09300-05871 PUMP ASSY, INJECTI Denso Cross


 

Information pump assy, injecti

09300-05871 PUMP ASSY, INJECTI
Rating:
53
Buy PUMP ASSY, INJECTI 09300-05871 genuine, new aftermarket engine parts with delivery

Scheme ###:

000. [01] 09300-05871 PUMP ASSY, INJECTI ME217085
006. [01] 19010-00361 BODY ASSY, INJECTI ME736192
007. [01] 19080-05850 GOVERNOR ASSY, MEC ME743237
008. [01] 94901-40210 WASHER, COUNTERSUN ME702043
009. [01] 94913-00210 KEY, WOODRUFF ME702047
010. [01] 09210-01540 PUMP ASSY, FUEL FE ME703397
010. [01] 09210-03330 PUMP ASSY, FUEL FE ME743436
011. [01] 09001-20220 NUT, TIMER ROUND ME702033
012. [01] 91518-08221 BOLT, W/WASHER MM500963
013. [06] 91418-06161 BOLT, W/WASHER ME702149
014. [01] 09001-80090 COVER, CONTROL RAC ME702251
015. [01] 09006-00450 COVER SUB-ASSY, TI ME736126
016. [04] 94901-15020 WASHER, STEEL PLAT MH005068
017. [04] 90258-10001 WASHER, SPRING MC327716
018. [04] 91266-10081 NUT, HEXAGON MF430122
019. [01] 94914-02840 O-RING MH035502
020. [01] 09180-03800 TIMER ASSY, AUTOMA ME743049

Include in #3:

09300-05871 as PUMP ASSY, INJECTI

Cross reference number



Part num Firm num Firm Name
09300-05871  ME217085  PUMP ASSY, INJECTI




Information:

3. Remove bearing caps (1) from the two connecting rods. Put pieces of rubber hose or tape on the threads of the connecting rod bolts as protection for the crankshaft. 4. Push the pistons up until the piston rings are clear of the cylinder liner. Remove pistons (2). Keep each cap with its connecting rod.
Do not turn the crankshaft while any of the connecting rods are in the engine without the caps installed. Do not cause damage to the cooling tubes when the pistons are removed.
5. Do Steps 1 through 4 for the remainder of the pistons.Install Pistons
1. Put clean engine oil on the piston rings and cylinder liners. 2. Put two pistons in position opposite of each other in the correct bore of the block. Install pistons (1) with tool (A).
Make sure that the pistons are installed with flat surfaces (2) of the connecting rods toward each other and the chamfered sides (4) toward the crankshaft.
For more detail about the installation of connecting rod bearings see REMOVE AND INSTALL CONNECTING ROD BEARINGS.3. Check the bearing clearances with tool (B). 4. Put clean engine oil on bolts (5) and the connecting rod bearings. Install caps (3) and nuts finger tight. Tighten each nut to a torque of 60 6 lb.ft. (80 8 N m). Put a mark across the nuts and bolts. Tighten each nut 120° more.5. Check the side clearance between two connecting rods on the same crankshaft journal. Clearance must be .011 to .033 in. (0.28 to 0.84 mm) for new rods.6. Do Steps 1 through 5 for the remainder of the pistons.

Have questions with 09300-05871?





Group cross 09300-05871

Back to top