Information control lever
BOSCH
9 411 618 854
9411618854
ZEXEL
140509-3020
1405093020
ISHIKAWAJIMA-S
1312964340
1312964340

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
140509-3020
9 411 618 854
1312964340 ISHIKAWAJIMA-S
CONTROL LEVER
C 23XX LEVER PFR- parts PFR
C 23XX LEVER PFR- parts PFR
Information:
preparatory steps: a) remove timing gear coverb) remove fuel injection pump housing and governorc) remove fuel transfer pump 1. Disconnect the accessory drive oil supply line (1) and the fuel drain line (2). Remove the fuel priming pump.2. Remove the accessory drive shaft gear retaining nut, washer, and sleeve. 3. Using tool (A), remove the accessory drive gear. 4. Remove four retaining bolts (3), two locks and retainer (4).5. Remove the accessory drive housing.6. Remove the accessory drive shaft and bearing as a unit from the housing. 7. Using tool (B), remove bearing (5).Install Accessory Drive Shaft
1. Heat the accessory drive shaft bearing to 300°F (149°C) and install the bearing on the shaft. 2. Install the accessory drive shaft and bearing (1) in the housing.3. Install the accessory drive housing. 4. Install the retainer, locks and retaining bolts.5. Locate top center (TC) compression stroke for No. 1 piston. See LOCATING TOP CENTER COMPRESSION POSITION FOR No. 1 PISTON in TESTING AND ADJUSTING. 6. Rotate the accessory drive shaft until tool (A) can be installed. 7. Install the accessory drive shaft sleeve, drive gear, conical washer and nut. Install the conical washer on the drive shaft with the O.D. in contact with the gear. Tighten the retaining nut (2) to 100 10 lb. ft. (13,8 1,4 mkg).8. Connect the fuel drain line and the oil supply line. Install the fuel priming pump.concluding steps: a) install fuel transfer pumpb) install fuel injection pump housing and governorc) install timing gear cover
1. Heat the accessory drive shaft bearing to 300°F (149°C) and install the bearing on the shaft. 2. Install the accessory drive shaft and bearing (1) in the housing.3. Install the accessory drive housing. 4. Install the retainer, locks and retaining bolts.5. Locate top center (TC) compression stroke for No. 1 piston. See LOCATING TOP CENTER COMPRESSION POSITION FOR No. 1 PISTON in TESTING AND ADJUSTING. 6. Rotate the accessory drive shaft until tool (A) can be installed. 7. Install the accessory drive shaft sleeve, drive gear, conical washer and nut. Install the conical washer on the drive shaft with the O.D. in contact with the gear. Tighten the retaining nut (2) to 100 10 lb. ft. (13,8 1,4 mkg).8. Connect the fuel drain line and the oil supply line. Install the fuel priming pump.concluding steps: a) install fuel transfer pumpb) install fuel injection pump housing and governorc) install timing gear cover
Have questions with 140509-3020?
Group cross 140509-3020 ZEXEL
Ishikawajima-S
140509-3020
9 411 618 854
1312964340
CONTROL LEVER