140243-7820 ZEXEL 9 411 619 912 BOSCH CONTROL RACK 9411619912 1402437820


 

Information control rack

BOSCH 9 411 619 912 9411619912
ZEXEL 140243-7820 1402437820
140243-7820 CONTROL RACK
Rating:
81
Buy CONTROL RACK 140243-7820 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 60
CONTROL RACK
1041354060 as CONTROL RACK

Cross reference number

Zexel num
Bosch num
Firm num
Name
140243-7820 
9 411 619 912 
   
CONTROL RACK
C 24XX CONTROL RACK PF parts PF




Information:

1. Remove the oil outlet line (1) for oil pump.2. Remove the bolts (2) and locks, and remove the oil pump. Weight of oil pump is 40 lb. (17 kg).Install Oil Pump
1. Put the oil pump in position on engine, and install the bolts and locks.2. Install the oil outlet line for pump.end by: a) install oil panDisassemble Oil Pump
start by: a) remove oil pump 1. Remove suction bell (2). 2. Remove cover (4) and screen (5) from suction bell.3. Remove the cover (1) from bypass valve.4. Remove the bypass valve spring and plunger for the oil pump.5. Remove the cotter pin, and loosen nut (3). 6. Install tool setup (A) and make the gear separate from shaft.7. Remove tool setup (A), nut (3), and gear. Remove the woodruff key from shaft. 8. Remove the bolts (6) and locks. Remove cover assembly (7).9. Remove the oil pump gears.10. Remove the bolts (9) and locks. Remove the cover assembly (8).11. Remove the bearings from cover assemblies (7) and (8).Assemble Oil Pump
1. Use tool setup (A) to install the bearings in the cover assemblies. 2. Put cover assembly (1) in position on body, and install the bolts and locks.3. Put clean oil on the oil pump gears and on the bearings in the cover assemblies.4. Put the oil pump gears in position on cover assembly (2), and install the cover assembly. Install the bolts and locks.5. Install the woodruff key in shaft.6. Put the drive gear in position on shaft, and install the nut and washer. Tighten the nut to 60 lb.ft. (8.3 mkg) plus the amount needed to put holes for cotter pin in alignment. Install the cotter pin. 7. Install the bypass valve plunger (3) and spring (4). Install the cover for bypass valve. 8. Put the screen assembly (5) in position in the suction bell, and install the cover.9. Install the suction bell on oil pump.end by: a) install oil pump

Have questions with 140243-7820?





Group cross 140243-7820 ZEXEL

140243-7820  
9 411 619 912 
 
CONTROL RACK
Back to top