Information coiled spring
BOSCH
9 421 614 456
9421614456
ZEXEL
159368-9600
1593689600
HINO
223413990A
223413990a

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
159368-9600
9 421 614 456
223413990A HINO
COILED SPRING
C 14GH SPRING GOV
C 14GH SPRING GOV
159368-9600
9 421 614 456
S223413990 HINO
COILED SPRING
A C 14GH SPRING GOV
A C 14GH SPRING GOV
159368-9600
9 421 614 456
19131Z9511 NISSAN-DIESEL
COILED SPRING
C 14GH SPRING GOV
C 14GH SPRING GOV
Information:
2. Remove bolts (3) from cover (1). Remove bolt and washer (2) and remove tube and adapter (4). 3. Remove adapter (5) from tube (4). Remove four O-ring seals (6) from tube (4). 4. Remove four bolts (7), elbow (9) and two adapters (8). 5. Remove four bolts (11), elbow (12), two adapters (10) and pipe (13). 6. Remove twenty-four bolts (15). Remove aftercooler cover (14). 7. Remove aftercooler core (16) from aftercooler housing (17). 8. Remove O-ring seals (19) and gaskets (18) if necessary. The following steps are for the installation of the aftercooler core.9. Clean and inspect all parts. Make a replacement of the parts that are worn or damaged. Lubricate O-ring seals with clean oil at assembly.10. Install O-ring seals (19). Fasten gaskets (18) to both sides of the aftercooler core flange with 5H2471 Cement.11. Install aftercooler core (16) in the aftercooler housing with the end that has the identification "Jacket Water, Fresh Air" or "Treated Water, Fresh Air" toward the water inlet end of the aftercooler housing.12. Install cover (14) on aftercooler housing (17).
To prevent damage to the aftercooler core, tighten the bolts that hold the aftercooler core before tightening the bolts that hold the adapters.
13. Tighten the aftercooler core cover bolts to a torque of 25 7 N m (18 5 lb. ft.). Tighten the bolts again after the engine is operated to a torque of 25 7 N m (18 5 lb. ft.).14. Install the gaskets and adapters (10) on the aftercooler housing. 15. Put O-ring seals (20) on pipe (13) and install pipe (13) into elbow (21).16. Install elbow (12) on pipe (13). Put a gasket between the adapters and elbow (12). Install bolts (11).17. Install gaskets and adapters (8) on the aftercooler housing. Install a gasket and elbow (9). Install bolts (7).18. Install O-ring seals (6) on tube (4). Install adapter (5) on tube (4).19. Install the gasket, adapter and tube (4). Install washer and bolt (2). Install the gasket and cover (1). Tighten bolts (3) to 23 4 N m (17 3 lb. ft.).20. Fill the engine with oil to the correct level. See the Maintenance Manual.
To prevent damage to the aftercooler core, tighten the bolts that hold the aftercooler core before tightening the bolts that hold the adapters.
13. Tighten the aftercooler core cover bolts to a torque of 25 7 N m (18 5 lb. ft.). Tighten the bolts again after the engine is operated to a torque of 25 7 N m (18 5 lb. ft.).14. Install the gaskets and adapters (10) on the aftercooler housing. 15. Put O-ring seals (20) on pipe (13) and install pipe (13) into elbow (21).16. Install elbow (12) on pipe (13). Put a gasket between the adapters and elbow (12). Install bolts (11).17. Install gaskets and adapters (8) on the aftercooler housing. Install a gasket and elbow (9). Install bolts (7).18. Install O-ring seals (6) on tube (4). Install adapter (5) on tube (4).19. Install the gasket, adapter and tube (4). Install washer and bolt (2). Install the gasket and cover (1). Tighten bolts (3) to 23 4 N m (17 3 lb. ft.).20. Fill the engine with oil to the correct level. See the Maintenance Manual.
Have questions with 159368-9600?
Group cross 159368-9600 ZEXEL
Hino
159368-9600
9 421 614 456
223413990A
COILED SPRING
159368-9600
9 421 614 456
S223413990
COILED SPRING
Nissan-Diesel
159368-9600
9 421 614 456
19131Z9511
COILED SPRING