Information control lever
BOSCH
9 421 611 581
9421611581
ZEXEL
159202-4020
1592024020
ISUZU
1157255190
1157255190

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
159202-4020
9 421 611 581
1157255190 ISUZU
CONTROL LEVER
C 14GJ LEVER GOV
C 14GJ LEVER GOV
159202-4020
9 421 611 581
1670517D12 NISSAN-DIESEL
CONTROL LEVER
C 14GJ LEVER GOV
C 14GJ LEVER GOV
159202-4020
9 421 611 581
19334Z9302 NISSAN-DIESEL
CONTROL LEVER
A C 14GJ LEVER GOV
A C 14GJ LEVER GOV
159202-4020
9 421 611 581
TF0113VR6 MAZDA
CONTROL LEVER
C 14GJ LEVER GOV
C 14GJ LEVER GOV
Information:
2. Remove three nuts and washers (1).3. Move Peec unit (2) out of the way. (If so equipped). 4. Remove elbows (5) and pipes (7).5. Remove fuel line brackets (4).6. Remove bolts (6). Remove cover (3). 7. Remove elbows (10). Remove adapters (8) and adapters (9) from the aftercooler core. Remove bolts (11). 8. Move aftercooler core (12) toward the front of the engine and use two people to remove the aftercooler core from the lower aftercooler housing. The weight of the aftercooler core is approximately 29 kg (65 lb). Remove the O-ring seals from the aftercooler core extensions.Install Aftercooler
1. Install O-ring seals (13) on the aftercooler core extensions. Put clean engine oil or glycerin on the seals.2. Use two people to put aftercooler core (12) into position in the lower aftercooler housing. The weight of the aftercooler core is approximately 29 kg (65 lb). 3. Install bolts (11). Put clean engine oil or glycerin on O-ring seal (14) and in bores (15) and (16). 4. Put clean engine oil or glycerin on O-ring seals (17) and adapters (8) and (9). Install adapters (8) and (9) in the aftercooler core. 5. Install elbows (10). 6. Put cover (3) into position on the engine. Install bolts (6).7. Install fuel injection line brackets (4). Tighten bolts (20) to a torque of 4.5 1.1 N m (40 10 lb in).8. Put clean engine oil or glycerin on pipes (7). Install pipes (7) and elbows (5).9. Fill the cooling system with coolant. See Operation & Maintenance Manual for the proper procedure and levels.
1. Install O-ring seals (13) on the aftercooler core extensions. Put clean engine oil or glycerin on the seals.2. Use two people to put aftercooler core (12) into position in the lower aftercooler housing. The weight of the aftercooler core is approximately 29 kg (65 lb). 3. Install bolts (11). Put clean engine oil or glycerin on O-ring seal (14) and in bores (15) and (16). 4. Put clean engine oil or glycerin on O-ring seals (17) and adapters (8) and (9). Install adapters (8) and (9) in the aftercooler core. 5. Install elbows (10). 6. Put cover (3) into position on the engine. Install bolts (6).7. Install fuel injection line brackets (4). Tighten bolts (20) to a torque of 4.5 1.1 N m (40 10 lb in).8. Put clean engine oil or glycerin on pipes (7). Install pipes (7) and elbows (5).9. Fill the cooling system with coolant. See Operation & Maintenance Manual for the proper procedure and levels.
Have questions with 159202-4020?
Group cross 159202-4020 ZEXEL
Isuzu
159202-4020
9 421 611 581
1157255190
CONTROL LEVER
Nissan-Diesel
159202-4020
9 421 611 581
1670517D12
CONTROL LEVER
159202-4020
9 421 611 581
19334Z9302
CONTROL LEVER
Mazda
159202-4020
9 421 611 581
TF0113VR6
CONTROL LEVER