407910-1271 ZEXEL CONTROL UNIT Cross 4079101271


 

Information control unit

ZEXEL 407910-1271 4079101271
407910-1271 CONTROL UNIT
Rating:
22
Buy CONTROL UNIT 407910-1271 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
407910-1271 
 
   
CONTROL UNIT
407910-1271 
 
5825400230  ISUZU
CONTROL UNIT
* C




Information:


Do not disconnect any air lines until the air pressure is zero.
1. Loosen the bleed valves and release the air pressure in the air tanks.2. Drain the oil from the oil pan. 3. Remove two short bolts (1) and two longer bolts (3) from manifold (2) and the BrakeSaver housing. Remove manifold (2). Remove the O-ring seals from the manifold. 4. Remove oil temperature sensing unit (4) from the BrakeSaver control valve.5. Disconnect air line (5) and hose assembly (6) from the BrakeSaver control valve. 6. Remove bolt (7) and retainer (8) that hold the oil lines in the BrakeSaver control valve. 7. Disconnect oil lines (9) and (10) from the oil cooler. Remove oil lines (9) and (10) from the BrakeSaver control valve. 8. Remove bolts (12) and BrakeSaver control valve (11) from under the oil pan. The weight is 22 kg (48 lb.).9. Remove elbow (13) from the BrakeSaver control valve. Remove the O-ring seals. The following steps are for installation of the BrakeSaver control valve.10. Inspect the O-ring seals for damage, and make replacements if needed. Put clean engine oil on the O-ring seals.11. Install the O-ring seals and elbow (13) on the BrakeSaver control valve.12. Make sure the O-ring seals are in position on the face of the BrakeSaver control valve. Put BrakeSaver control valve (11) in position under the oil pan. Install bolts (12) that hold the BrakeSaver control valve to the oil pan.13. Install oil temperature sensing unit (4) in the BrakeSaver control valve.14. Connect air line (5) and hose assembly (6) to the BrakeSaver control valve.15. Install the O-ring seals on manifold (2). Install manifold (2) in the BrakeSaver control valve. Install the four bolts that hold the manifold to the BrakeSaver housing.16. Make sure the O-ring seals are in place on the oil lines, and install oil lines (9) and (10).17. Install retainer (8) to hold the oil lines in the BrakeSaver control valve. If the bottom plug in the oil pan was removed, put the split (seam) of the gasket for the plug against the oil pan. If either plug on the side of the oil pan was removed, put 5P3413 Pipe Sealant With Teflon on the threads, and tighten the plug to a torque of 80 11 N m (60 8 lb.ft.).18. Fill the engine with oil to the correct level. See the Maintenance Manual.Disassemble & Assemble BrakeSaver Control Valve
Start By:a. remove BrakeSaver control valve 1. Remove O-ring seals (1) from the valve body.
Covers (3) and (4) hold a spring under compression. To prevent possible personal injury from flying parts, hold covers (3) and (4) when the bolts are removed.
2. Remove four bolts (2) slowly and evenly from cover (4). Remove the cover.3. Remove cover (3) and the seal from the opposite end of the valve body. 4. Remove spool (8) as an assembly.5. Remove spring (7), stop (10), spring (6) and slug (9).6. Remove the O-ring seals and sleeve (5). 7. Remove bolt (11), plate

Have questions with 407910-1271?





Group cross 407910-1271 ZEXEL

 
 
CONTROL UNIT

Isuzu 

 
1825400040 
CONTROL UNIT
 
 

 
 

 
 

 
 

 
 
CONTROL UNIT

Nissan-Diesel 

 
19100Z5520 
CONTROL UNIT
 
 
CONTROL UNIT

Isuzu 

 
1066916850 
CONTROL UNIT
 
 
CONTROL UNIT

Mitsubishi 

 
ME035813 
CONTROL UNIT
 
 
CONTROL UNIT

Mitsubishi 

 
1016031480 
CONTROL UNIT
407910-1271  
 
 
CONTROL UNIT

Isuzu 

407910-1271  
 
5825400230 
CONTROL UNIT
 
 

9 443 614 686 
 

Back to top