156203-1300 ZEXEL 9 423 612 771 BOSCH COMPRESSION SPRING 9423612771 1562031300 16821z9003


 

Information compression spring

BOSCH 9 423 612 771 9423612771
ZEXEL 156203-1300 1562031300
NISSAN-DIESEL 16821Z9003 16821z9003
156203-1300 COMPRESSION SPRING
Rating:
16
Buy COMPRESSION SPRING 156203-1300 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 4
COMPRESSION SPRING
1056220290 as COMPRESSION SPRING

Cross reference number

Zexel num
Bosch num
Firm num
Name
156203-1300 
9 423 612 771 
16821Z9003  NISSAN-DIESEL
COMPRESSION SPRING
C 14GQ SPRING;TIMER TIMER




Information:

2. Remove bolts (1) from the alternator bracket.3. Remove the bolts that hold plate (3), and remove the plate.4. Disconnect water line (2) from the air compressor. Turn the water line tee toward the lifting bracket in order to provide clearance to remove the head bolt. 5. Remove bolts (4) and (5) that hold the cylinder head assembly to the cylinder block.6. Fasten a hoist, and remove the cylinder head assembly. The weight is approximately 135 kg (300 lb.).
Do not put the cylinder head assembly down on a flat surface. This can cause damage to the fuel injection valves.
7. Remove the gasket, seals (6) and O-ring seal (7) from the spacer plate. The following steps are for installation of the cylinder head. Be sure a new gasket has been installed between the spacer plate and the cylinder block. See Remove And Install Spacer Plate.8. Thoroughly clean the spacer plate and the bottom surface of the cylinder head assembly. Install a new head gasket, new seals (6) and two O-ring seals (7).9. Fasten a hoist, and put the cylinder head assembly in position on the cylinder block. 10. Put clean engine oil on the threads of the cylinder head bolts. Install the cylinder head bolts and washers. Tighten the bolts in sequence shown.a. Tighten bolts 1 through 20 in number sequence to a torque of 270 25 N m (200 18 lb.ft.). b. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).c. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.d. Install the rocker shaft assemblies and push rods. See Install Rocker Shaft Assemblies And Push Rods.e. Tighten bolts 21 through 26 in number sequence to a torque of 270 25 N m (200 18 lb.ft.). f. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.). g. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.h. Tighten the 3/8" bolts (5) to a torque of 43 7 N m (32 5 lb.ft.). If the studs for the exhaust manifold were removed, install new studs, and tighten them to a torque of 25 4 N m (18 3 lb.ft.)11. Make an adjustment to the valves to have a clearance of 0.38 mm (.015 in.) for intake and 0.76 mm (.030 in.) for exhaust. Tighten the locknuts for the valve adjustment screws to a torque of 28 4 N m (21 3 lb.ft.).12. Install the valve cover bases and the inner fuel lines. see Install Rocker Shaft Assemblies And Push Rods.13. Install the valve covers. See Install Valve Covers.14. Install pate (3).15. Connect water line (2) to the air compressor.16. Install bolts (1) for the alternator bracket.17. Install the

Have questions with 156203-1300?





Group cross 156203-1300 ZEXEL

Nissan-Diesel 

156203-1300  
9 423 612 771 
16821Z9003 
COMPRESSION SPRING
Back to top