Information auto;timing device
BOSCH
9 420 616 626
9420616626
ZEXEL
105691-3841
1056913841

Rating:
Scheme ###:
1. | [1] | 156995-2121 | AUTO;TIMING DEVICE |
1/1. | [1] | 156900-8400 | FLANGE BUSHING |
1/2. | [1] | 156901-7220 | TIMING-DEVICE HOUSING |
1/3. | [6] | 139006-2700 | BLEEDER SCREW |
1/5. | [2] | 156904-0700 | ECCENTRIC DISC |
1/5. | [2] | 156904-0700 | ECCENTRIC DISC |
1/6. | [2] | 156904-0100 | ECCENTRIC DISC |
1/6. | [2] | 156904-0100 | ECCENTRIC DISC |
1/7. | [1] | 156903-2620 | SLOTTED WASHER |
1/8. | [2] | 156907-3220 | PLATE |
1/8. | [2] | 156907-3220 | PLATE |
1/9. | [2] | 156910-2400 | PIN |
1/10. | [4] | 156908-6600 | COMPRESSION SPRING |
1/10. | [4] | 156908-6600 | COMPRESSION SPRING |
1/11. | [4] | 156909-0000 | SLOTTED WASHER |
1/11. | [4] | 156909-0000 | SLOTTED WASHER |
1/12. | [4] | 156707-0000 | SLOTTED WASHER |
1/12. | [4] | 156707-0000 | SLOTTED WASHER |
1/13. | [4] | 156913-7400 | LOCKING WASHER |
1/13. | [4] | 156913-7400 | LOCKING WASHER |
1/14. | [1] | 156905-1920 | CYLINDER |
1/15. | [2] | 156906-0300 | PUMP PLUNGER |
1/16. | [2] | 156906-0300 | PUMP PLUNGER |
1/17. | [1] | 156902-0820 | COVER |
1/17/3. | [1] | 139799-0100 | O-RING |
1/19. | [6] | 010235-0820 | HEX-SOCKET-HEAD CAP SCREW |
1/21. | [1] | 156913-0900 | CAPSULE |
1/35. | [4] | 156913-7300 | SHIM |
1/35. | [4] | 156913-7300 | SHIM |
2. | [1] | 479748-4400 | PULSE GENERATOR |
3. | [1] | 029201-6150 | UNION NUT |
4. | [1] | 139316-0000 | PLAIN WASHER D25&16.5T5 |
5. | [1] | 156913-7100 | PLATE |
6. | [2] | 020018-2070 | BLEEDER SCREW M8P1.25L20 7T |
8. | [2] | 014020-8140 | PLAIN WASHER D16&8.5T1.2 |
10. | [1] | 134563-2300 | WOODRUFF KEY |
11. | [1] | 156913-9600 | CAP |
12. | [1] | 139756-0000 | O-RING |
13. | [2] | 012206-1220 | FLAT-HEAD SCREW |
16. | [1] | 156809-0100 | UNION NUT |
17. | [1] | 156809-0000 | LOCKING WASHER |
Include in #1:
106671-5381
as AUTOM. ADVANCE MECHANIS
Cross reference number
Zexel num
Bosch num
Firm num
Name
105691-3841
9 420 616 626
AUTO;TIMING DEVICE
K 14KN VARIABLE TIMER TIMER V/T TIMER
K 14KN VARIABLE TIMER TIMER V/T TIMER
Information:
Group 2
1 - 6I0347 Bracket2 - 7C6591 Clamp2 - 7C7747 Clamp2 - 4B4274 Washer2 - 9N3388 Screw1 - 6I4813 Clamp Kit1 - 8T1296 Washer2 - 5P4939 Screw1 - 9Y3357 Clamp1 - 1029228 Clamp AssemblyGroup 3
2 - 5P4939 Screw1 - 9Y3357 Clamp1 - 1029228 Clamp AssemblyAction Required
See the attached procedure.
Service Claim Allowances
Parts Disposition
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Attach. (1-Rework Procedure)Rework Procedure
Refer to the following instructions and illustrations. Replace the existing fuel lines and their related parts with the new fuel line groups.
To insure correct clamp locations, install left and right fuel line groups as assembled. However, if clamps are removed, mark locations to insure correct positions when reassembling.
On the 992C Wheel Loader, it is necessary to remove the 6N8322 Air Outlet Tube Assembly to be able to install the right bank fuel line group.
Tighten the fuel line clamp screws to a torque of 2.25 N m (20 lb in). Do not over tighten. Use a 6V6069 Torque Screwdriver or similar tool to tighten the screws.
Group 1 Procedure
1. Clean and paint the new 6I0361 and 7E3539 Fuel Line Groups before proceeding to the job site.A) "Tape Off" the number 3, 5, and 6 fuel lines in the area of the tower clamp. (See Illustration 1 - Part 4 of 5, Section C-C)B) Install 5F2807 Plastic Caps and 2F2990 Plastic Plugs on the ends of the fuel lines.C) Clean and paint the fuel line groups.D) After drying completely, remove the tape. Do not remove the plastic caps and plugs until the fuel lines are ready to be installed on the engine. Transport the fuel line groups in their original boxes.2. Remove all mounting bolts from the fuel line brackets at the aftercooler housing. Except for the tower clamp assembly, new mounting bolts and washers will be used. Keep the washers. The washers may be needed later as spacers.3. A) Disassemble the tower clamp assembly behind the fuel injection pump. The 9Y3356 Clamp and 9Y3359 Clamp As. that form the tower clamp will be reused. (See Illustration 1 - Part 4 of 5, Section C-C)B) Disconnect the 2 line clamps from the 9Y3361 Bracket (Front V Bracket).C) Disconnect the 6 line clamps from the 7E5779 Bracket (Large V Bracket).4. Disconnect all the fuel lines at the fuel injection pump and at the adaptors in the valve cover bases.5. A) Remove the left and right side fuel line groups as separate assemblies.B) Remove the 9Y3361 Bracket (Front V Bracket). Replace it with a new 6I0347 Bracket.6. Remove the plastic caps and plugs from the fuel lines. Set the new 6I0361 Fuel Lines Group (left side) and the new 7E3539 Fuel Lines Group (right side) in place and hand tighten the fuel nuts. (See Illustration 1 - Part 1 of 5). If any of the ends of the individual fuel lines are not square with the bonnets in the fuel injection pump or with the adaptors in the valve cover bases, gently bend the lines
1 - 6I0347 Bracket2 - 7C6591 Clamp2 - 7C7747 Clamp2 - 4B4274 Washer2 - 9N3388 Screw1 - 6I4813 Clamp Kit1 - 8T1296 Washer2 - 5P4939 Screw1 - 9Y3357 Clamp1 - 1029228 Clamp AssemblyGroup 3
2 - 5P4939 Screw1 - 9Y3357 Clamp1 - 1029228 Clamp AssemblyAction Required
See the attached procedure.
Service Claim Allowances
Parts Disposition
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Attach. (1-Rework Procedure)Rework Procedure
Refer to the following instructions and illustrations. Replace the existing fuel lines and their related parts with the new fuel line groups.
To insure correct clamp locations, install left and right fuel line groups as assembled. However, if clamps are removed, mark locations to insure correct positions when reassembling.
On the 992C Wheel Loader, it is necessary to remove the 6N8322 Air Outlet Tube Assembly to be able to install the right bank fuel line group.
Tighten the fuel line clamp screws to a torque of 2.25 N m (20 lb in). Do not over tighten. Use a 6V6069 Torque Screwdriver or similar tool to tighten the screws.
Group 1 Procedure
1. Clean and paint the new 6I0361 and 7E3539 Fuel Line Groups before proceeding to the job site.A) "Tape Off" the number 3, 5, and 6 fuel lines in the area of the tower clamp. (See Illustration 1 - Part 4 of 5, Section C-C)B) Install 5F2807 Plastic Caps and 2F2990 Plastic Plugs on the ends of the fuel lines.C) Clean and paint the fuel line groups.D) After drying completely, remove the tape. Do not remove the plastic caps and plugs until the fuel lines are ready to be installed on the engine. Transport the fuel line groups in their original boxes.2. Remove all mounting bolts from the fuel line brackets at the aftercooler housing. Except for the tower clamp assembly, new mounting bolts and washers will be used. Keep the washers. The washers may be needed later as spacers.3. A) Disassemble the tower clamp assembly behind the fuel injection pump. The 9Y3356 Clamp and 9Y3359 Clamp As. that form the tower clamp will be reused. (See Illustration 1 - Part 4 of 5, Section C-C)B) Disconnect the 2 line clamps from the 9Y3361 Bracket (Front V Bracket).C) Disconnect the 6 line clamps from the 7E5779 Bracket (Large V Bracket).4. Disconnect all the fuel lines at the fuel injection pump and at the adaptors in the valve cover bases.5. A) Remove the left and right side fuel line groups as separate assemblies.B) Remove the 9Y3361 Bracket (Front V Bracket). Replace it with a new 6I0347 Bracket.6. Remove the plastic caps and plugs from the fuel lines. Set the new 6I0361 Fuel Lines Group (left side) and the new 7E3539 Fuel Lines Group (right side) in place and hand tighten the fuel nuts. (See Illustration 1 - Part 1 of 5). If any of the ends of the individual fuel lines are not square with the bonnets in the fuel injection pump or with the adaptors in the valve cover bases, gently bend the lines
Have questions with 105691-3841?
Group cross 105691-3841 ZEXEL
Mitsubishi
Nissan-Diesel
105691-3841
9 420 616 626
AUTO;TIMING DEVICE