Information bleeder screw
BOSCH
9 421 612 897
9421612897
ZEXEL
154013-1800
1540131800
ISUZU
1157792450
1157792450

Rating:
Include in ###:
Number on scheme 173B
1059230020
as BLEEDER SCREW
1059230611
as BLEEDER SCREW
M8P1.25L49
1059230620
as BLEEDER SCREW
1059230770
as BLEEDER SCREW
M8P1.25L49
1059230802
as BLEEDER SCREW
Cross reference number
Zexel num
Bosch num
Firm num
Name
154013-1800
9 421 612 897
1157792450 ISUZU
BLEEDER SCREW
C 14GJ BOLT GOV
C 14GJ BOLT GOV
154013-1800
9 421 612 897
223961380A HINO
BLEEDER SCREW
C 14GJ BOLT GOV
C 14GJ BOLT GOV
154013-1800
9 421 612 897
S223961380A HINO
BLEEDER SCREW
A C 14GJ BOLT GOV
A C 14GJ BOLT GOV
154013-1800
9 421 612 897
ME738116 MITSUBISHI
BLEEDER SCREW
C 14GJ BOLT GOV
C 14GJ BOLT GOV
154013-1800
9 421 612 897
1938299414 NISSAN-DIESEL
BLEEDER SCREW
C 14GJ BOLT GOV
C 14GJ BOLT GOV
Information:
USE FUEL CONSUMPTION, SERVICE HOURS OR TIME INTERVAL, WHICHEVER OCCURS FIRST.Daily
Walk-Around Inspection - Inspect engine, radiator and generator/control panel for dirt & debris, moisture, foreign objects, loose or broken fittings and wires, guards and components. Repair as necessary Engine Crankcase - Check oil level Cooling System - Check coolant level, Check for proper operation of coolant heater Air Cleaner Indicator - Check Air Starting Motor (If Equipped) - Check level; Drain water SR4 Generator - Check frequency (rpm) and generated voltage for proper settings and stability; record readingsEvery 250 Hours or 25 000 L (6500 gal) of Fuel*
Scheduled Oil Sampling (S O S)** - Obtain Engine Oil and Filters - Replace Fuel System - Drain water & sediment from tank; Replace final filter/Clean primary filter Cooling System - Test for coolant additive concentration; Add liquid coolant additive; Clean radiator fins Crankcase Breathers - Clean Batteries - Clean/Inspect and check electrolyte level Belts, Hoses and Clamps - Inspect/Check Engine Air Cleaners - Clean/Replace SR4 Generator - Check space heater (if equipped) Engine Speed Sensors (Magnetic Pickup) - Inspect/Clean at first oil change Valve Lash** - Check/Adjust at first oil changeEvery 1000 Hours or 100 000 L (26,000 gal) of Fuel*
Engine Protection Controls - Inspect for proper operation SR4 Generator - Check windings and record megohmeter readings (Refer to SEHS9124)Every 3000 Hours or 300 000 L (78,000 gal) of Fuel*
Engine Valve Lash - Check/Adjust, Inspect valve rotators Turbocharger - Inspect for proper operation Engine Mounts and Crankshaft Vibration Damper - Inspect/Check Cooling System - Clean/Flush/Change coolant and replace thermostat SR4 Generator - Lubricate bearings (Refer to SEBU6150) PAR Analysis - ObtainEvery 5000 Hours or 500 000 L (130,000 gal) of Fuel*
Fuel Injection Nozzles - Test/Exchange Starting Motor and Alternator - Inpect for proper operation Turbochargers - Inspect/Rebuild or Exchange Jacket Water Pump - Inspect/Rebuild or Exchange Engine Speed Sensors (Magnetic Pickup) - Inspect/CleanOverhaul Every 10,000 Hours or 1 000 000 L (260,000 gal) of Fuel*
Cylinder Heads, Oil Pump, Fuel Transfer Pump - Inspect/Rebuild or Exchange Piston Rings, Main Bearings, Rod Bearings, Valve Rotators and Crankshaft Seals - Install new Fuel Injection Nozzles and Fuel Injection Pump - Test Connecting Rods, Pistons, Cylinder Liners, Crankshaft, Camshaft, Cam Bearings, Damper, Fuel Pump Camshaft, Cam Followers and Fuel Racks - Inspect/Replace Gear Train Gears & Bushings and Driven Unit Alignment Oil Cooler and Aftercooler Core - Clean/Test Coolant Analysis - Obtain SR4 Generator - Inspect/Clean windings*First Perform Previous Service Hour Items Caterpillar suggests that fuel consumption be used as the preferred method of determining maintenance intervals. Fuel consumption/Hours to Overhaul interval will vary depending on the proper application of your engine rating and maintenance practices.
Walk-Around Inspection - Inspect engine, radiator and generator/control panel for dirt & debris, moisture, foreign objects, loose or broken fittings and wires, guards and components. Repair as necessary Engine Crankcase - Check oil level Cooling System - Check coolant level, Check for proper operation of coolant heater Air Cleaner Indicator - Check Air Starting Motor (If Equipped) - Check level; Drain water SR4 Generator - Check frequency (rpm) and generated voltage for proper settings and stability; record readingsEvery 250 Hours or 25 000 L (6500 gal) of Fuel*
Scheduled Oil Sampling (S O S)** - Obtain Engine Oil and Filters - Replace Fuel System - Drain water & sediment from tank; Replace final filter/Clean primary filter Cooling System - Test for coolant additive concentration; Add liquid coolant additive; Clean radiator fins Crankcase Breathers - Clean Batteries - Clean/Inspect and check electrolyte level Belts, Hoses and Clamps - Inspect/Check Engine Air Cleaners - Clean/Replace SR4 Generator - Check space heater (if equipped) Engine Speed Sensors (Magnetic Pickup) - Inspect/Clean at first oil change Valve Lash** - Check/Adjust at first oil changeEvery 1000 Hours or 100 000 L (26,000 gal) of Fuel*
Engine Protection Controls - Inspect for proper operation SR4 Generator - Check windings and record megohmeter readings (Refer to SEHS9124)Every 3000 Hours or 300 000 L (78,000 gal) of Fuel*
Engine Valve Lash - Check/Adjust, Inspect valve rotators Turbocharger - Inspect for proper operation Engine Mounts and Crankshaft Vibration Damper - Inspect/Check Cooling System - Clean/Flush/Change coolant and replace thermostat SR4 Generator - Lubricate bearings (Refer to SEBU6150) PAR Analysis - ObtainEvery 5000 Hours or 500 000 L (130,000 gal) of Fuel*
Fuel Injection Nozzles - Test/Exchange Starting Motor and Alternator - Inpect for proper operation Turbochargers - Inspect/Rebuild or Exchange Jacket Water Pump - Inspect/Rebuild or Exchange Engine Speed Sensors (Magnetic Pickup) - Inspect/CleanOverhaul Every 10,000 Hours or 1 000 000 L (260,000 gal) of Fuel*
Cylinder Heads, Oil Pump, Fuel Transfer Pump - Inspect/Rebuild or Exchange Piston Rings, Main Bearings, Rod Bearings, Valve Rotators and Crankshaft Seals - Install new Fuel Injection Nozzles and Fuel Injection Pump - Test Connecting Rods, Pistons, Cylinder Liners, Crankshaft, Camshaft, Cam Bearings, Damper, Fuel Pump Camshaft, Cam Followers and Fuel Racks - Inspect/Replace Gear Train Gears & Bushings and Driven Unit Alignment Oil Cooler and Aftercooler Core - Clean/Test Coolant Analysis - Obtain SR4 Generator - Inspect/Clean windings*First Perform Previous Service Hour Items Caterpillar suggests that fuel consumption be used as the preferred method of determining maintenance intervals. Fuel consumption/Hours to Overhaul interval will vary depending on the proper application of your engine rating and maintenance practices.
Have questions with 154013-1800?
Group cross 154013-1800 ZEXEL
Isuzu
154013-1800
9 421 612 897
1157792450
BLEEDER SCREW
Hino
154013-1800
9 421 612 897
223961380A
BLEEDER SCREW
154013-1800
9 421 612 897
S223961380A
BLEEDER SCREW
Mitsubishi
154013-1800
9 421 612 897
ME738116
BLEEDER SCREW
Nissan-Diesel
154013-1800
9 421 612 897
1938299414
BLEEDER SCREW