154200-5500 ZEXEL 9 421 610 551 BOSCH BUSHING 9421610551 1542005500 1157294350


 

Information bushing

BOSCH 9 421 610 551 9421610551
ZEXEL 154200-5500 1542005500
ISUZU 1157294350 1157294350
154200-5500 BUSHING
Rating:
80
Buy BUSHING 154200-5500 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
154200-5500 
154200-5501 
9 421 610 551 
1157294350  ISUZU
BUSHING
* C
154200-5500 
154200-5501 
9 421 610 551 
223221640A  HINO
BUSHING
* C
154200-5500 
154200-5501 
9 421 610 551 
ME704522  MITSUBISHI
BUSHING
* C
154200-5500 
154200-5501 
9 421 610 551 
1927799009  NISSAN-DIESEL
BUSHING
* C




Information:


Install the pump cover onto the pump housing. Tighten the four middle bolts. Then, tighten the end bolts in a crisscross pattern. Tighten the bolts to a torque of 10.2 N m (90 lb in).Note: Make sure that the gasket is in place between the housing and the cover.
Repeat Step 1 and Step 2 in order to confirm the electrical connection for the pump coil was not damaged during the removal of the pump cover.
Install the oil inlet line adapter, inlet line, and harness connector to the pump.Note: After the HEUI pump is replaced or reassembled, the engine must be cranked for an extended length of time to fill the pump with oil.Note: Clear any diagnostic or event codes that activated during the initial start-up.
If the engine would not start before inspecting for debris and no debris was found in the HEUI pump, return to Step D in the diagnostic flow chart.If the engine would start before inspecting for debris and no debris was found in the HEUI pump, return to Step L in the diagnostic flow chart.If the pump is to be replaced, complete the checklist form in Special Instruction, REHS5031 that is provided with the service replacement part and insert the completed form back into the box containing the part that is being returned. Proceed to the section of this instruction titled "Oil Rail Cleaning Procedure" for the correct engine size that is being serviced.Oil Rail Cleaning Procedure For the C7 Engine
Illustration 12 g02702636
C7 Cylinder Head
Illustration 13 g02708256
The oil and fuel passages are the same for both the C7 and C9.
(6) Oil Rail for a HEUI fuel system
(7) Oil passage to injector bore
(8) Fuel passage
(9) Injector bore Note: Contain any oil and cleaner that will flow from the cylinder and the lines during the following process. Properly dispose of the oil and contaminated cleaner when work is complete.
Remove fuel injectors. Refer to Disassembly and Assembly for specific machine.
Install six plugs 9U-7080 Tapered Cap/Plug into the lower injector bores. The plugs will prevent oil, cleaners, and debris from entering the cylinders.
Remove the plugs from the front and rear of the cylinder head main oil gallery
Remove the pressure sensor from the cylinder head. Protect the sensor.
Clean out the two rail drain holes by removing their plugs and using the brake cleaner and long squirting straw to flush these passages to the oil rail.
Using the solvent gun with and without the

Have questions with 154200-5500?





Group cross 154200-5500 ZEXEL

Isuzu 

154200-5500  

154200-5501 
9 421 610 551 
1157294350 
BUSHING

Hino 

154200-5500  

154200-5501 
9 421 610 551 
223221640A 
BUSHING

Mitsubishi 

154200-5500  

154200-5501 
9 421 610 551 
ME704522 
BUSHING

Nissan-Diesel 

154200-5500  

154200-5501 
9 421 610 551 
1927799009 
BUSHING

Isuzu 

9 421 611 431 
1157294351 
BUSHING

Hino 

9 421 611 431 
223221641A 
BUSHING

Mitsubishi 

9 421 611 431 
ME730490 
BUSHING

Nissan-Diesel 

9 421 611 431 
1912399013 
BUSHING
Back to top