130110-1320 ZEXEL 9 413 610 344 BOSCH DELIVERY-VALVE ASSEMBLY 9413610344 1301101320


 

Information delivery-valve assembly

BOSCH 9 413 610 344 9413610344
ZEXEL 130110-1320 1301101320
130110-1320 DELIVERY-VALVE ASSEMBLY
Rating:
23
Buy DELIVERY-VALVE ASSEMBLY 130110-1320 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 36
DELIVERY-VALVE ASSEMBLY
1043004680 as DELIVERY-VALVE ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
130110-1320 
9 413 610 344 
   
DELIVERY-VALVE ASSEMBLY
C 14FG DELIVERY VALVE DV(S-K) DV




Information:

START BY:a. remove timing gear cover
Do not disconnect the air line from the air compressor governor until the air pressure is zero.
1. Loosen the bleed valves, and release the air pressure in the air tank. 2. Disconnect the lines from air compressor (1), and remove the air compressor. 3. Remove sleeve (2) from air compressor drive gear (3). 4. Remove the nut and washer that holds the air compressor drive gear to the air compressor. Use tooling (A) to remove air compressor drive gear (3) from the air compressor. 5. Remove nuts (4) and plate (5). Remove gear assembly (6) from the shaft. 6. If damaged, remove bearing (7) from gear (6) with tooling (B) and a press. 7. Remove three nuts (8) and the washers from the adapter assembly studs. 8. Remove adapter assembly (9) from the timing gear plate. 9. Remove shaft (10), O-ring seal (11) and sleeve (12) from the adapter assembly.Install Air Compressor And Accessory Drive
1. Install sleeve (1) into adapter assembly (2). 2. Install shaft (3) and O-ring seal (4) on the adapter assembly. 3. Put adapter assembly (2) in position on the timing gear plate. Fasten it with the three nuts and washers. 4. Install the bearing in gear (5) with tooling (A) and a press. Install the bearing until it is 1.5 0.5 mm (.06 .02 in.) below the surface of the gear as shown. 5. Put gear assembly (5) in position on shaft (3). 6. Put plate (6) in position, and install three nuts (7) to hold it. 7. Put gear (8) in position on the air compressor shaft, and install the washer and nut (9). Tighten the nut to a torque of 200 25 N m (150 18 lb.in.). Tap the gear with a hammer and tighten nut (9) again to a torque of 200 25 N m (150 18 lb.ft.). 8. Install sleeve (10) on gear (8). 9. Put a gasket in position on air compressor (11), and install the air compressor on the timing cover plate.END BY:a. install timing gear cover

Have questions with 130110-1320?





Group cross 130110-1320 ZEXEL

9 413 610 786 
K46 
 
VALVE BODY
130110-1320  
9 413 610 344 
 
DELIVERY-VALVE ASSEMBLY
Back to top