this electronically controlled system is required to prevent possible damage to the engine during cold-start conditions.This instruction gives the procedure needed to install the automatic ether injection system for the engine in a 785 Truck and 789 Truck, within the product identification number range given. Installation of this ether injection system will ensure that the correct amount of ether is injected when required during the starting procedure.Do not perform any procedure, outlined in this publication, or order any parts until you read and understand the information contained within. Before starting the installation procedure, make certain the machine disconnect switch is in the OFF position.Reference: Service Manual, Form SENR4705.Necessary Parts
Special Tools
* Hole Saw 57.34 mm (2.257 in).* Twist Drill 18.25 mm (.719 in).* Tap 1/2"-14 NPTF.Installation Procedure for Components of Automatic Ether Injection System
If the machine is equipped with an earlier version ether starting aid group, remove the entire system with the exception of the in-cab, dash mounted, 8C9812 Switch and the tubing to the turbocharger outlet adapters. The parts to remain will consist of two tubes from the nozzles to a tee and the tee.On the 789 Truck, the parts to remain will consist of four tubes from the nozzles to the tees and two tees.All electrical wiring from the earlier system must be removed, including the wiring to the 8C9812 Switch. The harness to the existing ether system that is located on the cross tube remains. Tie wrap the existing connections and install dummy plugs in the sure-seal connectors.Installation of the 8X3710 Plate Assembly
785 Truck
785 Truck. View as seen from the engine side of frame cross tube assembly (2).1. Use the dimensions shown to position two 8D8832 Plates (1) to the engine side of frame cross tube assembly (2).2. Mount 8X3710 Plate

Have questions with 09640-60000?





Group cross 09640-60000

Back to top