130110-0320 ZEXEL 9 413 610 060 BOSCH DELIVERY-VALVE ASSEMBLY 9413610060 1301100320 5156410070


 

Information delivery-valve assembly

BOSCH 9 413 610 060 9413610060
ZEXEL 130110-0320 1301100320
ISUZU 5156410070 5156410070
130110-0320 DELIVERY-VALVE ASSEMBLY
Rating:
27
Buy DELIVERY-VALVE ASSEMBLY 130110-0320 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
130110-0320 
9 413 610 060 
50/1A 
5156410070  ISUZU
DELIVERY-VALVE ASSEMBLY
C 14FG DELIVERY VALVE DV(S-K) DV
130110-0320 
9 413 610 060 
50/1A 
16773Z9007  NISSAN-DIESEL
DELIVERY-VALVE ASSEMBLY
C 14FG DELIVERY VALVE DV(S-K) DV
130110-0320 
9 413 610 060 
50/1A 
1311560100  ISHIKAWAJIMA-S
DELIVERY-VALVE ASSEMBLY
C 14FG DELIVERY VALVE DV(S-K) DV




Information:

START BY:a. remove valve covers 1. Use tool (A), and disconnect fuel line (1) at each end. Remove the fuel line from the engine. 2. Use tool (B), and remove retainer (2) from the adapter.3. Remove the fuel injection nozzles with tooling (C) as follows:a. Install the 6V6983 Adapter and the 8T3199 Screw into nozzle assembly (3).b. Install the 8T3198 Tube over the 8T3199 Screw.c. Use the 1B4206 Nut on the 8T3199 Screw to pull the fuel injection nozzle from the adapter.4. Remove compression seal (4) and carbon dam seal (8) from fuel injection nozzle (3).5. Use tool (D), and remove adapter (6) from the cylinder head.6. Remove gasket (7) and seal (5) from adapter (6). The following steps are for installation of the fuel injection nozzles and adapters.7. Use tool (E) to clean the bore in adapter (6). Use an open end wrench or tap driver to turn tool (E).8. Inspect seal (5) for damage or wear. Replace the seal if necessary.9. Put washer (7) and seal (5) in position on adapter (6).10. Put liquid soap in the bores of the cylinder head and on seals (5) in the adapters.11. Put 5P3931 Anti-Seize Compound on the threads of adapter (6), and install the adapter in the cylinder head assembly.12. Use tool (D), and tighten the adapter to a torque of 205 14 N m (150 10 lb.ft.).
Make sure the correct compression seal washer (4) is used when the nozzle assembly is installed in the adapter. Only copper washers are to be used with this adapter.
13. Install compression seal washer (4), and use tool (F) to install carbon dam seal (8) on the fuel injection nozzle.14. Put fuel injection nozzle (3) in position in the adapter, and install retainer (2).15. Use tool (B) to tighten retainer (2) to a torque of 48 7 N m (35 5 lb.ft.).16. Install fuel line (1). Tighten the nuts on the fuel line with tool (A) to a torque of 40 7 N m (30 5 lb.ft.).END BY:a. install valve covers

Have questions with 130110-0320?





Group cross 130110-0320 ZEXEL

Isuzu 

130110-0320  
9 413 610 060 
50/1A 
5156410070 
DELIVERY-VALVE ASSEMBLY

Nissan-Diesel 

130110-0320  
9 413 610 060 
50/1A 
16773Z9007 
DELIVERY-VALVE ASSEMBLY

Ishikawajima-S 

130110-0320  
9 413 610 060 
50/1A 
1311560100 
DELIVERY-VALVE ASSEMBLY
Back to top