Information delivery-valve assembly
BOSCH
9 413 610 159
9413610159
ZEXEL
131160-2620
1311602620
MITSUBISHI
ME704341
me704341

Rating:
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
Include in ###:
Number on scheme 36
1010609690
as DELIVERY-VALVE ASSEMBLY
1010609980
as DELIVERY-VALVE ASSEMBLY
09A
1010619020
as DELIVERY-VALVE ASSEMBLY
1010619150
as DELIVERY-VALVE ASSEMBLY
09A
1010619170
as DELIVERY-VALVE ASSEMBLY
1010619231
as DELIVERY-VALVE ASSEMBLY
09A
1010619400
as DELIVERY-VALVE ASSEMBLY
1010629400
as DELIVERY-VALVE ASSEMBLY
09A
1010699410
as DELIVERY-VALVE ASSEMBLY
Cross reference number
Zexel num
Bosch num
Firm num
Name
131160-2620
ME704341 MITSUBISHI
DELIVERY-VALVE ASSEMBLY
C 14EX DELIVERY VALVE DV(A) DV
C 14EX DELIVERY VALVE DV(A) DV
Information:
Typical Example2. Remove eight bolts (3) that fasten pipe (1) to the elbow. Remove four bolts (2) that fasten the elbow to the aftercooler cover. Remove elbow (4).
Typical Example3. Remove bracket (5) from the oil filter tube and the oil level gauge group.
Typical Example4. Remove four bolts (7) from the air inlet elbow. Remove plate (6) and elbow (8). 5. Remove two tubes (10) from the air compressor to the aftercooler.6. Remove elbows (9) from the aftercooler housing.
Typical Example
Put identification on bolts (12) because they are 6.4 mm (.25 in) longer than all other bolts. They must be installed in the same location.
7. Remove bolts (11) and (12) from cover, and remove the cover.
Put identification on bolt (14) because it is 12.7 mm (.50 in) shorter than all the other bolts. It must be installed in the same location. Remove four adapters (15). Put plugs in both holes in the aftercooler core assembly. This will keep coolant out of the engine intake manifold.
8. Remove bolts (13) and (14) that hold the core assembly in position.9. Remove the aftercooler core assembly. 10. Remove air line (17) from the fuel ratio control valve.11. Remove eight bolts (16). Remove housing assembly (18).Install Aftercooler
1. Check all seals and gaskets for damage. If damaged, use new parts for replacement.
All foreign material and dirt must be removed from the gasket surface and inside the housing and intake manifold.
2. Install housing (1) and air line (2) to the fuel control valve. 3. Install four new seals (3) on the core assembly. Put clean glycerin on the O-ring seals. 4. Install core assembly (4) inside the housing. Remove plugs in both holes of the aftercooler core assembly. Install the bolts that fasten the core to housing. Install the bolts in their original location. 5. Put clean engine oil in the bores of the adapters. Install adapters (5). 6. Put cover (6) in position on the aftercooler. Install the two bolts in position (7). These bolts are 6.4 mm (.25 in) longer than all other bolts around the housing. Install the remainder of the bolts around the housing. 7. Install elbows (8). 8. Install two tubes (9) between the air compressor and the aftercooler.
Typical Example9. Install elbow (10) and plate (11) on the aftercooler cover. Install the bracket that is a support for the oil filter tube and the oil level gauge group. Install the oil filter tube and the oil level gauge group.