159202-0220 ZEXEL 9 421 610 100 BOSCH CONTROL LEVER 9421610100 1592020220 5157250120


 

Information control lever

BOSCH 9 421 610 100 9421610100
ZEXEL 159202-0220 1592020220
ISUZU 5157250120 5157250120
159202-0220 CONTROL LEVER
Rating:
10
Buy CONTROL LEVER 159202-0220 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
159202-0220 
159202-2120 
9 421 610 100 
5157250120  ISUZU
CONTROL LEVER
C 14GJ LEVER GOV
159202-0220 
159202-2120 
9 421 610 100 
ME716238  MITSUBISHI
CONTROL LEVER
C 14GJ LEVER GOV
159202-0220 
159202-2120 
9 421 610 100 
19301L6000  NISSAN-DIESEL
CONTROL LEVER
C 14GJ LEVER GOV




Information:

1. Remove oil supply tube (1) and suction bell and tube (2). 2. Remove bolts (3) that hold the oil pump to the cylinder block and remove oil pump (4).3. To install, put oil pump (4) in position on the cylinder block. Install the bolts that hold the oil pump to the cylinder block.4. Put clean engine oil on the O-ring seals of the tubes.5. Install oil supply tube (1), suction bell and tube (2).End By:a. install oil panDisassemble Oil Pump
Start By:a. remove oil pump 1. Remove the bolt and washer that hold the gear on the shaft.2. Use Tool (A) and remove drive gear (1) from the shaft. Remove the key from the shaft. 3. Remove retainer (3) for the bypass valve. Remove the spring and the bypass valve.4. Remove cover (2) from the pump body. 5. Use Tool (B) and remove the bearings from the cover. 6. Remove gears (5) from pump body (4).7. Use Tool (B) and remove the bearings from pump body (4).Assemble Oil Pump
1. Use Tool (B) to install the bearings in the pump body. Install the bearings so the joint in the bearings is 30 15 degrees from the center line of the oil pump outlet passage (2). 2. Install idler gear and drive gear (5) in the oil pump body (4). Put clean engine oil on the bearings and the gears. 3. Use Tool (A) and install the bearings in cover (2). Install the bearings so the joint of the bearing bores toward oil pump outlet passage (6).4. Install bypass valve (7), spring (8) and the retainer.5. Install the key on the shaft. 6. Install gear (1) on the shaft. Install the washer and bolt that hold the gear on the shaft. Be sure the pump turns freely after assembly.End By:a. install oil pump

Have questions with 159202-0220?





Group cross 159202-0220 ZEXEL

Isuzu 

159202-0220  

159202-2120 
9 421 610 100 
5157250120 
CONTROL LEVER

Mitsubishi 

159202-0220  

159202-2120 
9 421 610 100 
ME716238 
CONTROL LEVER

Nissan-Diesel 

159202-0220  

159202-2120 
9 421 610 100 
19301L6000 
CONTROL LEVER
Back to top