407900-3750 ZEXEL 9 443 614 495 BOSCH CONTROL UNIT 9443614495 4079003750


 

Information control unit

BOSCH 9 443 614 495 9443614495
ZEXEL 407900-3750 4079003750
407900-3750 CONTROL UNIT
Rating:
24
Buy CONTROL UNIT 407900-3750 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
407900-3750 
9 443 614 495 
   
CONTROL UNIT
75AZ CONTROL UNIT C/U OTHER C/U OTH
407900-3750 
9 443 614 495 
R22918701B  MAZDA
CONTROL UNIT
C 75AZ CONTROL UNIT C/U OTHER C/U OTH




Information:

Start By:a. remove oil pumpb. remove oil pan plate
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Turn the crankshaft until two pistons are at the bottom center. Remove connecting rod caps (1) from the two connecting rods. Remove the lower half of the rod bearing from the rod bearing cap.
The connecting rod bolts are loose on the connecting rods and can fall out when the nuts are removed.
2. Push the connecting rods away from the crankshaft. Remove the upper half of the rod bearing from the connecting rod. Install the connecting rod bearings dry when the clearance checks are made. Put clean engine oil on the connecting rod bearings for final assembly.3. Install the upper half of the rod bearing in the connecting rod.4. Install the lower half of the rod bearing in the connecting rod cap. Be sure the tabs in the back of the connecting rod bearings are in the tab grooves of the connecting rod and cap. 5. Use Plastigage (A) to check the connecting rod bearing clearance.6. Put Plastigage (A) on the connecting rod bearing.7. Put 2P2506 Thread Lubricant on the threads of the rod bolts and seat surfaces of the nuts.
When connecting rod caps are installed, make sure the number on the side of the cap is next to and respective with the number on the side of the connecting rod.
Do not turn the crankshaft when Plastigage (A) is in position.
Do not use an impact wrench to tighten the nuts the additional 90°.
8. Install connecting rod cap (1). Install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb ft) Put a mark on each nut and the end of each bolt. Tighten the nuts 90° more. Remove the connecting rod caps. Remove Plastigage (A) and measure the width of the Plastigage. The connecting rod clearance must be 0.076 to 0.168 mm (.0030 to .0066 in) for new bearings. The maximum clearance with used bearings is 0.25 mm (.010 in).9. Install the connecting rod caps and tighten the nuts as in Step 8.10. Do Steps 1 through 9 for the remainder of the connecting rod bearings.End By:a. install oil pan plateb. install oil pump
Perform Scheduled Oil Sampling on oil wetted compartments after performing service work to check for contaminants left in the system following repair. Contaminants put into the system may cause rapid wear and shortened component life.

Have questions with 407900-3750?





Group cross 407900-3750 ZEXEL

 
 
CONTROL UNIT

Nissan 

 
1106705E05B 
CONTROL UNIT
9 443 614 492 
 
CONTROL UNIT;DSS

Mazda 

9 443 614 492 
PN1118701A 
CONTROL UNIT;DSS
 
 
CONTROL UNIT

Isuzu 

 
8941731200 
CONTROL UNIT
9 443 614 493 
 
CONTROL UNIT

Isuzu 

9 443 614 493 
8944137760 
CONTROL UNIT
9 443 614 494 
 
CONTROL UNIT

Isuzu 

9 443 614 494 
8944167470 
CONTROL UNIT
407900-3750  
9 443 614 495 
 
CONTROL UNIT

Mazda 

407900-3750  
9 443 614 495 
R22918701B 
CONTROL UNIT
 
 
CONTROL UNIT

Isuzu 

 
8944348750 
CONTROL UNIT
 
 
CONTROL UNIT

Isuzu 

 
8944348760 
CONTROL UNIT
 
 
CONTROL UNIT

Isuzu 

 
8944405600 
CONTROL UNIT
9 443 614 496 
 
CONTROL UNIT

Isuzu 

9 443 614 496 
1815102311 
CONTROL UNIT
Back to top