Information compression spring
BOSCH
9 411 611 973
9411611973
ZEXEL
134112-3100
1341123100
ISUZU
1156430150
1156430150

Rating:
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
134112-3100
9 411 611 973
1156430150 ISUZU
COMPRESSION SPRING
C 14FR SPRING;D.V. parts(P,PD) Others
C 14FR SPRING;D.V. parts(P,PD) Others
134112-3100
9 411 611 973
ME755579 MITSUBISHI
COMPRESSION SPRING
C 14FR SPRING;D.V. parts(P,PD) Others
C 14FR SPRING;D.V. parts(P,PD) Others
134112-3100
9 411 611 973
16765NY000 NISSAN-DIESEL
COMPRESSION SPRING
C 14FR SPRING;D.V. parts(P,PD) Others
C 14FR SPRING;D.V. parts(P,PD) Others
Information:
start by:a) remove oil pump1. Check the identification on the connecting rods and caps as to their location in the engine. The caps must be installed in original positions in the engine.2. Turn the crankshaft until two of the pistons are at bottom center. 3. Remove connecting rod caps (1) from the connecting rods. Remove the lower half of the bearings from the caps.
Be careful not to damage the crankshaft journals. Do not turn the crankshaft while any of the connecting rod caps are removed.
4. Push the connecting rod away from the crankshaft and remove the upper half of the bearings from the connecting rods.5. Make sure the surface of the connecting rod where the bearings make contact is clean and free of dirt.
Make sure the tabs on the bearings are in alignment with the notches in the connecting rods and caps.
6. Install the upper half of new bearings in the connecting rods.7. Pull the connecting rod down slowly on the crankshaft.
Make sure the surfaces where the bearings make contact in the caps are clean and free of dirt.
8. Install new bearings (2) in the caps. Make sure the tabs on the bearings are in alignment with the notches in the caps.9. Put clean engine oil on the threads of the bolts in the connecting rods.10. Check the bearing clearance with Plastigage (A) as follows: a) Make sure the numbers on the caps and connecting rods are the same and are on the same respective side. If new connecting rods are installed, put the cylinder number on the rods and caps.b) Put the caps and plastigage (A) in the correct position on the connecting rods. Install the nuts that hold them.c) Tighten the two nuts evenly to a torque of 60 6 lb.ft. (81.3 8.1 N m). Put a mark on each nut and tighten the nuts 120° more from the marks. d) Remove the caps from the connecting rods and Plastigage (A). Measure the thickness of the Plastigage. The connecting rod bearing clearance must be .0028 to .0066 in. (0.071 to 0.168 mm) for new bearings.e) Put clean engine oil in the bearing caps and install them again. Follow the tightening procedure in Step 10.f) Do Steps 1 through 10 for the other connecting rod bearings.end by:a) install oil pump
Be careful not to damage the crankshaft journals. Do not turn the crankshaft while any of the connecting rod caps are removed.
4. Push the connecting rod away from the crankshaft and remove the upper half of the bearings from the connecting rods.5. Make sure the surface of the connecting rod where the bearings make contact is clean and free of dirt.
Make sure the tabs on the bearings are in alignment with the notches in the connecting rods and caps.
6. Install the upper half of new bearings in the connecting rods.7. Pull the connecting rod down slowly on the crankshaft.
Make sure the surfaces where the bearings make contact in the caps are clean and free of dirt.
8. Install new bearings (2) in the caps. Make sure the tabs on the bearings are in alignment with the notches in the caps.9. Put clean engine oil on the threads of the bolts in the connecting rods.10. Check the bearing clearance with Plastigage (A) as follows: a) Make sure the numbers on the caps and connecting rods are the same and are on the same respective side. If new connecting rods are installed, put the cylinder number on the rods and caps.b) Put the caps and plastigage (A) in the correct position on the connecting rods. Install the nuts that hold them.c) Tighten the two nuts evenly to a torque of 60 6 lb.ft. (81.3 8.1 N m). Put a mark on each nut and tighten the nuts 120° more from the marks. d) Remove the caps from the connecting rods and Plastigage (A). Measure the thickness of the Plastigage. The connecting rod bearing clearance must be .0028 to .0066 in. (0.071 to 0.168 mm) for new bearings.e) Put clean engine oil in the bearing caps and install them again. Follow the tightening procedure in Step 10.f) Do Steps 1 through 10 for the other connecting rod bearings.end by:a) install oil pump
Have questions with 134112-3100?
Group cross 134112-3100 ZEXEL
Isuzu
134112-3100
9 411 611 973
1156430150
COMPRESSION SPRING
Mitsubishi
134112-3100
9 411 611 973
ME755579
COMPRESSION SPRING
Nissan-Diesel
134112-3100
9 411 611 973
16765NY000
COMPRESSION SPRING