105636-0970 ZEXEL 9 420 616 145 BOSCH AUTOM. ADVANCE MECHANISM 9420616145 1056360970


 

Information autom. advance mechanism

BOSCH 9 420 616 145 9420616145
ZEXEL 105636-0970 1056360970
105636-0970 AUTOM. ADVANCE MECHANISM
Rating:
12
Buy AUTOM. ADVANCE MECHANISM 105636-0970 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

1. [1] 156300-0822 TIMING-DEVICE HOUSING
1. [1] 156300-0822 TIMING-DEVICE HOUSING
2. [2] 156305-0520 FLYWEIGHT
2. [2] 156305-0520 FLYWEIGHT
2. [2] 156305-0520 FLYWEIGHT
2. [2] 156305-0520 FLYWEIGHT
3. [1] 156302-8520 FLANGE BUSHING
3. [1] 156302-8520 FLANGE BUSHING
4. [2] 156310-0000 SLOTTED WASHER
4. [2] 156310-0000 SLOTTED WASHER
5/1. [0] 029310-8520 SHIM D14&8.4T0.2
5/1. [0] 029310-8530 SHIM D14&8.4T0.4
5/1. [0] 029310-8540 SHIM D14&8.4T0.5
5/1. [0] 029310-8550 SHIM D14&8.4T0.6
5/1. [0] 029310-8560 SHIM D14&8.4T0.7
5/1. [0] 029310-8680 SHIM D14&8.4T1.0
5/1. [0] 139408-0000 SHIM D14&8.4T0.30
5/1. [0] 139408-0100 SHIM D14&8.4T0.80
5/1. [0] 139408-0100 SHIM D14&8.4T0.80
5/1. [0] 139408-0200 SHIM D14&8.4T0.90
5/1. [0] 139408-0300 SHIM D14&8.4T0.10
5/1. [0] 139408-0500 SHIM D14&8.4T1.5
5/1. [0] 139408-0600 SHIM D14&8.4T2.0
6. [2] 156321-1600 COMPRESSION SPRING
6. [2] 156321-1600 COMPRESSION SPRING
7. [2] 156310-0000 SLOTTED WASHER
7. [2] 156310-0000 SLOTTED WASHER
8/1. [0] 029310-8520 SHIM D14&8.4T0.2
8/1. [0] 029310-8530 SHIM D14&8.4T0.4
8/1. [0] 029310-8540 SHIM D14&8.4T0.5
8/1. [0] 029310-8550 SHIM D14&8.4T0.6
8/1. [0] 029310-8560 SHIM D14&8.4T0.7
8/1. [0] 029310-8680 SHIM D14&8.4T1.0
8/1. [0] 139408-0000 SHIM D14&8.4T0.30
8/1. [0] 139408-0100 SHIM D14&8.4T0.80
8/1. [0] 139408-0200 SHIM D14&8.4T0.90
8/1. [0] 139408-0200 SHIM D14&8.4T0.90
8/1. [0] 139408-0300 SHIM D14&8.4T0.10
8/1. [0] 139408-0500 SHIM D14&8.4T1.5
8/1. [0] 139408-0600 SHIM D14&8.4T2.0
9. [2] 156321-1600 COMPRESSION SPRING
9. [2] 156321-1600 COMPRESSION SPRING
10. [2] 156312-0000 BUSHING
10. [2] 156312-0000 BUSHING
10. [2] 156312-0000 BUSHING
10. [2] 156312-0000 BUSHING
11/1. [1] 156313-0000 ROLLER D23.9
11/1. [1] 156313-0100 ROLLER D24.0
11/1. [1] 156313-0200 ROLLER D24.1
11/1. [1] 156313-0300 ROLLER D24.2
11/1. [1] 156313-0300 ROLLER D24.2
11/1. [1] 156313-0300 ROLLER D24.2
11/1. [1] 156313-0300 ROLLER D24.2
12. [2] 029301-2250 PLAIN WASHER D23&12T3.5
12. [2] 029301-2250 PLAIN WASHER D23&12T3.5
12. [2] 029301-2250 PLAIN WASHER D23&12T3.5
12. [2] 029301-2250 PLAIN WASHER D23&12T3.5
13. [2] 156317-0100 RETAINER
13. [2] 156317-0100 RETAINER
13. [2] 156317-0100 RETAINER
13. [2] 156317-0100 RETAINER
14. [1] 156315-0200 O-RING
14. [1] 156315-0200 O-RING
16. [1] 156308-0600 COVER
16. [1] 156308-0600 COVER
17. [1] 156309-0000 PACKING RING
17. [1] 156309-0000 PACKING RING
19. [2] 156319-0100 GASKET
19. [2] 156319-0100 GASKET
20. [2] 156633-4800 BLEEDER SCREW
20. [2] 156633-4800 BLEEDER SCREW
21. [1] 029331-0190 GASKET D14&10.2T1
21. [1] 029331-0190 GASKET D14&10.2T1
22. [1] 156316-0000 CAPSULE
22. [1] 156316-0000 CAPSULE
24. [1] 156314-0501 CAP
24. [1] 156314-0501 CAP
30. [1] 156322-0000 LOCKING WASHER
30. [1] 156322-0000 LOCKING WASHER
31. [1] 134325-0100 UNION NUT
31. [1] 134325-0100 UNION NUT
33. [2] 029311-0180 SHIM D14&10.1T0.3
34. [2] 029311-0190 SHIM D14&10.1T0.40

Include in #1:

106691-4001 as AUTOM. ADVANCE MECHANIS

Cross reference number

Zexel num
Bosch num
Firm num
Name
105636-0970 
9 420 616 145 
NP-EP/SP500-1050Z5RN96 
   
AUTOM. ADVANCE MECHANISM
K 14KD AUTOMATIC TIMER TIMER SP(Z) TIMER




Information:


CHECKING FLYWHEEL FACE RUNOUT4. The difference between the lowest and highest readings taken at all four points should not exceed .006 in. (0.15 mm), which is the maximum permissible flywheel face runout.Checking Flywheel Bore Runout
CHECKING FLYWHEEL BORE RUNOUT
1. 7H1945 Holding Rod. 2. 7H1645 Holding Rod. 3. 7H1942 Indicator. 4. 7H1940 Universal Attachment.Make tool setup from parts of the 8S2328 Dial Test Indicator Group.1. Mount the dial indicator and adjust it so the universal attachment contacts the flywheel bore as shown.2. Adjust the dial indicator to read .000 in. (0.0 mm) then take readings every 90° around the flywheel.3. The difference between the lowest and highest readings taken at all four points should not exceed .006 in. (0.15 mm), which is the maximum permissible flywheel bore runout. Flywheel clutch pilot bearing bore runout should not exceed .005 in. (0.13 mm).
CHECKING FLYWHEEL CLUTCH PILOT BEARING BOREElectrical System
Most of the testing of the electrical system can be done on the engine. The wiring insulation must be in good condition, the wire and cable connections clean and tight and the battery fully charged. If on the engine test shows a defect in a component, remove the component for more testing. The wire size, color and recommendations of length are given in the WIRING DIAGRAMS in SYSTEMS OPERATION.Battery
9S1990 Battery Charger Tester.The battery circuit is an electrical load on the charging unit. The load is variable because of the condition of the charge in the battery. Damage to the charging unit will result, if the connections, (either positive or negative) between the battery and charging unit are broken while the charging unit is charging. This is because the battery load is lost and there is an increase in charging voltage.High voltage will damage, not only the charging unit but also the regulator and other electrical components.
9S1990 BATTERY CHARGER TESTER
Never disconnect any charging unit circuit or battery circuit cable from battery when the charging unit is charging.
Load test a battery that does not hold a charge when in use. To do this, put a resistance, across the battery main connections (terminals). For a 6 volt battery, put a resistance of two times the ampere/hour rating of the battery. For a 12 volt battery, put a resistance of three times the ampere/hour rating. Let the resistance remove the charge (discharge the battery) for 15 seconds. Immediately test the battery voltage. A 6 volt battery in good condition will test 4.5 volts; a 12 volt battery in good condition will test 9 volts.The Special Instruction (GEG00058) with the 9S1990 Charger Tester gives the battery testing procedure.Charging System
Battery
The condition of charge in the battery at each regular inspection will show if the charging system is operating correctly. An adjustment is necessary when the battery is always in a low condition of charge or a large amount of water is needed (one ounce per cell per week or every 50 service hours).Test the charging units and voltage regulators on the engine, when possible, using wiring and components that are

Have questions with 105636-0970?





Group cross 105636-0970 ZEXEL

Mitsubishi 

 
ME726598 
AUTOM. ADVANCE MECHANISM
9 420 615 631 
ME059579 
AUTOM. ADVANCE MECHANISM
9 420 615 632 
NP-EP/SP950-1150Z5.5RN91 
ME717107 
AUTOM. ADVANCE MECHANISM

Nissan-Diesel 

 
1685196512 
AUTOM. ADVANCE MECHANISM

Mitsubishi 

9 420 616 814 
NP-EP/SP930-1100Z4RN93 
ME717203 
AUTOM. ADVANCE MECHANISM

Mitsubishi-Heav 

9 420 617 215 
3626507020 
AUTOM. ADVANCE MECHANISM

Nissan-Diesel 

 
1685197502 
AUTOM. ADVANCE MECHANISM
105636-0970  
9 420 616 145 
NP-EP/SP500-1050Z5RN96 
 
AUTOM. ADVANCE MECHANISM
 
 

 
 

Back to top