105614-3720 ZEXEL 9 420 616 761 BOSCH AUTOM. ADVANCE MECHANISM 9420616761 1056143720 16810z5708


 

Information autom. advance mechanism

BOSCH 9 420 616 761 9420616761
ZEXEL 105614-3720 1056143720
NISSAN-DIESEL 16810Z5708 16810z5708
105614-3720 AUTOM. ADVANCE MECHANISM
Rating:
64
Buy AUTOM. ADVANCE MECHANISM 105614-3720 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105614-3720 
9 420 616 761 
NP-EP/SA1140-1500B4R 
16810Z5708  NISSAN-DIESEL
AUTOM. ADVANCE MECHANISM
K 14KC AUTOMATIC TIMER TIMER SA TIMER




Information:

1. Remove tachometer drive (3) from transfer pump cover (4).2. Remove bolts (1). Separate cover (4) and pump body (2). 3. Remove lip-type seal (6) from the cover. Remove plug (5), the seal, spring and plunger (bypass valve) from the cover. 4. Remove nut (10) from shaft (7). Remove gear (9) and key (11).5. Remove shaft (7) and gear (8) as a unit. Remove gear (8) from drive shaft (7) with a press.6. Remove idler gear (12). 7. Remove bushing (14), two lip-type seals and the bottom bearing from pump body (2).8. Remove check valve (13).Assemble Fuel Transfer Pump
1. Install bushing (4) in body (3) with Tooling (B). The bushing must be .80 .50 mm (.031 .020 in) below the (gear) surface of the body.2. Install the check valve in the body with Tooling (A).3. Install lip-type seal (5) with Tooling (C). Install the seal until it is 26.19 .13 mm (1.031 .005 in) from the bottom (drive gear) surface of body (3) and with the lip toward bushing (4) as shown.4. Install lip-type seal (6) with Tooling (D). Install the seal until it is 14.2 0.5 mm (.559 .020 in) from the bottom (drive gear) surface of body (3) and with the lip away from seal (5) as shown.5. Install bearing (7) in body (3) with Tooling (E). The bearing must be even with the bottom (drive gear) surface of the pump body. 6. Heat gear (8) to a maximum temperature of 315° C (600° F). Install gear (8) on shaft (11) until dimension (X) is 49.71 0.25 mm (1.957 .010 in).7. Install the drive shaft and gear in body (3). Install the key, gear (10) and nut (9). Tighten the nut to a torque of 30 7 N m (22 5 lb ft).8. Install idler gear (12) in body (3).9. Install lip-type seal (2) with Tooling (C). Install the seal until it is 22.61 .05 mm (.890 .002 in) from the top surface of cover (1) with the lip toward the inside as shown. 10. Install plunger (14) (bypass valve), spring (15) and seal and plug (13) in pump cover (1). Tighten plug (13) to a torque of 37 4 N m (27 3 lb ft).
Do not let the liquid gasket enter the pump during application or assembly.
11. Put 7M-7260 Liquid Gasket Material on the surface of cover (1). Install cover (1) on pump body (3). The drive shaft must turn freely after the bolts that hold the transfer pump together are tightened.12. Install the tachometer drive on cover (1).End By:a. install fuel transfer pump

Have questions with 105614-3720?





Group cross 105614-3720 ZEXEL

Nissan-Diesel 

9 420 616 486 
1685195063 
AUTOM. ADVANCE MECHANISM
9 420 615 486 
NP-EP/SA1140-1500B4R 
16810Z5707 
AUTOM. ADVANCE MECHANISM
105614-3720  
9 420 616 761 
NP-EP/SA1140-1500B4R 
16810Z5708 
AUTOM. ADVANCE MECHANISM
9 420 617 097 
16810Z5709 
AUTOM. ADVANCE MECHANISM
9 420 615 888 
NP-EP/SA1000-1500B2R 
16810Z5710 
AUTOM. ADVANCE MECHANISM
9 420 615 889 
NP-EP/SA1000-1500B2R 
16810Z5765 
AUTOM. ADVANCE MECHANISM
9 420 615 109 
NP-EP/SA870-1400B2R 
1685195068 
AUTOM. ADVANCE MECHANISM
9 420 616 487 
NP-EP/SA500-1200B4R 
1685195066 
AUTOM. ADVANCE MECHANISM
9 420 615 838 
NP-EP/SA870-1400B2R 
1685195067 
AUTOM. ADVANCE MECHANISM
9 420 615 487 
NP-EP/SA1200-1500B1R 
16810Z5766 
AUTOM. ADVANCE MECHANISM
Back to top