159202-4520 ZEXEL 9 421 610 819 BOSCH CONTROL LEVER 9421610819 1592024520 1157254720


 

Information control lever

BOSCH 9 421 610 819 9421610819
ZEXEL 159202-4520 1592024520
ISUZU 1157254720 1157254720
159202-4520 CONTROL LEVER
Rating:
37
Buy CONTROL LEVER 159202-4520 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
159202-4520 
9 421 610 819 
1157254720  ISUZU
CONTROL LEVER
C 14GJ LEVER GOV
159202-4520 
9 421 610 819 
ME723076  MITSUBISHI
CONTROL LEVER
C 14GJ LEVER GOV
159202-4520 
9 421 610 819 
1925189TA0  NISSAN
CONTROL LEVER
C 14GJ LEVER GOV
159202-4520 
9 421 610 819 
1930154T65  NISSAN-DIESEL
CONTROL LEVER
C 14GJ LEVER GOV




Information:

Start By:a. remove valve covers
Typical Example1. Use Tool (A) to loosen the nuts and remove fuel lines (2).2. Disconnect fuel lines (1) from the valve cover base adapters.
Put protection caps (5F-2807) and plugs (2F-2990) on the fuel line openings to keep dirt and foreign material out of the fuel system.
3. Remove locks (3) and fuel line adapters (4) from the valve cover bases for clearance to remove the rocker shaft bolts. 4. Remove bolts (5) and rocker shaft assemblies (6) from the cylinder head. 5. Remove push rods (7) from the cylinder heads.6. Put identification on each valve bridge as to its location. Remove valve bridges (8) from the cylinder heads.Install Rocker Shaft Assemblies
1. Put clean engine oil on the bridge dowels, push rods (2) and inside bridges (1). Install bridges (1) and push rods (2) in the correct positions. 2. Push straight down on the top contact surface of valve bridge (1) with a force of 4 to 45 N (1 to 10 lb). Turn the adjustment screw clockwise until contact is made with the valve stem. Turn the adjustment screw 20 to 30 degrees more to keep bridge (1) straight on the dowel. Hold the adjustment screw in this position and tighten the locknut to a torque of 28 4 N m (22 3 lb ft). 3. Put rocker shaft assembly (3) in position on the cylinder head. Make sure the adjustment screws in the rocker arms are correctly engaged with the push rods. 4. Put clean engine oil on the threads of the bolts and install the bolts to hold rocker shaft assembly. Tighten the bolts as follows:a. Tighten bolts 1 through 6 in number sequence shown to a torque of 270 25 N m (200 20 lb ft).b. Tighten bolts 1 through 6 in number sequence shown to a torque of 447 20 N m (330 15 lb ft).c. Tighten bolts 1 through 6 in number sequence shown again to a torque of 447 20 N m (330 15 lb ft). 5. Put clean engine oil on the O-ring seals and install fuel line adapters (5), the washers, spaces, locks and nuts (4). Tighten nuts (4) to a torque of 14 3 N m (10 2 lb ft) 6. Install fuel lines (7) and connect fuel lines (6) to the fuel line adapters. Use Tool (A) and tighten the nuts for fuel lines (7). Tighten all fuel line nuts to a torque of 40 7 N m (30 5 lb ft).7. Make an adjustment of the valves to have a clearance of 0.38 mm (.015 in) for intake and 0.76 mm (.030 in) for exhaust. See Valve Clearance Setting in Testing And Adjusting.End By:a. install valve covers Disassemble Rocker Shaft Assemblies
Start By:a. remove rocker shaft assemblies 1. Remove retainer (1) from the end of the shaft.2. Remove the washers and rocker arm (2). 3. Use Tool (A) to remove the pin that

Have questions with 159202-4520?





Group cross 159202-4520 ZEXEL

Isuzu 

159202-4520  
9 421 610 819 
1157254720 
CONTROL LEVER

Mitsubishi 

159202-4520  
9 421 610 819 
ME723076 
CONTROL LEVER

Nissan 

159202-4520  
9 421 610 819 
1925189TA0 
CONTROL LEVER

Nissan-Diesel 

159202-4520  
9 421 610 819 
1930154T65 
CONTROL LEVER
Back to top