Information cover
BOSCH
9 421 610 864
9421610864
ZEXEL
154404-5100
1544045100
ISUZU
1157213030
1157213030

Rating:
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
154404-5100
9 421 610 864
1157213030 ISUZU
COVER
C 14GJ COVER GOV
C 14GJ COVER GOV
154404-5100
9 421 610 864
ME723784 MITSUBISHI
COVER
C 14GJ COVER GOV
C 14GJ COVER GOV
154404-5100
9 421 610 864
19263Z9008 NISSAN-DIESEL
COVER
C 14GJ COVER GOV
C 14GJ COVER GOV
Information:
2. Remove pipe (1) and the gasket between aftercooler cover (2) and the turbocharger. If necessary, remove the O-ring seals from the pipe.3. Remove the bolts and clamps that hold tube assemblies (3) to each end of the aftercooler. Remove tube assemblies (3) from each end of the aftercooler. If necessary, remove the O-ring seals from the tube assemblies. An O-ring seal on each end of the aftercooler core holds the adapters in position.4. Remove adapters (4) and the gaskets from each end of the aftercooler.5. Remove all bolts (5) that hold aftercooler cover (2) in position. Remove the aftercooler cover and gasket from the engine. 6. Remove aftercooler core (6) and the gasket from the engine. If necessary, remove the O-ring seals from the aftercooler core. Two of the bolts that hold the aftercooler housing in position are on the inside of the aftercooler housing.7. Remove the bolts and spacers that hold aftercooler housing (7) to the engine. Make a note of the location of the spacers. Remove the aftercooler housing and gaskets from the engine.Install Aftercooler
Inspect all O-ring seals and gaskets, and make replacements if necessary. 1. Put the gaskets and aftercooler housing (1) in position on the engine. Install the bolts and spacers that hold the aftercooler housing.2. Install the O-ring seals on the aftercooler core, and put a thin layer of clean engine oil on them. Put the gasket and aftercooler core (2) in position on the engine. 3. Put the gasket and aftercooler cover (3) in position. Install the bolts that hold the aftercooler cover. Force may be required to push the adapters around the O-ring seals on the aftercooler core. Make sure the O-ring seals stay in position on the aftercooler core.4. Put a thin layer of clean engine oil in the bores of adapters (4). Install a gasket and adapter on each end of the aftercooler core. 5. Install the O-ring seals on tube assemblies (5), and put a thin layer of clean engine oil on them. Put the tube assemblies in position on each end of the aftercooler, and install the bolts and clamps that hold them.6. Install the O-ring seals on pipe (6), and put a thin layer of clean engine oil on them. Put the pipe and gasket in position between the aftercooler and the turbocharger. Install the bolts that hold it.7. Fill the radiator with coolant to the correct level. See the Operation & Maintenance Manual.
Inspect all O-ring seals and gaskets, and make replacements if necessary. 1. Put the gaskets and aftercooler housing (1) in position on the engine. Install the bolts and spacers that hold the aftercooler housing.2. Install the O-ring seals on the aftercooler core, and put a thin layer of clean engine oil on them. Put the gasket and aftercooler core (2) in position on the engine. 3. Put the gasket and aftercooler cover (3) in position. Install the bolts that hold the aftercooler cover. Force may be required to push the adapters around the O-ring seals on the aftercooler core. Make sure the O-ring seals stay in position on the aftercooler core.4. Put a thin layer of clean engine oil in the bores of adapters (4). Install a gasket and adapter on each end of the aftercooler core. 5. Install the O-ring seals on tube assemblies (5), and put a thin layer of clean engine oil on them. Put the tube assemblies in position on each end of the aftercooler, and install the bolts and clamps that hold them.6. Install the O-ring seals on pipe (6), and put a thin layer of clean engine oil on them. Put the pipe and gasket in position between the aftercooler and the turbocharger. Install the bolts that hold it.7. Fill the radiator with coolant to the correct level. See the Operation & Maintenance Manual.
Have questions with 154404-5100?
Group cross 154404-5100 ZEXEL
Isuzu
154404-5100
9 421 610 864
1157213030
COVER
Mitsubishi
154404-5100
9 421 610 864
ME723784
COVER
Nissan-Diesel
154404-5100
9 421 610 864
19263Z9008
COVER