152113-0200 ZEXEL 9 441 610 198 BOSCH BEARING PIN 9441610198 1521130200 9813514040


 

Information bearing pin

BOSCH 9 441 610 198 9441610198
ZEXEL 152113-0200 1521130200
ISUZU 9813514040 9813514040
152113-0200 BEARING PIN
Rating:
46
Buy BEARING PIN 152113-0200 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Cross reference number

Zexel num
Bosch num
Firm num
Name
152113-0200 
9 441 610 198 
9813514040  ISUZU
BEARING PIN
C 14GD PIN F/P
152113-0200 
9 441 610 198 
6033150140  HINO
BEARING PIN
C 14GD PIN F/P
152113-0200 
9 441 610 198 
1665399900  NISSAN-DIESEL
BEARING PIN
C 14GD PIN F/P




Information:


Illustration 31 g00295348
(11) Rotating Group. (15) Shaft.
Install the rotating group (11) .
Position the housing so that the internal end of the shaft (15) is angled downward.
Slide the rotating group (11) over the shaft (15) and into the housing. Ensure that the shoes of the rotating group (11) are seated against the yoke.
Illustration 32 g00295349
(34) Pins
Once the rotating group is installed, turn the rotating group in order to ensure that the three pins (34) are still in the special notches. If the rotating group jams, the pins (34) need to be reinserted into the proper position. The three pins in the rotating group are held in the special notches with a "C" clip retaining ring. The "C" clip applies force against the inside diameter of the rotating group's cylinder block in order to hold the pins in position. See Illustration 32.
Illustration 33 g00295352
(7) Valve Block. (9) Housing Gasket. (35) Large Middle Hole.
Install the housing gasket (9) .
Moderately oil the face of the valve block (7) with clean engine oil. Place the control piston onto the control shaft.
Install the valve block (7) .
Place a finger over the large middle hole (35) in the mounting surface of the valve block (7) in order to create a vacuum. This will hold the control piston in place while you are installing the valve block (7) .
Ensure that the housing gasket (9) is not damaged while you are aligning the valve block (7) to the pins in the pump housing.
Illustration 34 g00295353
(7) Valve Block. (8) Bolts.
Start the bolts (8) in the valve block (7) by hand.
Torque the bolts (8) by alternating from all four sides. Torque the bolts (8) in the corners first. Tighten the bolts (8) to a torque of 27 2 N m (20 1 lb ft).
Illustration 35 g00295295
(5) O-Ring Seals. (6) O-Ring Seals.
Install the four O-Ring seals (5) on the bottom side of the adapter.
Install the four O-Ring seals (6) on the two housings.
Illustration 36 g00295294
(3) Compensator. (4) Bolts.
Install the compensator (3) and the adapter as a unit vertically so that the O-Ring seals are not damaged. Tighten the bolts (4) to a torque of 7.45 .65 N m (65.94 5.75 lb in).
Moderately oil the shaft seal.
Illustration 37 g00295354
(25) Shaft Seal. (36) FT-2608 Bearing Installation Tool .Note: Step 20 through Step 22 defines the procedure for the installation of the shaft seal. These steps should be followed precisely. The shaft seal should be placed barely below the face of the housing. The snap ring should then be positioned against the seal. Both the snap ring and the seal should be driven into the bore together until the snap ring seats in the groove.
Use the FT-2608 Bearing Installation Tool (36) to lower the shaft seal (25) below the edge of the bore.
Place the snap ring against the shaft seal below the edge of the bore.
Illustration 38 g00295356
(25) Shaft Seal. (26) Snap Ring. (36) FT-2608 Bearing Installation Tool .
Use the FT-2608 Bearing Installation Tool (36) in order to lower the shaft seal (25)

Have questions with 152113-0200?





Group cross 152113-0200 ZEXEL

Isuzu 

152113-0200  
9 441 610 198 
9813514040 
BEARING PIN

Hino 

152113-0200  
9 441 610 198 
6033150140 
BEARING PIN

Nissan-Diesel 

152113-0200  
9 441 610 198 
1665399900 
BEARING PIN
Back to top