159202-0920 ZEXEL 9 421 610 102 BOSCH CONTROL LEVER 9421610102 1592020920 1157251550


 

Information control lever

BOSCH 9 421 610 102 9421610102
ZEXEL 159202-0920 1592020920
ISUZU 1157251550 1157251550
159202-0920 CONTROL LEVER
Rating:
17
Buy CONTROL LEVER 159202-0920 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
159202-0920 
159202-2020 
9 421 610 102 
1157251550  ISUZU
CONTROL LEVER
C 14GJ LEVER GOV
159202-0920 
159202-2020 
9 421 610 102 
5157251550  ISUZU
CONTROL LEVER
A C 14GJ LEVER GOV
159202-0920 
159202-2020 
9 421 610 102 
ME716249  MITSUBISHI
CONTROL LEVER
C 14GJ LEVER GOV
159202-0920 
159202-2020 
9 421 610 102 
19207L6000  NISSAN-DIESEL
CONTROL LEVER
C 14GJ LEVER GOV




Information:

1. Remove two bolts (4) that hold tube assembly (1) to the engine block.2. Remove one bolt (not shown) that holds pipe (3) to oil pump (2). Remove the pipe and tube assembly as a unit. 3. Remove three bolts (5). Remove oil pump (2).Install Oil Pump
1. Check the O-ring seals for damage. If damaged, use new parts for replacement. 2. Put oil pump (1) in position. Install the three bolts that hold the oil pump to the engine. 3. Put clean engine oil on all O-ring seals, and install pipe (2) and tube assembly (3) in the oil pump as a unit. Install two bolts that fasten the pipe assembly to the engine block.End By:a. install oil panDisassemble Oil Pump
Start By:a. remove oil pump1. Remove the bolt and washer that hold the gear on the shaft. 2. Use Tooling (A) to remove drive gear (1) from the shaft. Remove the key from shaft. 3. Remove retainer (3) for the bypass valve.4. Remove the spring and bypass valve.5. Remove cover (2) from the pump body. 6. Use Tooling (B) to remove the bearings from the cover. 7. Remove gears (5) from pump body (4).8. Use Tooling (B) to remove the bearings from the pump body.Assemble Oil Pump
1. Use Tooling (A) to install the bearings in the main pump body until they are even with the outside surface of the pump body. Install the bearings so the junctions in the bearings are 30 15 degrees from the center of the bearing bores and toward the oil pump outlet passage (2) as shown. 2. Install idler gear (1) and drive gear (3) in the oil pump body. Put clean engine oil on the bearings and gears. 3. Use Tooling (A) to install the bearings in cover (4) until they are even with the outside surface of the cover. Install the bearings so the junctions in the bearings are 30 15 degrees from the center of the bearing bores and toward the oil pump outlet passage as shown. 4. Install bypass valve (5), spring (6), spacer and the retainer in the pump body.5. Install the key on the shaft. 6. Install gear (7) on the shaft. Install the washer and bolt that holds the gear on the shaft. Tighten the bolt to a torque of 55 7 N m (41 5 lb ft).7. Make sure the pump turns freely by hand after it is assembled.End By:a. install oil pump

Have questions with 159202-0920?





Group cross 159202-0920 ZEXEL

Isuzu 

159202-0920  

159202-2020 
9 421 610 102 
1157251550 
CONTROL LEVER
159202-0920  

159202-2020 
9 421 610 102 
5157251550 
CONTROL LEVER

Mitsubishi 

159202-0920  

159202-2020 
9 421 610 102 
ME716249 
CONTROL LEVER

Nissan-Diesel 

159202-0920  

159202-2020 
9 421 610 102 
19207L6000 
CONTROL LEVER
Back to top