141241-7520 ZEXEL 9 411 618 243 BOSCH CONTROL SLEEVE 9411618243 1412417520


 

Information control sleeve

BOSCH 9 411 618 243 9411618243
ZEXEL 141241-7520 1412417520
141241-7520 CONTROL SLEEVE
Rating:
42
Buy CONTROL SLEEVE 141241-7520 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 77
CONTROL SLEEVE
1041980151 as CONTROL SLEEVE

Cross reference number

Zexel num
Bosch num
Firm num
Name
141241-7520 
9 411 618 243 
   
CONTROL SLEEVE
C 24XX CONTROL SLEEVE PF parts PF




Information:

start by:a) remove fuel injection pump housing and governor 1. Install the fuel injection pump housing on tool (A).2. Remove the bolts (1) that hold the governor housing (2) to the fuel injection pump housing.3. Remove the governor housing (2). 4. Remove two springs (4) and the seat (5) from the governor housing.5. Remove the seat (7) from the shaft.6. Remove the spring (6) from the shaft.7. Remove the cover (3) from the pump housing. 8. Remove the shaft (8) and the lever (9) from the pump housing. 9. Remove the thrust collar (11) from the shaft.10. Remove the cover (10) from the pump housing. 11. Loosen the two bolts (13) that hold the torque spring assembly (12) and remove it from the pump housing. 12. Remove the pin (15) from the pump housing.13. Remove the screw (14) and the nut (16) from the pump housing.14. Remove the ring that holds the lever and remove the lever (18) from the dowel (17).15. Remove the dowel (17) from the pump housing. Dowel does not need to be removed unless camshaft is to be removed.
Pull on the shield only a small amount in each location so it will not have distortion or damage. A damaged shield must be replaced.
16. Remove the shield (19) from the camshaft with tool (B). 17. Install the timing pin (C) to hold the camshaft.18. Remove the bolts (20) that hold the flyweight assembly to the camshaft. 19. Remove the flyweight assembly (21) from the camshaft.20. Remove the timing pin (C) from the pump housing.Connection Of Governor To Fuel Injection Pump Housing
1. Put the fuel injection pump housing on the bracket assembly (A).2. Install the timing pin (B) to hold the camshaft.3. Put the flyweight assembly (1) in position on the camshaft. Be sure the pin that holds the shaft (2) is in position on the back of the flyweight assembly.4. Install the bolts that hold the flyweight assembly to the camshaft and tighten to a torque of 10 2 lb. ft. (1.38 0.28 mkg).5. Remove the timing pin (B). 6. Put the shield (3) in position over the flyweights. 7. Use the driver (C) to install the shield the remainder of the way on to the camshaft. 8. Put a new O-ring seal on the dowel (4) and install the dowel in the pump housing. Make the dowel even with the machined surface of the counterbore on the outside of the housing. 9. Put the lever (8) on the dowel (4) and install the ring that holds it on the dowel.10. Install the screw (6) and the nut (7) in the pump housing.11. Install the pin (5) in the pump housing. 12. Put the torque spring assembly (10) in position on the housing and tighten the two bolts (11) that hold it to the housing.13. Install the cover (9) on the pump housing. 14. Put the thrust collar (13) in position between the flyweights. Lift the flyweights up with a piece of wire

Have questions with 141241-7520?





Group cross 141241-7520 ZEXEL

Nkk 

F 01G 19W 02L 
215734A 
CONTROL SLEEVE

Niigata 

F 01G 19W 02L 
215734 
CONTROL SLEEVE

Niigata-Tekkou 

F 01G 19W 02L 
214965 
CONTROL SLEEVE
141241-7520  
9 411 618 243 
 
CONTROL SLEEVE
Back to top