146515-4820 ZEXEL 9 461 614 487 BOSCH CONTROL SHAFT 9461614487 1465154820 8943631870


 

Information control shaft

BOSCH 9 461 614 487 9461614487
ZEXEL 146515-4820 1465154820
ISUZU 8943631870 8943631870
146515-4820 CONTROL SHAFT
Rating:
44
Buy CONTROL SHAFT 146515-4820 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
146515-4820 
9 461 614 487 
8943631870  ISUZU
CONTROL SHAFT
C 11FV CONTROL SHAFT parts(VE) Others
146515-4820 
9 461 614 487 
1923054T00  NISSAN-DIESEL
CONTROL SHAFT
C 11FV CONTROL SHAFT parts(VE) Others
146515-4820 
9 461 614 487 
SLA113VL2  MAZDA
CONTROL SHAFT
C 11FV CONTROL SHAFT parts(VE) Others




Information:

7. Remove inner fuel lines (13). 8. Remove Jacobs washers (14) and Jacobs shims (15) from the Jacobs stud assemblies. 9. Remove bolt (17) and two Jacob stud assemblies (16) that hold the rocker shaft assembly to the head. Remove rocker shaft assembly (18). 10. Remove Jacobs exhaust valve bridges (20) from the exhaust valves only. The intake valves have the Caterpillar intake valve bridges. Remove the Caterpillar intake valve bridges (19).Install Jacobs Engine Brake
Do each step for each end of the engine. The front half is shown.1. Put clean engine oil on the bridges and dowels.2. Install Jacobs exhaust valve bridges (20) and the Caterpillar intake valve bridges (19) on the dowels.3. Keep hand pressure on the bridges, and turn the adjustment screw clockwise until contact is made with the valve stem. Turn the screw an extra 20° to 30°. This will make the dowel straight in the guide and compensate for gap (slack) in the threads. Hold the adjustment screw in this position, and tighten the locknut to a torque of 28 4 N m (21 3 lb.ft.). 4. Put rocket shaft assembly (18) in position on the cylinder head. 5. Install Jacobs washers (21) on the Jacobs stud assemblies (16). Put clean oil on the threads, and install washer and bolt (17) and Jacobs stud assemblies (16). Tighten the center bolt and Jacobs stud assemblies in increments of 70 N m (50 lb.ft.) each until a final torque of 450 N m (330 lb.ft.) is obtained.6. Make an adjustment to the valves to have a clearance of .015 (.038 mm) for the intake valves and .030 (0.76 mm) for the exhaust valves. Tighten the locknuts to a torque of 28 4 N m (21 3 lb.ft.), and check the valve clearance again. See Testing And Adjusting for the correct procedure. 7. Install a new Jacobs O-ring seal (22) on the Jacobs oil supply adapter in the rocker shaft assembly. Put clean oil on the Jacobs O-ring seal.
Do not cause damage to the O-ring seals on the inner fuel lines.
8. Install inner fuel lines (13). Tighten the fuel line nuts to a torque of 40 7 N m (30 5 lb.ft.) with tooling (A) and (B). The Jacobs brake for the 3406B Truck Engine has only one support bracket (11).9. Put Jacobs support brackets (11) in position as shown. Put oil on the threads of Jacobs bolts (12). Install the washers on the Jacobs bolts. Install Jacobs bolts (12) that hold the Jacobs support bracket in place. Tighten Jacobs bolts to a torque of 450 N m (330 lb.ft.). 10. Install Jacobs washers (14) on the Jacobs stud assemblies.
Be extra careful not to cause damage to the Jacobs oil supply adapter O-ring seal when the Jacobs brake housing assembly is installed.
The brake housing assembly with the mark "FRONT" on it must be installed on the front three cylinders. The brake housing assembly with the mark "REAR" must be install on

Have questions with 146515-4820?





Group cross 146515-4820 ZEXEL

Isuzu 

146515-4820  
9 461 614 487 
8943631870 
CONTROL SHAFT

Nissan-Diesel 

146515-4820  
9 461 614 487 
1923054T00 
CONTROL SHAFT

Mazda 

146515-4820  
9 461 614 487 
SLA113VL2 
CONTROL SHAFT
Back to top