105661-1100 ZEXEL 9 423 618 006 BOSCH COUPLING PLATE 9423618006 1056611100 8943939620


 

Information coupling plate

BOSCH 9 423 618 006 9423618006
ZEXEL 105661-1100 1056611100
ISUZU 8943939620 8943939620
105661-1100 COUPLING PLATE
Rating:
25
Buy COUPLING PLATE 105661-1100 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

1. [1] 156632-1200 COUPLING PLATE
2. [2] 156633-3700 BLEEDER SCREW
4. [1] 156605-7820 PLATE
6. [2] 156617-4200 UNION NUT
7. [2] 156634-4100 BLEEDER SCREW
11. [1] 156628-3000 COUPLING
12. [2] 156634-4100 BLEEDER SCREW
16. [1] 156605-7820 PLATE
17. [2] 156634-4100 BLEEDER SCREW
20. [1] 156634-4200 BLEEDER SCREW

Include in #1:

101603-8060 as COUPLING PLATE

Cross reference number

Zexel num
Bosch num
Firm num
Name
105661-1100 
105661-1101 
9 423 618 006 
8943939620  ISUZU
COUPLING PLATE
* K




Information:

Start By:a. remove engine
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Unplug the connector and remove speed pickup (1) to prevent damage to the unit.2. Install tool (A) on the flywheel as shown and fasten a hoist.3. Remove bolts (2) and flywheel (3). The weight of the flywheel is 72 kg (160 lb.).4. If necessary, remove the ring gear from the flywheel with a hammer and punch. The following steps are for the installation of the flywheel.
The ring gear must be installed with the chamfered side of the teeth up as shown in the inset of illustration A89844P2. This will put the chamfered side of the gear teeth toward the starter when the flywheel is installed so the starter will engage correctly.
1. Heat ring gear (4) to a maximum temperature of 320° C (608° F). Install the ring gear. 2. Install tooling (A) on the flywheel in the same position it was during removal. Install two 5/8" - 18 NF guide bolts in the crankshaft if necessary.3. Make an alignment of timing mark (5) on the crankshaft and timing mark (6) on the flywheel. Hold flywheel (3) in position and install bolts (2). Tighten bolts (2) to a torque of 205 27 N m (151 20 lb ft).4. Remove tool (A).5. Install speed pickup (1). Hand tighten speed pickup (1) until it makes contact with the flywheel. Loosen speed pickup (1) one half turn (180°) after contacting the flywheel. Tighten the locknut on speed pickup (1) and the connect wiring harness.End By:a. install engine

Have questions with 105661-1100?





Group cross 105661-1100 ZEXEL

Isuzu 

105661-1100  

105661-1101 
9 423 618 006 
8943939620 
COUPLING PLATE
9 423 617 687 
8943939621 
COUPLING PLATE

Nissan-Diesel 

9 423 617 931 
16820Z5563 
COUPLING PLATE
9 423 617 932 
16820Z5565 
COUPLING PLATE
9 423 617 475 
16820Z5566 
COUPLING PLATE

Isuzu 

9 423 617 688 
8943953080 
COUPLING PLATE

Nissan-Diesel 

9 423 617 476 
16820Z5569 
COUPLING PLATE
9 423 618 233 
 
COUPLING PLATE

Isuzu 

9 423 617 689 
8943939622 
COUPLING PLATE

Nissan-Diesel 

9 423 617 791 
16820Z5570 
COUPLING PLATE
F 01G 29S 00G 
 

Back to top