105671-0490 ZEXEL 9 420 615 212 BOSCH AUTOM. ADVANCE MECHANISM 9420615212 1056710490 1681017d01


 

Information autom. advance mechanism

BOSCH 9 420 615 212 9420615212
ZEXEL 105671-0490 1056710490
NISSAN 1681017D01 1681017d01
105671-0490 AUTOM. ADVANCE MECHANISM
Rating:
19
Buy AUTOM. ADVANCE MECHANISM 105671-0490 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

1. [1] 156700-1600 FLANGE BUSHING
2. [1] 156718-3320 FLYWEIGHT ASSEMBLY
2/1. [2] 156702-7420 FLYWEIGHT
2/1. [2] 156702-7420 FLYWEIGHT
2/2. [4] 156707-0100 SLOTTED WASHER
2/2. [4] 156707-0100 SLOTTED WASHER
2/3. [4] 156707-0000 SLOTTED WASHER
2/3. [4] 156707-0000 SLOTTED WASHER
2/4. [4] 156715-2000 COMPRESSION SPRING
2/4. [4] 156715-2000 COMPRESSION SPRING
2/5. [4] 156709-0200 LOCKING WASHER
2/5. [4] 156709-0200 LOCKING WASHER
2/6/1. [0] 156708-3600 SHIM D15.5&11.5T0.1
2/6/1. [0] 156708-3700 SHIM D15.5&11.5T0.2
2/6/1. [0] 156708-3800 SHIM D15.5&11.5T0.3
2/6/1. [0] 156708-3900 SHIM D15.5&11.5T0.4
2/6/1. [0] 156708-4000 SHIM D15.5&11.5T0.5
2/6/1. [0] 156708-4100 SHIM D15.5&11.5T0.6
2/6/1. [0] 156708-4200 SHIM D15.5&11.5T0.7
2/6/1. [0] 156708-4300 SHIM D15.5&11.5T0.8
2/6/1. [0] 156708-4400 SHIM D15.5&11.5T0.9
2/6/1. [0] 156708-4500 SHIM D15.5&11.5T1.0
2/6/1. [0] 156708-4500 SHIM D15.5&11.5T1.0
2/7. [2] 156706-0000 PIN
5. [4] 156715-1900 COMPRESSION SPRING
5. [4] 156715-1900 COMPRESSION SPRING
5B. [4] 156715-2100 COMPRESSION SPRING
5C. [4] 156715-2200 COMPRESSION SPRING
8. [2] 156703-0500 ECCENTRIC DISC
8. [2] 156703-0500 ECCENTRIC DISC
9. [2] 156703-0600 ECCENTRIC DISC
9. [2] 156703-0600 ECCENTRIC DISC
11. [1] 156701-0020 FLANGE BUSHING
12. [1] 156708-0000 SHIM D46.0&34.1T2.85
13/1. [0] 156708-0100 SHIM D46.0&34.1T0.1
13/1. [0] 156708-0200 SHIM D46.0&34.1T0.12
13/1. [0] 156708-0300 SHIM D46.0&34.1T0.14
13/1. [0] 156708-0400 SHIM D46.0&34.1T0.16
13/1. [0] 156708-0500 SHIM D46.0&34.1T0.18
13/1. [0] 156708-0600 SHIM D46.0&34.1T0.2
13/1. [0] 156708-0700 SHIM D46.0&34.1T0.3
16. [1] 016020-3420 LOCKING WASHER
17. [1] 156709-1000 LOCKING WASHER
18. [1] 131325-2300 UNION NUT
19/1. [0] 156708-1800 SHIM D104&26.2T1.9
19/1. [0] 156708-1900 SHIM D104&26.2T2.0
19/1. [0] 156708-2000 SHIM D104&26.2T2.1
20. [1] 016020-2620 LOCKING WASHER
21. [1] 156221-7500 TOOTHED GEAR
22. [6] 139006-5600 BLEEDER SCREW

Include in #1:

101401-9490 as AUTOM. ADVANCE MECHANIS

Cross reference number

Zexel num
Bosch num
Firm num
Name
105671-0490 
9 420 615 212 
NP-EP/SCDM850-1500B5.5/R 
1681017D01  NISSAN
AUTOM. ADVANCE MECHANISM
K




Information:

Start By:a. remove valve covers 1. Remove bolts (1) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (2). 2. Use tool (A) to loosen fuel injection line (3) from fuel injection nozzle (4). 3. Use tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (3). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (5) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (6). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (7). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (8) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies And Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (8) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb.) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20° to 30° (1/3 to 1/2 of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position, and tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.). Install original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (7). 4. Put rocker shaft assemblies (6) in position on the cylinder head assembly.5. Put clean engine oil on the threads of bolts (5) that hold the shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb.ft.). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb.ft.). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb.ft.).
Do no cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (3). Tighten the fuel injection line adapter nuts (9) to a torque of 40 7 N m (30 5 lb.ft.) with tool (B).7. Tighten fuel injection line nut (10) to a torque of 40 7 N m (30 5 lb.ft.) with tool (A).8. Make adjustments to the valves until the intake valve clearance is 0.38 mm (.015 in.) and the exhaust valve clearance is 0.76 mm (.030 in.). See Valve Clearance Setting in Testing And Adjusting. Tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.) and

Have questions with 105671-0490?





Group cross 105671-0490 ZEXEL

Mazda 

9 420 615 113 
NP-EP/SCDM800-1100B1.5/R 
TMSK13TA0 
AUTOM. ADVANCE MECHANISM

Nissan-Diesel 

9 420 615 903 
NP-EP/SCDM850-1500B3.5/R 
168100T315 
AUTOM. ADVANCE MECHANISM

Mazda 

9 420 616 880 
NP-EP/SCDM1200-1400B2.5/R 
16810Z5674 
AUTOM. ADVANCE MECHANISM
9 420 615 126 
 
AUTOM. ADVANCE MECHANISM
9 420 616 274 
NP-EP/SCDM1150-1700B4.5/R 
 
AUTOM. ADVANCE MECHANISM
9 420 615 307 
NP-EP/SCDM850-1500B5/R 
 
AUTOM. ADVANCE MECHANISM
 
 

Mazda 

9 420 615 127 
NP-EP/SCDM900-1700B3.5/R 
TF6113TA0 
AUTOM. ADVANCE MECHANISM
9 420 615 128 
 
AUTOM. ADVANCE MECHANISM

Nissan 

105671-0490  
9 420 615 212 
NP-EP/SCDM850-1500B5.5/R 
1681017D01 
AUTOM. ADVANCE MECHANISM
Back to top