105952-2480 ZEXEL 9 420 614 727 BOSCH ACTUATOR 9420614727 1059522480 1910696600


 

Information actuator

BOSCH 9 420 614 727 9420614727
ZEXEL 105952-2480 1059522480
NISSAN-DIESEL 1910696600 1910696600
105952-2480 ACTUATOR
Rating:
56
Buy ACTUATOR 105952-2480 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

1. [1] 159560-1802 GOVERNOR HOUSING
2. [10] 139006-4100 BLEEDER SCREW
3. [1] 029621-7050 PACKING RING
4. [1] 159564-0000 COILED SPRING
5. [1] 159564-4000 SLOTTED WASHER
6. [1] 159564-4100 SLOTTED WASHER
7. [1] 159564-7321 CONNECTOR
8. [1] 020105-1240 BLEEDER SCREW M5P0.8L12
9. [1] 159564-0501 PLATE
9B. [1] 159564-6500 PLATE
9C. [1] 159584-5200 PLATE
10. [1] 020105-1240 BLEEDER SCREW M5P0.8L12
11. [1] 159579-4020 ACTUATOR
11/1. [1] 159562-1820 PLATE;GOV.
11/2. [1] 159563-0020 STRAP
11/3. [1] 159563-1700 LEVER SHAFT
11/4. [2] 029311-0170 SHIM
11/4. [2] 029311-0170 SHIM
11/5. [2] 016500-0710 O-RING
11/5. [2] 016500-0710 O-RING
11/6. [2] 014011-0140 PLAIN WASHER D22&10.5T1.6
11/6. [2] 014011-0140 PLAIN WASHER D22&10.5T1.6
11/8. [1] 016010-0940 LOCKING WASHER
11/10. [4] 139006-9100 BLEEDER SCREW
11/11. [1] 159585-1920 RACK SENSOR
11/12. [4] 020105-2040 BLEEDER SCREW M5P0.8L20
11/17. [1] 159587-8620 CABLE SET
11/18. [4] 020106-1840 BLEEDER SCREW M6P1L18
11/19. [1] 134002-0200 ADAPTOR
11/21. [1] 159563-7120 CONTROL LEVER
11/22. [1] 159563-4800 COILED SPRING
11/23. [1] 159563-1800 BUSHING
11/24. [1] 014110-8440 LOCKING WASHER
11/25. [1] 013030-8140 UNION NUT M8P1.25H5
11/26. [1] 159563-1000 FLAT-HEAD SCREW
11/27. [1] 155615-1700 FLAT-HEAD SCREW
11/28. [2] 029240-6010 UNION NUT M6P1.0H5*
11/28. [2] 029240-6010 UNION NUT M6P1.0H5*
11/34. [1] 159563-8400 FLAT-HEAD SCREW
12. [2] 020106-4040 BLEEDER SCREW
13. [1] 159561-0400 GOVERNOR COVER
14. [4] 010006-7040 BLEEDER SCREW M6P1L70
15. [2] 010006-5540 BLEEDER SCREW M6P1L55 4T
16. [8] 014110-6440 LOCKING WASHER
16. [8] 014110-6440 LOCKING WASHER
16. [8] 014110-6440 LOCKING WASHER
17. [1] 159566-4401 GASKET
18. [1] 154390-0400 GASKET
19. [1] 154390-0500 GASKET
20. [1] 153021-6300 CAP
21. [1] 026524-3040 GASKET
22. [1] 029731-4680 EYE BOLT
27. [2] 139006-1300 BLEEDER SCREW M6P1L76
28. [1] 139008-1100 BLEEDER SCREW
900S. [1] 025803-1310 WOODRUFF KEY
901S. [1] 025803-1610 WOODRUFF KEY

Cross reference number

Zexel num
Bosch num
Firm num
Name
105952-2480 
9 420 614 727 
1910696600  NISSAN-DIESEL
ACTUATOR
K 14JD ACTUATOR GOV




Information:

Start By:a. remove valve covers Call out (1) and (2) are not used in this removal procedure. Call outs begin with number (3). 1. Remove bolts (3) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (4).
To prevent damage to the fuel injection nozzle, hold adapter assembly (5) in position at the of injection nozzle (6) when fuel line nut (7) is loosened or tightened.
2. Use Tool (A) and a 7/8 5P0328 Crow Foot ( in) to loosen the fuel injection line nut at the nozzle end. 3. Use Tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (8). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (9) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (10). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (11). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (12) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies & Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (1) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 1/31/2 20 to 30 degrees ( to of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position and tighten the locknut to a torque of 30 4 N m (22 3 lb ft). Install the original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (2). 4. Put rocker shaft assemblies (3) in position on the cylinder head assembly.5. Put clean engine oil on the threads of the bolts that hold the rocker shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb ft). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb ft). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb ft).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (4). Tighten the fuel injection line adapter nuts (5) to a torque 40 7 N m (30 5 lb ft) with Tool (A).
Do not let the tops of the fuel nozzles turn when the fuel

Have questions with 105952-2480?





Group cross 105952-2480 ZEXEL

Mitsubishi 

9 420 614 594 
ME748569 
ACTUATOR
F 019 Z6E 002 
ME748441 
ACTUATOR
9 420 614 743 
 
ACTUATOR

Mitsubishi 

9 420 614 896 
ME755303 
ACTUATOR
F 019 Z9E 619 
ME756401 
ACTUATOR

Hino 

F 019 Z6E 003 
224001470A 
ACTUATOR

Isuzu 

9 420 614 954 
1157900410 
ACTUATOR
F 019 Z3E 474 
1157900411 
ACTUATOR
9 420 614 843 
1157900360 
ACTUATOR
F 019 Z3E 530 
1157900361 
ACTUATOR
 
 

Mitsubishi 

9 420 614 501 
ME748334 
ACTUATOR
9 420 614 547 
ME748337 
ACTUATOR

Nissan-Diesel 

105952-2480  
9 420 614 727 
1910696600 
ACTUATOR

Hino 

9 420 614 644 
224001780A 
ACTUATOR
F 019 Z2E 699 
224002530A 
ACTUATOR
Back to top